CategoryQuality, Inspection & Standards

Titanium tube testing
Hydrostatic vs EC

Match the inspection method, manufacturing stage and report to the evidence your purchase actually requires.

PurposeCoverageRecords
Conceptual illustration of titanium tubes, an inactive inspection probe and a generic pressure-test fixture
DefineThe test requirement
VerifyThe examined material
AI illustration; not a production or inspection record.

Quick answer

Hydrostatic testing evaluates a defined liquid-pressure test; eddy current examination evaluates electromagnetic responses associated with relevant tube-wall conditions. A pass in one does not automatically replace the other. The ordered product standard, manufacturing route, edition and project requirements determine the required combination and acceptance evidence.

A pressure test and a wall examination answer different questions

A titanium tube quotation may offer hydrostatic testing, eddy current examination, or several tests together. Before comparing prices, identify the question each test must answer. Does the order require evidence that an individual tube meets a specified liquid-pressure test? Does it require examination for relevant discontinuities? Or does an installed exchanger need an assessment of deterioration? These are related tasks, but their acceptance evidence is different.

Hydrostatic testing applies liquid pressure under a defined procedure and evaluates the specified response, including leakage where required. Eddy current testing uses an electromagnetic response to examine conductive material. Neither phrase alone defines pressure, sensitivity, coverage, acceptance criteria or the delivered report. A purchasing line that says fully tested leaves too much unresolved for a meaningful comparison between suppliers.

The public scope of ASTM E1003 describes hydrostatic leak testing of components using internal liquid pressure. It is a leak-testing practice, not a universal titanium-tube product specification or an automatic design-pressure calculation. The product standard, equipment code and approved project procedure determine the applicable requirement. Do not borrow a pressure multiplier from an unrelated vessel or piping application.

For electromagnetic examination, ASTM E426’s public scope includes titanium tubular products. It also explains that indications may arise from geometry or material variations, so an indication does not automatically mean a rejectable defect. Its scope does not specifically cover internal coils used for installed-tube examination. Confirm the relevant practice and procedure rather than applying one reference to every inspection stage.

Consider a replacement bundle order. The mill may examine straight tubes before cutting and shipment; the fabricator may later bend, expand or weld them; the owner may test the assembled exchanger. A good mill result concerns the state examined at that time. It does not prove that subsequent fabrication introduced no damage or that every completed tube-to-tubesheet joint is leak-tight.

The useful procurement decision is therefore a test matrix attached to the product and stage. Name the required method, governing document, scope, acceptance reference and record. If the purchaser accepts an alternative, record the engineering basis and contractual approval. Do not let the word or appear in a quotation without identifying who is permitted to choose and whether that choice satisfies the order.

This guide supports purchase planning for titanium heat exchanger tubes. It does not provide an operating procedure for a pressure test or set a universal flaw allowance. Those decisions belong in controlled project documents. Its aim is to make supplier offers and inspection records comparable before material arrives and before a disagreement becomes an installation delay.

Match the result to its actual coverage

A hydrostatic pass means the item met the stated test criteria under the recorded conditions. It does not establish that the wall contains no discontinuities. NASA’s historical reliability-centred maintenance guide distinguishes pressure-boundary leakage checks from examinations of flaws that have not penetrated the wall. It also distinguishes component tests from the integrity of a completed system. Preserve those boundaries when describing purchased material.

Eddy current examination can respond to relevant wall changes without waiting for a through-wall leak. Its capability depends on the technique, tube, reference standard and procedure. The ASNT overview identifies frequency, conductivity, permeability and geometry among the influences on response and penetration. A generic claim that eddy current finds every defect ignores the practical need to demonstrate sensitivity to the features of concern.

Method comparison for purchasing; no universal test pressure or detection threshold is implied
QuestionHydrostatic testEddy current examination
Physical basisLiquid pressure and the specified responseElectromagnetic response of conductive material
Useful evidenceCompliance with the defined pressure-test criteriaResponse to relevant discontinuities under the defined examination
Does a pass prove no flaws?NoNo
What must be recorded?Item, procedure, conditions, result and acceptance referenceItem, technique, reference, coverage, indications and disposition
Automatic substitution?Only an option permitted by governing requirements and the approved order

Separate detection from sizing and acceptance. A system may detect a response without providing a reliable depth estimate for every discontinuity shape. A reported signal amplitude is not automatically a measured crack depth. Ask how an indication is characterised, what uncertainty or limitation applies, and how the governing criteria convert that evidence into an accept, investigate or reject decision.

Likewise, distinguish test completion from conformance. An inspection contractor can complete the planned scan and report unresolved indications. That is not the same as releasing every tube for use. The purchasing documents should identify who evaluates results, who may approve a concession, and how the final status is communicated. Keep an explicit hold status where required information remains open.

