TC11 titanium alloy titanium products on a dark metallic background

TC11 titanium alloy · Alpha-beta heat-resistant titanium alloy

TC11 titanium alloy. For compressor and engine components.

Source TC11 titanium bar, disc and ring blanks, blade stock and drawing-based engine parts. Review heat treatment, test direction, elevated-temperature requirements and inspection before supply.

Start with a specification, drawing or application. We’ll help identify the details still needed.

Material review. Supply coordination.
One contact in Baoji, China.

TC11 titanium alloyTi-6.5Al-3.5Mo-1.5Zr-0.3Si
Alpha-beta heat-resistant titanium alloyCompressor discs, blades & rings
One contact20 years of founder experience · 100+ Baoji factories

01 / Product forms

Find your TC11 product.

Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TC11 titanium bar & billet — illustrative supply form
01 / 06

TC11 titanium alloy

TC11 titanium bar & billet

Starting stock for machining or further forging; distinguish finished bar from conversion billet in the purchase order.

Specification
GB/T 2965-2023 TC11 where the ordered size and condition are covered, with any approved aerospace specification added explicitly.
Dimensions & supply
Diameter or section, cut length, tolerance, straightness, surface preparation and stock allowance.
Manufacturing review
Confirm whether material is supplied for direct machining or further hot working; record required delivery and final-use conditions.
Acceptance
Agree heat identity, chemical analysis, delivery condition, sampling, mechanical tests, macro/microstructure and any ultrasonic examination before quotation. Record the actual test method and acceptance class.
TC11 disc forging blanks — illustrative supply form
02 / 06

TC11 titanium alloy

TC11 disc forging blanks

Disc stock for qualified compressor applications and other approved engine positions.

Specification
GB/T 3620.1 designation and chemistry, plus the drawing-approved forging specification and revision. A chemistry reference alone is not a finished-forging acceptance standard.
Dimensions & supply
Disc envelope, hub/web/rim sections, integral coupons and machining stock.
Manufacturing review
Define heat-treatment condition, microstructural acceptance and required room/elevated-temperature tests.
Acceptance
Directional properties, macro/microstructure, ultrasonic coverage and lot identification.
TC11 ring & annular blanks — illustrative supply form
03 / 06

TC11 titanium alloy

TC11 ring & annular blanks

Forged annular stock for drawing-specific structures or engine parts; the final duty controls the required specification.

Specification
GB/T 3620.1 designation and chemistry, plus the drawing-approved forging specification and revision. A chemistry reference alone is not a finished-forging acceptance standard.
Dimensions & supply
Outside and inside diameters, height, wall section, machining allowance and test-stock position.
Manufacturing review
Agree forging/rolling route, heat treatment and permitted section variation before production.
Acceptance
Agree heat identity, chemical analysis, delivery condition, sampling, mechanical tests, macro/microstructure and any ultrasonic examination before quotation. Record the actual test method and acceptance class.
TC11 compressor blade blanks — illustrative supply form
04 / 06

TC11 titanium alloy

TC11 compressor blade blanks

Forged blade stock for machining to the released airfoil and root geometry.

Specification
GB/T 3620.1 designation and chemistry, plus the drawing-approved forging specification and revision. A chemistry reference alone is not a finished-forging acceptance standard.
Dimensions & supply
Root envelope, airfoil stock, platform geometry, twist and dimensional datums.
Manufacturing review
Review grain flow, deformation, heat treatment and surface-layer removal.
Acceptance
Material pedigree, dimensional checks and agreed microstructure/surface examination.
TC11 compressor components — illustrative supply form
05 / 06

TC11 titanium alloy

TC11 compressor components

Application illustration: machined disc and rotor-component geometry for an approved engine design.

Specification
Engine drawing and qualified material/process requirements.
Dimensions & supply
Bore, attachment features, rim geometry, surface finish and balancing scope.
Manufacturing review
Separate raw forging acceptance from final machining and rotor qualification.
Acceptance
First-article inspection, specified NDT, test records and traceability through every manufacturing stage.
TC11 custom engine parts — illustrative supply form
06 / 06

TC11 titanium alloy

TC11 custom engine parts

Application illustration: rings, short shafts, supports and drawing-based components.

Specification
Specify the exact part and approved material route; similar engine service is not automatic approval.
Dimensions & supply
Drawing revision, dimensions, fits, tolerances, quantity and target delivery.
Manufacturing review
Review thermal exposure, joining and any dimensional stabilization required after machining.
Acceptance
Agree heat identity, chemical analysis, delivery condition, sampling, mechanical tests, macro/microstructure and any ultrasonic examination before quotation. Record the actual test method and acceptance class.

Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.

Define the shape. Share the service.

These details help turn a material enquiry into a comparable quotation.

