TA7ELI / Ti-5Al-2.5Sn ELI titanium products on a dark metallic background

TA7ELI / Ti-5Al-2.5Sn ELI · Alpha titanium alloy

TA7ELI / Ti-5Al-2.5Sn ELI. For cryogenic service.

Source TA7ELI bar, sheet, plate and forging blanks for approved low-temperature components. Define interstitial limits, delivery condition, test temperature and traceability before ordering.

Start with a specification, drawing or application. We’ll help identify the details still needed.

Material review. Supply coordination.
One contact in Baoji, China.

TA7ELI / Ti-5Al-2.5Sn ELITi-5Al-2.5Sn ELI
Alpha titanium alloyCryogenic structures & vessel stock
One contact20 years of founder experience · 100+ Baoji factories

01 / Product forms

Find your TA7ELI product.

Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TA7ELI titanium bar — illustrative supply form
01 / 06

TA7ELI / Ti-5Al-2.5Sn ELI

TA7ELI titanium bar

Machining stock for approved cryogenic fittings, structural parts and development components.

Specification
TA7ELI project bar requirements or AMS 4924 where all ordered requirements are met.
Size & delivery
Diameter, length, straightness, tolerance, surface condition and test allowance.
Manufacturing review
Identify final section, machining sequence, joining and any later thermal processing.
Inspection priorities
ELI chemistry, delivered condition, traceability and required temperature-specific tests.
TA7ELI titanium plate — illustrative supply form
02 / 06

TA7ELI / Ti-5Al-2.5Sn ELI

TA7ELI titanium plate

Flat stock for cryogenic structural machining and approved vessel-forming programmes.

Specification
TA7ELI plate requirements or AMS 4909 where applicable; agree the edition.
Size & delivery
Thickness, width, length, flatness, rolling direction and cut-edge condition.
Manufacturing review
Provide finished geometry, forming route and usable machining allowance.
Inspection priorities
Full chemistry, directional properties, surface condition and specified internal examination.
TA7ELI titanium sheet — illustrative supply form
03 / 06

TA7ELI / Ti-5Al-2.5Sn ELI

TA7ELI titanium sheet

Thin stock and cut blanks for controlled forming and welded low-temperature structures.

Specification
TA7ELI sheet requirements or AMS 4909 where applicable.
Size & delivery
Thickness tolerance, sheet size, rolling direction, flatness and surface finish.
Manufacturing review
Agree forming, trim, joint preparation and post-forming requirements.
Inspection priorities
Thickness uniformity, surface integrity and required material and weld qualification.
TA7ELI forgings & rings — illustrative supply form
04 / 06

TA7ELI / Ti-5Al-2.5Sn ELI

TA7ELI forgings & rings

Drawing-controlled forged stock for low-temperature material programmes.

Specification
TA7ELI forging requirements or AMS 4924 where the form and condition meet its scope.
Size & delivery
Blank envelope, bore allowance, section transitions, datums and test prolongations.
Manufacturing review
Define the approved forging route, thermal history and specimen positions.
Inspection priorities
Require heat and lot identity, full chemical analysis, delivery condition, dimensional results and the agreed mechanical and structural tests. Define NDT method, coverage and acceptance criteria in the order.
TA7ELI vessel-forming blanks — illustrative supply form
05 / 06

TA7ELI / Ti-5Al-2.5Sn ELI

TA7ELI vessel-forming blanks

Application illustration: open formed blanks for a separately approved pressure-vessel manufacturing route.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Diameter, depth, wall allowance, trim line and critical radii.
Manufacturing review
Separate material and blank supply from welding, finished-vessel testing and design-code responsibility.
Inspection priorities
Wall distribution, surface quality, geometry and the agreed post-forming material checks.
TA7ELI precision machining blanks — illustrative supply form
06 / 06

TA7ELI / Ti-5Al-2.5Sn ELI

TA7ELI precision machining blanks

Application illustration: rough-machined fittings and stepped stock for project-controlled components.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Drawing revision, minimum stock, datum faces and quantity.
Manufacturing review
State the delivered stage, critical surfaces and final low-temperature qualification plan.
Inspection priorities
Require heat and lot identity, full chemical analysis, delivery condition, dimensional results and the agreed mechanical and structural tests. Define NDT method, coverage and acceptance criteria in the order.

Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.

Define the shape. Share the service.

These details help turn a material enquiry into a comparable quotation.