A simple report comparison illustrates the issue without inventing a standard. Offer A includes a signed statement that a specified lot passed its approved hydrostatic procedure. Offer B includes electromagnetic records against a named reference tube. The reports are not interchangeable merely because both are marked pass. Compare each with the contract’s required method and evidence, then request any missing scope or approved alternative.

Do not turn a supplier’s equipment list into an inspection guarantee. Ownership of a pressure rig or a modern instrument says little about the actual order unless the procedure, setup and acceptance are identified. The useful evidence is the controlled examination performed on the defined material, supported by personnel and equipment records appropriate to the project.

Diagram separating liquid-pressure test evidence from electromagnetic examination evidence
Industrial buying guide / 02Two methods, different evidence

The comparison shows purposes, not a universal substitution rule or a pressure-test procedure.

Read the ordered edition and manufacturing route together

First establish whether the material is ordered as condenser or heat exchanger tubing, process pipe, or another product. The title titanium tube is not enough to select all requirements. The existing B338, B861 and B862 guide addresses that product distinction. This article concentrates on how to specify the inspection once the product definition is settled.

The public ASTM B338 summary addresses titanium tubing for condensers, evaporators and heat exchangers and describes different testing combinations for different manufacturing routes. That is sufficient reason to avoid a blanket rule that either hydrostatic or eddy current testing always completes B338 acceptance. Review the controlled edition, product route and purchase requirements, including any other prescribed examinations.

Write the agreed edition into the purchase order. The newest catalogue entry is useful for checking status, but an existing project may specify another edition through its approved design or contractual basis. Resolve any proposed change before production. A supplier should not silently substitute a later edition, and a buyer should not assume an undated abbreviation identifies every requirement needed for release.

Identify the manufacturing route accurately. Seamless, welded and welded/cold-worked descriptions are not interchangeable labels for this review. If the supplier’s certificate uses a different route from the quotation, clarify the discrepancy and reassess the inspection requirements. A matching chemical grade does not resolve a mismatch in product manufacture or the tests associated with that route.

Next identify the examination stage. Testing a long tube before final cut lengths are produced creates a traceability question: how are the tested lengths connected to the shipped pieces? Testing before bending or another operation creates a different question: which later requirements apply to the altered part? Describe the actual sequence instead of treating tested as a permanent property that follows material without qualification.

For welded tube, ask how the examination addresses the relevant weld and parent-material requirements. Do not assume a general tube scan proves every requested weld characteristic. Conversely, a focused weld examination may not cover the entire tube wall. The procedure and report should state their scope, with additional examinations where the governing documents require them.

If the project needs witnessing, agree the notification point and documentation before testing. A witness cannot retrospectively observe an operation already completed. Define whether the buyer reviews procedures, attends a test, reviews records or releases a hold point. These are different commercial and quality activities, and their timing can affect delivery even when the physical test itself is straightforward.

Record deviations separately from routine clarification. Replacing a required method, reducing coverage or accepting an untested region changes the acceptance basis. Refer it to the authorised technical function and retain the decision with the order. A verbal comment that another customer accepts the same practice is not approval for your project or a substitute for the agreed specification.

Probe suitability matters more than a method label

For an eddy current proposal, provide tube grade, outside diameter, wall, length and manufacturing condition, together with the examination objective. The inspection specialist then selects and justifies the technique. Do not specify a frequency merely because it appeared in a report for a different tube. Material and geometry affect the electromagnetic response, and the correct setup must address the actual acceptance task.

Evident lists high-resolution probes intended for thin tubing, including titanium. This establishes the availability of relevant equipment, not universal coverage for every wall and defect. Ask the provider to connect the selected probe and reference standard to the tube being examined. A product brochure is supporting context; the examination procedure and demonstrated capability are the documents that matter to the order.

Reference features are used to establish and check system response. They should match the governing procedure and its requirements. Do not describe an artificial hole or notch as identical to every natural discontinuity. The receiving team should know which reference was used, how its identity is controlled, and how the examination’s acceptance level relates to that reference.

Ask specifically about ends, supports, bends and other regions where geometry or access affects examination. End effects are a documented subject in eddy current tube research. The correct response is a stated coverage limitation and the applicable treatment of that region, not an unsupported claim of zero unexamined length. Where another method or trimming is required, make it part of the agreed scope.

For an installed exchanger, a tube map and access plan are essential commercial inputs. Tubes may be obstructed, plugged or inaccessible, and probe travel can differ from the nominal tube length. The report should identify what was actually examined and what was not. An overall percentage inspected should not conceal that a particular critical region or tube was unavailable.