01 / Drawing review

Drawing-controlled blanks

Provide rough and finished drawings, datum positions, critical sections, machining allowance and the intended conversion route.

Discuss your drawing

02 / Drawing review

Heat treatment & process sequence

Identify the required delivery condition and subsequent manufacturing steps. Agree process records, sampling stages and dimensional checks after thermal processing.

Discuss your drawing

03 / Drawing review

Component inspection planning

Specify surface integrity, microstructure, NDT, dimensional acceptance and traceability. Identify which tests apply to raw material and which apply to the finished component.

Discuss your drawing

02 / Material identity

What is TC11 titanium alloy titanium?

TC11 is an alpha-beta titanium alloy with nominal Ti-6.5Al-3.5Mo-1.5Zr-0.3Si chemistry. It is used in aerospace engine components such as compressor discs and blades, where strength, thermal exposure and microstructure must be reviewed together. A single generic temperature rating or tensile value is not a complete design or purchase basis.

Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.

Review itemOrder basisWhat to confirm
Material conditionDefine the ordered heat-treatment stateTie test results to the same conversion and thermal history as the supplied product.
Strength and ductilityProduct- and section-dependentSpecify tensile, proof strength, elongation, sampling location and test direction in the purchase requirement.
MicrostructureAgree acceptance limitsReview grain structure, alpha morphology, surface alpha case and metallographic sampling for the manufacturing route.
Fatigue and fractureApplication-specific validationA material tensile certificate does not establish component life. Specify any fatigue, toughness or crack-growth evaluation separately.
Non-destructive examinationDrawing / product specificationDefine method, calibration, coverage, acceptance class and reporting before production.
Selected element · wt %Reference composition
Aluminium · Al6.5 nominal
Molybdenum · Mo3.5 nominal
Zirconium · Zr1.5 nominal
Silicon · Si0.3 nominal
Titanium · TiBalance

Nominal alloying composition from GB/T 3620.1-2016. Nominal values are identity references, not acceptance ranges. The ordered specification controls full limits, interstitials, residual elements and analysis tolerances.

TC11 identity

TC11 is a distinct alloy designation. Retain the full chemistry and product specification in orders rather than describing it only as high-temperature titanium.

TC11 versus TC4

Different alloying and heat-treatment responses mean that TC4 properties or standard scope cannot be transferred directly. Review actual stress, temperature, dwell and fatigue requirements.

TC11 versus TC17

TC17 has a different beta-stabilizer content and processing route. Disc geometry alone is not evidence that TC11 and TC17 can be interchanged.

Compressor duty versus hot turbine duty

The listed engine applications refer to qualified titanium component positions. They do not imply suitability for combustion-zone or hot turbine service. Use the engine designer’s material and temperature limits.

03 / Application priorities

TC11 in application.

Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.

Application review / 01

Compressor discs

TC11 disc procurement needs a combined view of cyclic loading, thermal exposure and the approved microstructure. Hub, web and rim sections may need different sampling locations, especially where a large forging is machined into a much lighter finished component.

Products & manufacturing

Disc forgings, machined blanks and test prolongations for approved compressor positions.

Service & design review

Provide section geometry, thermal duty, required condition, specimen directions and the room/elevated-temperature test schedule. Identify any creep, rupture or fatigue qualification required by the drawing.

Purchase & inspection priorities

Agree macro/microstructure, ultrasonic coverage and test-stock allocation. A room-temperature tensile result is not a complete release basis for a thermally loaded rotor.

Send your application details

Application review / 02

Compressor blades

A compressor blade blank must support both the airfoil machining plan and the root attachment geometry. Surface-layer removal and local stock allowance deserve attention because the final airfoil is much thinner than the starting forging.

Products & manufacturing

Forged blade blanks, bar-derived preforms and approved machined stages.

Service & design review

Share the airfoil/root drawing, grain-flow requirements, section distribution, heat treatment and minimum machining allowance. Identify permitted surface treatments and repair restrictions.

Purchase & inspection priorities

Define dimensional inspection, surface examination and metallurgical checks. Blade fatigue and engine approval remain part of the component qualification programme.

Send your application details

Application review / 03

Rings & annular engine parts

TC11 rings and annular blanks should be ordered for a specific approved engine location. Thermal gradients, flange loads and attachment details can influence both material tests and machining requirements.

Products & manufacturing

Forged rings, short hollow forgings and annular machining stock.

Service & design review

Provide diameters, height, wall transitions, flange features and operating/design temperatures. Define inspection surfaces and sampling directions before the blank is finalized.

Purchase & inspection priorities

Agree the forging specification, heat treatment, NDT class and dimensional allowance. Do not assume a chemistry reference establishes acceptance of the ring.

Send your application details

Application review / 04

Shafts, hubs & engine supports

Drawing-selected shafts and support components may combine torque, bending and elevated-temperature exposure. A useful enquiry states the load-bearing features and final material condition instead of only requesting TC11 bar.