01 / Drawing review

Drawing-controlled blanks

Provide rough and finished drawings, datum positions, critical sections, machining allowance and the intended conversion route.

Discuss your drawing

02 / Drawing review

Heat treatment & process sequence

Identify the required delivery condition and subsequent manufacturing steps. Agree process records, sampling stages and dimensional checks after thermal processing.

Discuss your drawing

03 / Drawing review

Component inspection planning

Specify surface integrity, microstructure, NDT, dimensional acceptance and traceability. Identify which tests apply to raw material and which apply to the finished component.

Discuss your drawing

02 / Material identity

What is TA7ELI / Ti-5Al-2.5Sn ELI titanium?

TA7ELI is the extra-low-interstitial Ti-5Al-2.5Sn alloy route. Cryogenic structural and pressure-containing component manufacture is the main purchasing focus. Lower interstitial limits distinguish the material from ordinary TA7; the complete chemistry, product specification and required low-temperature evidence must be identified in the order. A material certificate is separate from vessel design or component approval.

Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.

Review itemOrder basisWhat to confirm
Material conditionDefine the ordered heat-treatment stateTie test results to the same conversion and thermal history as the supplied product.
Strength and ductilityProduct- and section-dependentSpecify tensile, proof strength, elongation, sampling location and test direction in the purchase requirement.
MicrostructureAgree acceptance limitsReview grain structure, alpha morphology, surface alpha case and metallographic sampling for the manufacturing route.
Fatigue and fractureApplication-specific validationA material tensile certificate does not establish component life. Specify any fatigue, toughness or crack-growth evaluation separately.
Non-destructive examinationDrawing / product specificationDefine method, calibration, coverage, acceptance class and reporting before production.
Selected element · wt %Reference composition
Aluminium · Al4.50–5.75
Tin · Sn2.0–3.0
Iron · Fe0.25 max
Oxygen · O0.12 max
Nitrogen · N0.035 max
Titanium · TiBalance

Selected composition limits, wt %, from GB/T 3620.1-2016. Use the complete ordered standard for all impurity, residual-element and analysis requirements. The TA7ELI footnote also limits Fe + O to 0.32 wt % maximum. These selected limits do not replace the full specification.

TA7 versus TA7ELI

The ELI designation is part of the material requirement. Ordinary TA7 cannot be substituted on the basis of the same nominal aluminium and tin contents.

Chinese and AMS routes

AMS 4909 addresses sheet, strip and plate; AMS 4924 addresses bars, forgings and rings. Compare full requirements before any TA7ELI / AMS dual-certification claim.

Low-temperature evidence

Room-temperature tensile results alone do not establish cryogenic toughness or component performance. Specify test temperature, specimen orientation and the properties required by the approved design.

Different from TC4ELI

TA7ELI is the Ti-5Al-2.5Sn family. TC4ELI is a Ti-6Al-4V family material. The common ELI suffix does not establish interchangeability.

03 / Application priorities

TA7ELI in application.

Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.

Application review / 01

Cryogenic pressure-vessel stock

TA7ELI enquiries for pressure-containing components must connect material selection with the approved design and manufacturing route. Sheet or plate acceptance is only one stage of a vessel programme.

Products & manufacturing

Sheet, plate, forged stock and forming blanks to agreed specifications.

Service & design review

Provide design code, temperature range, pressure, geometry, weld layout and forming route. Identify who holds design, welding and finished-vessel approval responsibility.

Purchase & inspection priorities

Specify chemical limits, material condition and required cryogenic tests, then define formed-blank, weld and complete-vessel acceptance separately.

Send your application details

Application review / 02

Formed hemispherical blanks

A hemisphere or other drawn shape needs adequate material allowance for thinning, trimming and dimensional correction. The supplied TA7ELI stock must represent the qualified forming route.

Products & manufacturing

Sheet or plate blanks and drawing-controlled formed shapes.

Service & design review

Define starting thickness, finished minimum wall, local radii, forming sequence and permitted thermal processing. Agree first-article inspection and the stage at which the blank is delivered.

Purchase & inspection priorities

Map wall thickness and inspect profile, surface integrity and required properties after forming. Keep the blank traceable to its starting heat.

Send your application details

Application review / 03

Low-temperature structural fittings

Cryogenic fittings and support components may combine mechanical load with contraction and repeated thermal cycling. The appropriate starting form follows the approved geometry and material specification.