Eddyfi’s condenser-weld application note explains limitations of conventional bobbin responses for local weld flaws and discusses array examination. Its illustrated measurement example is stainless steel, so it should not be presented as measured titanium performance. The purchasing lesson is to match technique to the target feature and preserve the material and configuration behind any demonstration offered as evidence.

Do not automatically order the most elaborate instrument. Define the relevant damage or manufacturing concern, then ask for a justified method and scope. Additional channels or attractive colour maps are valuable only if they improve the required assessment and can be interpreted appropriately. An uncomplicated, suitable examination with clear records can be more useful than an advanced scan with an undefined acceptance basis.

Conceptual tube coverage map with end and support regions flagged for review
Industrial buying guide / 04Record the actual examined region

Conceptual tube map; shaded end regions are illustrative and do not define a fixed unexamined length.

Make the inspection result auditable

Connect each report to the purchase order, material identity and defined inspection lot or individual tube. The needed level of identification depends on the order, but the link must survive cutting, bundling and shipment. If individual identification is required, agree a marking method that preserves the product’s specified surface condition and remains usable through the planned manufacturing stages.

A hydrostatic record should identify the applicable procedure, test item, required conditions, result and acceptance reference. Include the equipment and authorisation records required by the project. Avoid accepting only a photograph of a gauge: it may show a reading without proving the item, duration, observation or acceptance. The complete record should allow the buyer to understand what the signed result actually covers.

An eddy current report should identify the technique, reference standard, setup or procedure revision, coverage, relevant indications and their disposition. Establish whether the deliverable is a summary, tube map, raw acquisition data or a combination. Data retention and file usability are worth agreeing before inspection, particularly if future trend comparison is part of the owner’s maintenance plan.

Original purchasing checklist; adapt it to the governing specification and project
Record fieldQuestion to resolve
IdentityWhich delivered tubes does this result represent?
ProcedureWhich approved method and revision were used?
CoverageWhich regions were examined, excluded or inaccessible?
AcceptanceWhich requirement converts findings into a final status?
DispositionWho resolved indications, retests and deviations?
RetentionWhat records and data will remain available?

Check personnel requirements against the project rather than asking for an unspecified certificate. Identify the qualification or certification scheme, relevant method and authorisation required for the activity. A person qualified for another technique is not automatically authorised for this one. The responsible inspection organisation should confirm the competence and approval arrangement supporting the issued report.

Keep retests traceable. If a tube is reworked, shortened or retested after an indication, retain the original finding and the approved disposition alongside the final result. Replacing the initial report with a clean summary can remove information needed to judge compliance. The final certificate should reflect the accepted delivered condition without hiding the steps that established it.

At receipt, reconcile quantity, markings, certificates and inspection scope. Investigate mixed heats, unexplained length changes or missing reports before installation. This is a document-and-identity check, not a demand to repeat every factory test. Agree any receiving examinations in advance so that responsibilities and cost are clear and the material can move into fabrication without avoidable uncertainty.

Inspection record chain from tube identity to approved disposition
Industrial buying guide / 05Connect the report to the delivered tubes

Identity, procedure, coverage and disposition keep the result usable at receiving and release.

Buy the required evidence with the tubes

Send suppliers one common inspection matrix. For each line, state the product, manufacturing route, standard edition, examination stage, required method and acceptance reference. Add documentation, witness points and packaging requirements. This makes differences between offers visible: a lower price may omit raw data, additional testing, third-party attendance or the examination needed after a later operation.

Separate new-tube supply from installed-equipment inspection. The first normally starts with a defined product and manufacturing records; the second starts with equipment history, tube mapping, access and the owner’s assessment objectives. Combining both into one vague request makes it difficult to establish responsibility. Use distinct scope lines and identify the interface where the supplied tubes become part of the fabricated exchanger.

Ask for exceptions in writing. If a method cannot be applied to a particular size, length or configuration, request the proposed alternative and supporting rationale. Have it reviewed against the governing requirements before accepting the quotation. Do not resolve a technical exception solely through a price adjustment or a statement that the supplier usually follows a different practice.

For a new titanium tube enquiry, TiHubs can review the requested supply and documentation scope with the proposed source. Send the grade, dimensions, quantity, standard and inspection matrix. Availability, examination arrangements and delivery must be confirmed in the quotation. The project authority retains responsibility for design acceptance and for approving any change to mandated test requirements.

A practical release decision has three parts: the ordered material is identified, the required examinations are complete, and any findings or exceptions have an authorised disposition. If one part remains unresolved, keep the corresponding hold visible. This is more useful than asking which test is best in general, because it connects the inspection directly to the material the buyer intends to install.

