Silver titanium helical and serpentine heat transfer tube coils in a dark studio

Titanium
coils

Titanium tube coils for defined heating and cooling duties. Bring the process conditions, installation envelope and connection drawing together before the bending and fabrication route is agreed.

View specifications
20 years in titanium100+ Baoji factory connections
Tube geometry. Installation fit. Defined duty.

Coils shaped around the installation

These are tubular heat-transfer products. Select the coil geometry around the tank, process equipment or replacement assembly.

Helical immersion coils

Helical immersion coils

Define the coil outside envelope, tube size, number of turns, pitch and riser height. Include the tank opening and installation path, not just the final space available inside the vessel.

  • Coil diameter, pitch and overall height
  • Tube OD, wall and bend-radius requirements
  • Risers, supports and insertion clearance

Define your coils

Send the operating conditions and drawing requirements. Materials, feasibility, quantity, lead time and acceptance are confirmed through project review.

Order itemInclude in your enquiryWhy it matters
Service dutyHeating / cooling duty, fluids, flow and temperaturesDefines the thermal review
Pressure basisOperating / design pressure on each relevant sideSeparates operation from design acceptance
Tube materialGrade, tube specification, condition and traceabilityEstablishes the starting material
Tube dimensionsOD, wall, tolerances and minimum wall after formingControls tube and bend acceptance
Coil geometryDiameter / panel envelope, pitch, turns and bend radiiEstablishes the installation shape
InterfacesRiser lengths, end connections, orientation and supportsChecks fit with the surrounding equipment
InspectionGeometry, joining records, NDT and leak / pressure testsMakes methods and limits explicit
Supply packageQuantity, drawings, cleanliness and transport protectionDefines the complete delivery scope

Your starting specification.

Customer Feedback & RFQ Form (#6)

Include Both process media, duty, temperatures, design pressure, tube OD / wall, coil drawing, connections, quantity and acceptance plan.

Dimensions, availability and acceptance criteria are confirmed in the quotation and order documents. Product photographs illustrate the supply format.

Start with the grade

Explore a material guide, then tell us the exact designation required by your drawing or purchase specification.

Chinese designations and international names are reference routes, not automatic substitutes. Grade, product specification, condition and acceptance requirements must be agreed together.

Open grade cross reference ↗

Applications, with conditions

The process, operating environment and required outcome help define the structure, materials and acceptance scope.

Process-tank heating and cooling

An immersion coil sees the process liquid outside and the heating or cooling medium inside. Compatibility review must include both environments, cleaning chemicals and stagnant or fouling conditions.

What to sendTank drawing, both media, temperatures, thermal duty and installation opening.

Compact equipment integration

Serpentine and custom coils can be reviewed around an equipment envelope. Connection routing, mounting clearances and access for cleaning are as important as the overall footprint.

What to sendEnvelope, connection datums, support requirements and flow / pressure-drop limits.

Replacement coil projects

An existing coil can provide a geometry reference, but its material, wall thickness and operating history still need confirmation. Mark measured dimensions separately from original drawing requirements.

What to sendOriginal drawing, verified measurements, failure context and required improvements.

Make the coil fit the process

Resolve geometry and acceptance before tube forming. A compact coil is useful only when its interfaces and service conditions are understood.

Tube forming illustration / geometry agreed before fabrication

Tube OD + wall · bend radius · coil envelope · pitch · connection orientation

Order geometry schematic; not a dimensional product drawing.

Freeze the interface drawing

Identify coil envelope, tube centre-lines, riser dimensions, connection orientation and mounting datums. State the tolerances that control fit and the installation path.

Review the tube and bending route

Select the tube specification and delivery condition. Agree bend radius, permissible ovality, surface condition and minimum wall requirements after forming rather than assuming the straight-tube values remain unchanged.

Coordinate joints and supports

Define whether intermediate joints are permitted and what joining evidence is required. Review support locations and thermal movement within the equipment design.

Release against the agreed plan

Check dimensions and connection positions, then complete the specified joint inspection and tightness tests. Any thermal-performance commitment needs a separate defined duty and verification basis.

Inspection, agreed upfront

Specify the tests and documents that your receiving inspection needs. Scope, sampling and acceptance levels belong in the order.

Dimensional inspection illustration / agreed scope and acceptance
Order documentationTiHubs

Traceable from heat to shipment.

Material identificationGrade + specification
Batch identificationHeat / lot reference
Inspection scopeAgreed tests & results
Shipment identificationMarks + packing list
Illustrative document checklist. Not a certificate or test report.
01Tube identity

Match tube material, heat identity and records to the order.

Grade + tube specification
02Formed geometry

Check envelope, pitch, bend radius and connection datums.

Approved drawing + tolerances
03Bend condition

Agree ovality, wall and surface checks after forming.

Method + acceptance limits
04Joint inspection

Specify permitted joints, procedures and required NDT.

Joint map + inspection scope
05Tightness evidence

Define pressure / leak test media, method and acceptance.

Design basis + approved test plan
06Protected delivery

Preserve shape, cleanliness and identification in transit.

End protection + supports

Titanium Coils references

Reference documents for coils procurement. Confirm product scope, grade, delivery condition and the edition required by your order.

Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.

Explore all downloads ↗

Baoji.
One contact.

TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.

20 yearsTitanium industry experience
100+Baoji factory connections
  1. Clarify the requirement

    Confirm grade, dimensions, state, quantity and the purpose of the stock.

  2. Review the supply route

    Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.

  3. Agree the commercial scope

    Confirm the quotation, lead time, acceptance requirements and delivery terms.

  4. Coordinate inspection & delivery

    Follow the agreed checks, marking, packing and shipment documentation.

Before you order

Answers to the details that make your titanium coils enquiry easier to review.

TITANIUM COILS · BAOJI SOURCING

Send your specification.

Titanium tube coils for defined heating and cooling duties. Bring the process conditions, installation envelope and connection drawing together before the bending and fabrication route is agreed.

You do not need to finalize every detail before contacting us.

Start your RFQ

Required fields *

Customer Feedback & RFQ Form