CategoryManufacturing & Customization
Precision titanium
Wire EDM vs milling
Review geometry, access and final surface integrity before choosing a route for a narrow slot or internal corner.

Quick answer
Wire EDM is a candidate for accessible through profiles and narrow features in conductive titanium. Milling can produce pockets with floors and many other features when cutter access permits. Choose against actual geometry and the accepted final surface: a precise wire-cut profile does not by itself establish compliance with recast-layer or other surface-integrity requirements.
01 / Start with the feature
Is the slot through the part, or does it have a floor?
A titanium component with a narrow slot or small internal corner can make a conventional milling quotation expensive or difficult. Wire EDM may offer another route, but the choice starts with geometry and final acceptance. Identify whether the feature passes through the workpiece, whether a floor must remain, and which surfaces carry functional requirements. A process comparison without those details can recommend a route that cannot produce the drawing.
Conventional wire electrical discharge machining uses a travelling wire electrode and electrical discharges to remove material from a conductive workpiece. The wire needs an accessible path through the part. CNC milling removes material with a rotating cutting tool and can produce pockets with a retained floor when tool access permits. Sinker EDM is a different process and should not be silently substituted for wire EDM in the comparison.
Deakin University’s description of its wire EDM facility states that the machine cuts through material thickness. This is a useful distinction for an RFQ: show the section view, not just a top outline. A rectangular shape on a drawing may represent a through opening or a blind pocket. The same plan view can therefore lead to very different manufacturing proposals and costs.
For an enclosed through profile, ask how the wire will be introduced and how the internal slug will be managed. A starting hole or another approved access route may be needed. Its position must not damage a controlled surface or leave an unapproved feature. If the profile can be entered from an outside edge, confirm that the entry path is compatible with the final part.
For milling, provide depth, wall thickness and the actual internal radius rather than drawing a visually sharp corner without a tolerance. Tool diameter and reach affect access and stability. Sandvik Coromant’s titanium component guidance identifies thin walls, deep pockets, deflection and tight corners as linked machining challenges. The supplier should review those features together instead of quoting each dimension in isolation.
Separate the feature from the entire part. A component can be milled for its faces, holes and pocket, then wire-cut for a particular through slot. Choosing wire EDM for one feature does not require every surface to be produced by that process. A combined route may preserve useful datums and avoid forcing a difficult feature into a manufacturing method selected for unrelated geometry.
This guide concerns precision features in machined titanium components. For primary sheet blanking, use the separate laser versus waterjet cutting guide. Here the decision includes final geometry, surface integrity, finishing access and inspection, because an accurate cut alone may not complete the requirements of the delivered part.

Conceptual feature comparison: a through opening and a pocket with a retained floor need different access reviews.
02 / Corners and process limits
A small internal radius is still a radius
Wire EDM can produce small internal radii, but it does not create a mathematically sharp internal corner. CHMER’s manufacturer guidance relates the effective offset to wire radius and discharge gap. The gap depends on the process, so wire diameter alone is not the finished-feature specification. Request the achievable corner and profile for the actual part thickness, material and selected finishing route.
For ordinary side milling with a round tool, the cutter geometry constrains the internal corner. A smaller cutter may reach a smaller radius, but its usable reach and stability must also be considered. The manufacturing review should identify whether the radius is functionally necessary or can be changed by the designer. A supplier must not enlarge it merely to simplify production without approval.
| Feature or concern | Conventional wire EDM | CNC milling |
|---|---|---|
| Through profile | Candidate where wire access and support are feasible | Candidate where cutter access and geometry permit |
| Blind pocket with floor | Not the normal through-wire cutting configuration | Candidate with suitable tool access |
| Internal corner | Wire radius, gap and process accuracy matter | Cutter geometry, reach and toolpath matter |
| Material removal | Electrical-discharge erosion | Mechanical cutting |
| Surface review | Address recast and other specified surface-integrity requirements | Address finish, burrs and machining-related surface condition |
| Finished-part approval | Dimensions, surface requirements and records must all meet the drawing | |
Do not use a machine brochure’s positioning accuracy as a guaranteed tolerance on your part. Workpiece thickness, setup, geometry, thermal conditions and inspection strategy affect the delivered feature. Ask for a route-specific capability statement and first-article evidence where required. The drawing tolerance remains the acceptance requirement; the machine specification is only one part of the proposed manufacturing capability.