Products & manufacturing

Bar, plate and forged machining blanks.

Service & design review

Provide load directions, mating materials, temperature range, thermal cycles and critical radii. Identify the machining and joining stages included in supply.

Purchase & inspection priorities

Agree dimensional and surface checks plus the specified low-temperature properties. Material test results do not independently approve the assembled joint.

Send your application details

Application review / 04

Pump & rotating-component blanks

TA7ELI stock can be reviewed for project-specified cryogenic machinery components. For rotating parts, geometry, process history and qualification need explicit control.

Products & manufacturing

Forged discs, bar and rough-machined blanks under the approved design.

Service & design review

Provide section transitions, bore and hub features, load direction, final condition and inspection access. Identify applicable source and process approvals.

Purchase & inspection priorities

Define structure, directional tests, NDT and critical dimensions. Finished component performance requires its own approved validation.

Send your application details

Application review / 05

Welded cryogenic structures

A welded assembly requires qualified joints as well as compliant base material. ELI chemistry and good base-metal results cannot substitute for procedure qualification and joint examination.

Products & manufacturing

Sheet, plate and machined joint-preparation stock.

Service & design review

Supply joint design, welding specification, cleanliness requirements, shielding controls and post-weld processing. Identify the tests required at the service temperature.

Purchase & inspection priorities

Keep base-metal, filler and weld identities traceable. Agree weld examination and mechanical evidence at the designated manufacturing stages.

Send your application details

Application review / 06

Cryogenic testing plans

The specified service environment determines what low-temperature evidence is useful. A clear test plan prevents room-temperature certificates being mistaken for cryogenic qualification.

Products & manufacturing

Representative stock, test prolongations and retained coupons.

Service & design review

State temperature, loading mode, specimen direction, test method, number of specimens and acceptance criteria. Match specimens to the production condition and section.

Purchase & inspection priorities

Report heat identity, processing state and actual test conditions with the results. Keep design allowables and procurement acceptance distinct.

Send your application details

Application review / 07

ELI chemistry control

TA7ELI procurement relies on the full interstitial and residual-element requirements, including any combined limits. Nominal aluminium and tin values alone do not identify an acceptable heat.

Products & manufacturing

Traceable bar, sheet, plate and forging lots.

Service & design review

Provide the complete ordered chemistry specification and analysis requirements. Identify any additional customer limits and restrictions on source or conversion history.

Purchase & inspection priorities

Review the full material analysis and certificates before release; retain identity through cutting, forming and machining.

Send your application details

Application review / 08

Recurring low-temperature supply

Repeat TA7ELI programmes need stable material and drawing revisions, a clear supply stage and consistent documentation. Itemized requirements help coordinate different stock forms without merging their acceptance rules.

Products & manufacturing

Scheduled raw stock and approved blanks against a controlled item list.

Service & design review

State dimensions, condition, quantities, test requirements, certificate language, packing and delivery sequence. Agree change-notification requirements.

Purchase & inspection priorities

Reconcile piece markings, test reports, processing records and dispatch documents.

Send your application details
Material references and applicable product standards are listed below. Select the delivery condition and acceptance plan for the specific product and approved application.

TA7ELI procurement checklist

Connect the application to the material order.

A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.

01

Define the application

Provide design code, temperature range, pressure, geometry, weld layout and forming route. Identify who holds design, welding and finished-vessel approval responsibility.

02

Define the supplied stage

Sheet, plate, forged stock and forming blanks to agreed specifications. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.

03

Define the acceptance evidence

Specify chemical limits, material condition and required cryogenic tests, then define formed-blank, weld and complete-vessel acceptance separately.

Example: a useful TA7ELI material enquiry

TA7ELI titanium bar; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.

Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.

Discuss your material requirement ↗

04 / Standards & documentation

Match the standard
to the product.

Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.

Hosted PDFs retain their stated editions. Publisher references open separately when no distributable PDF is provided.
Product / reviewInternational / project routeChinese referenceClarify before quotation
Identity & chemistryApproved product and project specificationGB/T 3620.1-2016View PDF ↗Review the complete chemical limits and product requirements; nominal alloy names do not establish automatic interchangeability.
AMS 4909M · sheet, strip & plateAMS 4909M · sheet, strip & platePublisher reference ↗Compare the complete ordered Chinese requirementsPublisher reference for annealed Ti-5Al-2.5Sn ELI flat products; compare the full ordered requirements.
AMS 4924K · bars, forgings & ringsAMS 4924K · bars, forgings & ringsPublisher reference ↗Compare the complete ordered Chinese requirementsPublisher reference for the stated product forms and annealed ELI alloy; not a blanket specification for every finished shape.
Drawing-based blanks & partsApproved drawing and controlled manufacturing planAgreed product / project specificationDefine the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification.
Agree the order basis.