Products & manufacturing

Bar, stepped forging blanks, short shafts, hubs and machined support parts.

Service & design review

Provide bearing seats, bores, fillets, concentricity, heat treatment and any joining requirements. Define the inspection stage for critical surfaces.

Purchase & inspection priorities

Agree directional property tests, internal and surface examination, and first-article dimensions. Separate the material certificate from component performance validation.

Send your application details

Application review / 05

Elevated-temperature qualification

TC11 is associated with heat-resistant engine use, but temperature capability depends on time, stress, environment and manufacturing condition. A headline temperature without those parameters is not suitable for purchasing or design acceptance.

Products & manufacturing

Representative specimens and production-representative stock for the approved test programme.

Service & design review

State service and test temperatures, exposure duration, load mode, creep/rupture or fatigue requirements and specimen orientation. Identify the controlling design specification.

Purchase & inspection priorities

Agree the laboratory method, sampling and acceptance criteria. Do not extrapolate room-temperature results or tests on another product size to the complete duty.

Send your application details

Application review / 06

Forging and heat-treatment control

The desired TC11 properties result from the combination of deformation and thermal processing. A billet purchase and a finished forging purchase therefore need different acceptance boundaries and records.

Products & manufacturing

Conversion billet, forging preforms and heat-treated blanks.

Service & design review

Define incoming condition, forging route, process records, thermal treatment and where final microstructure and properties will be verified.

Purchase & inspection priorities

Keep melt/heat identity through conversion and record any approved deviation. Confirm the scope of upstream and downstream testing so that no critical stage is left unassigned.

Send your application details

Application review / 07

Machining & surface integrity

Disc rims, bores and blade roots can be sensitive to surface damage introduced late in manufacturing. Material purchasing should identify sufficient stock and inspection access for the intended machining sequence.

Products & manufacturing

Rough-machined discs, bar-derived parts, ring blanks and blade stock.

Service & design review

Provide critical surface zones, roughness, machining allowance, tool access and any restrictions on marking or rework. State whether further heat treatment follows machining.

Purchase & inspection priorities

Agree inspection after final material removal where required. Surface finish, absence of harmful damage and dimensional conformity are distinct checks.

Send your application details

Application review / 08

Traceable engine supply lots

Engine supply programmes often need detailed process and inspection records linked to each blank. The required document pack should be established at enquiry so the quotation includes the necessary tests and witness points.

Products & manufacturing

Controlled lots of TC11 bar, discs, rings and blade blanks.

Service & design review

Identify specification revisions, approved process/source restrictions, certificate format, marking, packing and change control. Define any third-party inspection and sample retention.

Purchase & inspection priorities

Review the complete record pack before dispatch. Supplier coordination does not replace the customer’s design authority, production approval or component-release procedure.

Send your application details
Material references: Alleima TC11 datasheet ↗ and ATI corrosion-resistant titanium alloys ↗. These describe material behavior and application considerations. Selection for a particular fluid and finished equipment requires project-specific review.

Chemical-equipment enquiry checklist

Make the corrosion duty part of the order.

A useful specification connects the environment, the supplied parts and the acceptance evidence. Share existing data first; missing details can be clarified.

01

Define the service envelope

Provide normal, minimum and maximum operating conditions, both-side media, impurities, concentration changes, deposits and cleaning cycles. Include relevant corrosion history or the test evidence your engineering team requires.

02

Define the supplied boundary

List each wetted item, drawing and material route. Separate raw material, formed or machined parts, welded subassemblies and complete equipment. Identify design-code responsibilities, joints and mating materials.

03

Define the evidence and milestones

Agree chemistry and heat identity, product-specific mechanical tests, dimensional and integrity checks, welding records where applicable and inspection hold points. State sample, third-party inspection, packaging and delivery requirements.

Example: a useful TC11 heat-exchanger tube enquiry

“TC11 titanium seamless tubes to ASTM B338-08b; OD × wall × length and quantity; straight or U-bent drawing; both-side media, temperature and pressure; tube-to-tubesheet connection; required material records, integrity tests and post-bending checks; destination and target delivery.”

For TC11, specify the agreed Chinese product route, such as GB/T 3624-2023 for seamless tube, and all equipment-specific requirements. Do not assume GB/T 3625-2007 covers TC11.

Discuss your equipment requirement

04 / Standards & documentation

Match the standard
to the product.

Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.

Hosted PDFs retain their stated editions. Publisher references open separately when no distributable PDF is provided.
Product / reviewInternational / project routeChinese referenceClarify before quotation
Identity & chemistryCustomer / OEM material specification

Do not assign an ASTM Grade number solely from this Chinese alloy designation.