Clarify what the phrase 100 percent tested refers to. It may describe the number of tubes processed, rather than the physical coverage of every tube or the probability of detecting every relevant flaw. Ask the supplier to distinguish population, inspected length and demonstrated capability. These are separate statements. If the order requires each tube to be examined, a lot-sampling report does not meet that requirement simply because the sampled pieces all passed.

Include the post-test delivery condition. If liquid testing is part of supply, agree the required cleanliness, drainage, drying and end protection through the applicable procedure and product requirements. If a later operation changes that condition, identify who restores it before shipment. An inspection package should not leave the buyer uncertain whether tubes arrive ready for the next approved fabrication step or require additional preparation at receipt.

Finally, give technical questions an owner and a due date. A short exception register can link the disputed requirement, supplier proposal, evidence and approving function. Close it before the relevant hold point. This prevents an unresolved inspection choice from being buried in commercial email while material moves toward an irreversible installation stage.

Specify the tube and its inspection package

Include the manufacturing route, examination stage and acceptance reference so the quotation covers the required evidence as well as material.

Information to include

  • Titanium grade, tube dimensions and quantity
  • Product standard, edition and manufacturing route
  • Required tests, stage, coverage and acceptance references
  • Reports, raw data, traceability and witness points
  • Delivery condition, packaging, destination and date

Build your RFQ checklist

Choose the product and add the information you have. Copy the resulting brief or send your requirements to TiHubs. Submitting an enquiry does not place an order.

TiHubs — EN — Hydrostatic vs Eddy Current Testing for Titanium Tubes: What Each Test Establishes

Add your details, then copy the checklist or send your requirements to TiHubs.

We use these details to respond to your enquiry. Privacy Policy.

Questions buyers ask

Can eddy current testing replace hydrostatic testing?

Only where the governing specification and approved order permit that option. Do not assume equivalence from the method names. Confirm the product route, edition, examination scope and any additional requirements. Obtain an authorised disposition for a proposed deviation before material is released.

Does a hydrostatic pass mean a tube has no defects?

No. It establishes compliance with the specified test under its recorded conditions. Discontinuities that do not produce the required detectable response may remain. Use the examinations required for the product and application, and keep component-test evidence separate from completed-equipment acceptance.

Can titanium tubing be examined by eddy current?

Yes. Titanium is included in relevant electromagnetic examination applications and in the public scope of ASTM E426. The actual technique must suit material, dimensions and objective. Installed internal-probe examination needs its own applicable procedure; one standard reference does not automatically cover every configuration.

Are all eddy current indications rejectable defects?

No. Material or geometric variations can also produce responses. Qualified evaluation against the applicable criteria determines the disposition. The report should distinguish findings, limitations and final status rather than treating every signal as a measured defect or every completed scan as an acceptance.

What should a buyer ask about unexamined regions?

Ask the provider to identify end effects, access restrictions and other coverage limitations, then state how governing requirements address them. Require the actual examined scope in the report. Do not assume a scan of every tube proves every location was examined with equal capability.

What belongs in the RFQ?

Include grade, dimensions, manufacturing route, standard edition, test methods, stage, acceptance references and records. Add traceability, witness points and delivery condition. This allows a supplier to quote the required inspection package and disclose exceptions before the order reaches production.

Keep the purchase requirements connected.

  1. Specify the evidence needed before choosing a method.
  2. Read product route and ordered edition together.
  3. Keep new-tube and installed-equipment scopes distinct.
  4. Document coverage, indications and disposition.
  5. Release material only against the complete agreed requirements.

Sources and data scope

References reviewed November 15, 2026. Public source summaries support the discussion; the controlled specification, agreed edition and approved project requirements govern acceptance.

  1. ASTM B338 — Titanium heat exchanger tubing — Public scope and summary; consult the controlled ordered edition for requirements.
  2. ASTM E426 — Eddy current examination of tubular products — Public scope distinguishes covered product examination from installed internal-coil use.
  3. ASTM E1003 — Hydrostatic leak testing — Public scope; not a universal tube test-pressure prescription.
  4. ASNT — Electromagnetic testing — Method principles and practical limitations.
  5. NASA — Reliability-Centered Maintenance Guide — Historical 2008 context, section 6.8.4.5; not a project acceptance code.
  6. Evident — High-resolution tube probes — Manufacturer describes probes for thin tubing including titanium; no universal coverage inferred.
  7. Eddyfi — Condenser tubing weld examination — Technique discussion; the illustrated measurement example is stainless steel.
  8. Theodoulidis — End-effect modelling in tube testing — Primary research abstract, 2004; supports treating end effects explicitly.