The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.

Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.

05 / Order coordination

Know the scope
before ordering.

Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

TA7ELI precision machining blanks — application illustration
Component application illustration. Actual material records, inspection and performance tests are defined for the order.
A quotation you can evaluate

Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.

  • Identify whether inspection, samples and tooling are included.
  • Confirm packaging, transport and delivery terms.
  • Record items that still need technical confirmation.
Acceptance agreed before supply

Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.

Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.

Delivery with clear milestones

Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.

Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.

One contact when an issue arises

Contact TiHubs with the order reference, affected items and supporting photos or inspection records.

We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.

01 / Material identity

Material records

Grade, standard, test results and heat or batch identity matched to the supplied items.

  • Material certificate
  • Heat / batch ID
  • Test results
02 / Agreed acceptance

Inspection records

Dimensional and testing records for the agreed scope, including critical drawing requirements.

  • Dimensions
  • Agreed testing
  • Acceptance criteria
03 / Ready for dispatch

Dispatch records

Item identification, packing list, protective packaging and required shipment documents.

  • Packing list
  • Item labels
  • Shipping documents

06 / Questions before sourcing

Before you specify
TA7ELI / Ti-5Al-2.5Sn ELI.

A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.

A useful first enquiry

  • Product and specificationProduct form, standard edition, dimensions and material condition.
  • Order and deliveryQuantity, destination and any required delivery date.
  • Acceptance requirementsDrawing revision, inspection, certificates and packaging.

Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.

Discuss your requirement

What happens next: requirement review, technical clarification, then a supply proposal and quotation.

What is TA7ELI?

TA7ELI is the extra-low-interstitial Ti-5Al-2.5Sn alloy route. Cryogenic structural and pressure-containing component manufacture is the main purchasing focus. Lower interstitial limits distinguish the material from ordinary TA7; the complete chemistry, product specification and required low-temperature evidence must be identified in the order. A material certificate is separate from vessel design or component approval.

Can ordinary TA7 replace TA7ELI?

No automatic substitution is appropriate. ELI chemistry requirements are part of the material identity, and the complete product and qualification requirements must be met.

Which forms are the main focus?

Bar, sheet, plate and drawing-controlled forgings are the main enquiry forms. Formed and machined blanks require review of the approved route and actual supply capability.

Which AMS specifications are relevant?

AMS 4909 addresses annealed Ti-5Al-2.5Sn ELI sheet, strip and plate. AMS 4924 addresses bars, forgings and rings. Specify the required edition and compare full requirements with TA7ELI.

Does ELI mean medical implant approval?

No. ELI describes controlled interstitial content. This page focuses on cryogenic material programmes; any medical or other regulated application requires its own specified material and device qualification.

Are room-temperature tests enough?

Only if the approved procurement specification says so. Where cryogenic properties are required, define test temperature, method, direction and acceptance separately.

Can TiHubs supply a finished certified vessel?

The scope must be agreed for the project. Raw material or formed blanks do not include an automatic finished-vessel certification, design approval or pressure rating.

What inspection is important?

Require heat and lot identity, full chemical analysis, delivery condition, dimensional results and the agreed mechanical and structural tests. Define NDT method, coverage and acceptance criteria in the order. Add the required cryogenic material, forming and weld tests for the project.

What should a TA7ELI RFQ include?

Include form, dimensions, quantity, full specification, condition, drawing, service temperature, qualification and testing, supplied stage and destination.

07 / Your next step

Start with the
requirement you have.

Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.

  1. Requirement review
  2. Technical clarification
  3. Supply proposal and quotation

Combine materials and parts in one enquiry.

Send one list of TA7ELI forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.

Share the service and acceptance priorities.

Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.

Baoji, China · info@tihubs.com

Start your TA7ELI / Ti-5Al-2.5Sn ELI enquiry

Send your material form, drawing or process conditions. We will help clarify the remaining requirements.

Customer Feedback & RFQ Form (#6)