State whether taper is required, limited or prohibited. Measuring a slot at one face does not establish its width throughout the thickness. The inspection plan should address the controlled profile, straightness and orientation relative to datums. If the supplier proposes a special setup or compensation, evaluate the final measurable result rather than requiring the buyer to approve proprietary machine settings without a relevant basis.
Keep intersecting features visible. A narrow slot near a bore, thin rib or external wall may affect workholding and the order of operations. An isolated screenshot of the slot cannot show those interactions. Provide the complete model and drawing, and identify which document controls when they disagree. Resolve contradictions before the first setup so that dimensional acceptance is not negotiated after machining.
If a design change is possible, ask for specific alternatives with their consequences. A larger internal radius, a permitted relief or a different feature sequence may simplify manufacture. Each is a proposal for engineering review, not an automatic permission to alter the part. Compare the approved options on function, inspection and delivered cost, keeping the accepted geometry explicit in the revised drawing.
03 / Surface integrity
A dimensional pass does not establish the surface condition
Wire EDM removes material through local electrical discharges. Some molten material can resolidify at the cut surface, creating a recast layer. The relevant requirement may address that layer, cracking, other altered material or the final surface more broadly. Identify the actual drawing and application requirements rather than assuming every wire-cut surface is either automatically unacceptable or automatically ready for service.
A 2022 primary study of Ti6Al4V examined the recast layer using micro-pillar compression and nanoindentation and observed different behaviour from the underlying alloy. It did not investigate the removal process itself. This supports treating the altered surface as a separate engineering concern, but does not establish a universal layer thickness or a removal allowance for your component.
A 2026 milling and wire EDM study included Ti-6Al-4V and compared specimens made under stated conditions. The reported surface and tensile differences belong to those specimens and routes. They should not be turned into a rule that every wire-cut titanium part has the same roughness or loss of ductility. Production acceptance needs the applicable specification and representative evidence.
Distinguish roughness from surface integrity. A low Ra reading describes a specified topographic measurement; it does not by itself prove the absence of recast material or microcracks. Conversely, a metallographic section addressing an altered layer does not establish every dimensional or texture requirement. Use the appropriate evidence for each characteristic instead of treating a smooth appearance as a complete inspection.
Milling also needs a controlled surface outcome. Mechanical cutting can leave burrs, tool marks and other conditions that require review against the drawing. Do not describe it as a process that produces a perfect or unaffected surface by definition. The comparison is between qualified manufacturing routes and their delivered results, including finishing and inspection, rather than a good process and a bad process in the abstract.
For fatigue-sensitive or otherwise critical surfaces, identify the governing surface-integrity requirement before requesting a quote. If electrical-discharge machining is restricted or needs approval, make that visible in the RFQ. A shop cannot reliably price the required evidence if it learns about an altered-layer limit only after producing the part. Early clarity allows the route and finishing allowance to be planned together.
If a supplier cites research, check the material and process behind the claim. A result for another alloy, a different discharge route or an unfinished specimen may not represent the proposed component. Use studies to identify questions and mechanisms, then require the evidence appropriate to the actual order. This keeps useful technical references from becoming unsupported production guarantees.

Conceptual layers, not a micrograph or a prescribed removal depth.
04 / Finishing and allowances
Plan the accepted surface before making the cut
State whether the wire-cut surface is the final surface or an intermediate stage. If subsequent removal is required, identify the approved method, access and verification. A narrow slot that can be wire-cut may be difficult to finish internally. The geometry review therefore needs to include the tool or process that produces the accepted final condition, not only the operation that creates the initial opening.
Do not assign one universal recast-removal depth to all titanium parts. The altered region depends on the actual process, and the required endpoint depends on the specification. The supplier should establish an appropriate route with evidence representative of the relevant material and geometry. A depth copied from an unrelated paper can remove too little, consume too much tolerance or fail to address the controlled surface condition.
Skim or trim cuts can be part of an EDM finishing strategy, but their number alone is not acceptance evidence. Ask what final dimensions, texture and surface condition the complete route achieves. A statement such as three passes describes an operation count, not the condition left on every feature. If the process is qualified through a particular sequence, preserve the relevant controls for repeat production.
Plan material allowance in the correct direction. Finishing an internal slot can change width and corner form; finishing an external profile changes its envelope. The supplier needs enough material to reach the final condition without exceeding tolerances. Ask how intermediate and final dimensions are controlled, especially when another operation follows the dimensional measurement used to release the initial cut.