GB/T 3620.1-2016View PDF ↗Full alloy designation, chemical limits, melt identity and agreed product route.
Bar, rod & starting stockAgreed bar / forging-stock specificationGB/T 2965-2023View PDF ↗Grade and dimensional coverage, condition, sampling, tensile testing, surface and required NDT.
Forgings & drawing-based partsApproved drawing and controlled process specificationAgreed Chinese aerospace / product specification, where applicableDo not release the component against chemistry alone. Agree forging route, heat treatment, microstructure, NDT and drawing inspection.
Agree the order basis.

The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.

Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.

05 / Order coordination

Know the scope
before ordering.

Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

TC11 custom engine parts — application illustration
Component application illustration. Actual material records, inspection and performance tests are defined for the order.
A quotation you can evaluate

Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.

  • Identify whether inspection, samples and tooling are included.
  • Confirm packaging, transport and delivery terms.
  • Record items that still need technical confirmation.
Acceptance agreed before supply

Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.

Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.

Delivery with clear milestones

Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.

Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.

One contact when an issue arises

Contact TiHubs with the order reference, affected items and supporting photos or inspection records.

We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.

01 / Material identity

Material records

Grade, standard, test results and heat or batch identity matched to the supplied items.

  • Material certificate
  • Heat / batch ID
  • Test results
02 / Agreed acceptance

Inspection records

Dimensional and testing records for the agreed scope, including critical drawing requirements.

  • Dimensions
  • Agreed testing
  • Acceptance criteria
03 / Ready for dispatch

Dispatch records

Item identification, packing list, protective packaging and required shipment documents.

  • Packing list
  • Item labels
  • Shipping documents

06 / Questions before sourcing

Before you specify
TC11 titanium alloy.

A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.

A useful first enquiry

  • Product and specificationProduct form, standard edition, dimensions and material condition.
  • Order and deliveryQuantity, destination and any required delivery date.
  • Acceptance requirementsDrawing revision, inspection, certificates and packaging.

Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.

Discuss your requirement

What happens next: requirement review, technical clarification, then a supply proposal and quotation.

What is TC11 titanium alloy?

TC11 is an alpha-beta titanium alloy with nominal Ti-6.5Al-3.5Mo-1.5Zr-0.3Si chemistry. It is used in aerospace engine components such as compressor discs and blades, where strength, thermal exposure and microstructure must be reviewed together. A single generic temperature rating or tensile value is not a complete design or purchase basis.

What operating temperature can I specify?

Use the approved design specification with stress, exposure duration, environment, condition and product size. TC11 has engine applications, but a single generic temperature number is not a design allowable or a guarantee for every component.

What are the main applications?

The principal directions are compressor discs; compressor blades; rings & annular engine parts; shafts, hubs & engine supports. Each requires review of the actual drawing, manufacturing route and acceptance criteria; application examples do not establish project approval.

Which product forms can be discussed?

The main forms on this page are TC11 titanium bar & billet, TC11 disc forging blanks, TC11 ring & annular blanks, TC11 compressor blade blanks. Drawing-based parts are reviewed separately. We confirm size capability, quantity, condition and inspection with the supply proposal.

Which standards belong on the purchase order?

Specify the Chinese designation chemistry, applicable product standard and edition, and any drawing-approved aerospace or customer specification. GB/T 2965-2023 provides a bar route for TC11 within its scope. Forgings need their own acceptance requirements; do not apply a generic Grade 5 ASTM standard.

Why must heat treatment and test direction be stated?

The same alloy name can cover different microstructures and property levels. Section, deformation, final condition and specimen direction affect acceptance. State the required tests and their locations; laboratory reference values are not universal finished-part allowables.

What inspection and traceability can be arranged?

Agree chemistry, mechanical tests, macro/microstructure, ultrasonic or surface examination, dimensions and certificate fields before production. Define test methods and acceptance classes, not only “100% inspected”. Independent inspection and witness points can be discussed.

What information is needed for custom parts?

Send the released drawing, alloy and specification revisions, dimensions and tolerances, quantity, final condition, critical features and required delivery. Include qualification, sample, NDT, material-direction and document requirements so these are included in the quotation.

What are the MOQ, lead time and sample arrangements?

These are order-specific and depend on form, size, tooling, manufacturing route and inspection. TiHubs confirms proposed milestones and sample approval in the quotation. Material or process substitutions require written agreement; issues are reviewed against the documented order scope.

07 / Your next step

Start with the
requirement you have.

Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.

  1. Requirement review
  2. Technical clarification
  3. Supply proposal and quotation

Combine materials and parts in one enquiry.

Send one list of TC11 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.

Share the service and acceptance priorities.

Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.

Baoji, China · info@tihubs.com

Start your TC11 titanium alloy enquiry

Send your material form, drawing or process conditions. We will help clarify the remaining requirements.

Customer Feedback & RFQ Form (#6)