Include edges and transitions. Deburring, polishing or blending may alter a small radius that the drawing carefully controls. An instruction to remove all sharp edges can conflict with a specific functional edge requirement unless the permitted treatment is defined. Use clear notes for the relevant locations and inspect them after the last operation capable of changing their form.
Review the sequence around heat treatment, rough machining and final feature generation where the part specification requires it. Removing material can release existing stresses and change the shape of a slender component; the absence of ordinary cutter forces during EDM does not prove zero distortion. The manufacturing plan should control the final geometry after unclamping and after subsequent operations, as required by the drawing.
Agree how interrupted work or repairs are handled. A wire break, local rework or a revised finishing operation may require additional examination depending on the specification and approval basis. The supplier should follow a documented disposition rather than blend a visible mark and assume the original process claim still applies. Keep the delivered feature traceable to the route and evidence that established its conformity.
05 / Inspection and first article
Connect the measurement to the difficult feature
Define inspection access at the quotation stage. A narrow or deep feature may be difficult to measure with the buyer’s usual equipment. Agree a suitable method for width, profile, internal radius and orientation, including the relevant locations through the thickness. The plan should demonstrate the controlled characteristics rather than report only dimensions that happen to be easy to reach.
Use the drawing’s datum system consistently. A slot can have the correct width while being incorrectly located or oriented relative to the mating features. Ask for a first-article report that addresses the whole feature definition. If a different inspection alignment is proposed, confirm its relationship to the drawing before accepting results that appear precise but answer the wrong geometric question.
| Requirement | Evidence to define | What it does not replace |
|---|---|---|
| Profile and location | Dimensional report using specified datums | Surface-integrity evidence |
| Roughness | Parameter, location and measurement method | Recast or microcrack assessment |
| Altered surface | Applicable examination and acceptance reference | Complete geometric conformity |
| Final finishing | Route record and final-state checks | Approval of an unrecorded deviation |
| Traceability | Material, part or lot and process identity | Actual inspection results |
Where metallographic evidence is required, agree sample location, preparation, examination and acceptance with the responsible technical function. A section taken from a convenient area may not represent the difficult feature. If a witness piece is used, establish how it represents the production route. Do not label a generic micrograph as proof of the supplied part without that connection.
Keep examinations within their capability. A penetrant examination may address specified surface-breaking discontinuities, but it does not measure the thickness of an altered subsurface region. A visual check cannot replace a required microscopic assessment. The inspection plan should name methods suitable for the actual requirement and avoid adding familiar tests that do not answer the question being asked.
First-article approval should include the final delivered state. If the part will be coated, cleaned or otherwise treated after machining, identify which measurements or examinations must occur afterwards. Retain the approved sequence and report revisions. A conforming intermediate sample is useful process evidence, but it should not be described as the finished production configuration when later operations remain unreviewed.
At receipt, reconcile the part revision, material identity and inspection package. Review any concessions and confirm they were authorised for the delivered quantity. Protect small slots and edges from handling damage during unpacking and subsequent assembly. Receiving acceptance should preserve the link between the measured first article, production lot and the exact features the buyer needs to use.
Retain measurement units and the reported uncertainty or capability information required by the inspection plan. A result printed with many decimal places is not automatically suitable evidence for a tight tolerance. The measurement approach should be capable of resolving the controlled feature and should identify any access limitation that prevents a complete assessment of the specified geometry.

Keep initial machining, finishing and final evidence connected to the drawing.
06 / Quotation and route choice
Compare cost per accepted component
Request a complete route rather than separate hourly rates. For wire EDM, the quotation may include access preparation, setup, cutting, skim passes, finishing and inspection. For milling, it may include tools, programming, workholding, roughing, finishing and deburring. The relevant comparison is the cost and lead time of a conforming part with the same documentation, not the speed of one machine operation.
Describe quantity and repeat demand honestly. A prototype route may minimise initial tooling while a recurring order justifies dedicated workholding or development. Do not assume one process becomes cheaper at a universal batch size. Ask each supplier to explain the quoted basis and identify costs that recur when the drawing changes or when a new material condition is introduced.
Consider a combined route when different features favour different methods. Milling the general geometry and wire-cutting a specific through feature can be sensible if datum transfer, finishing and inspection are controlled. The offer should identify responsibility at each handover. A lower subcontract price is not a saving if the transferred part loses its datum reference or arrives without the allowance needed for final acceptance.
For a TiHubs enquiry, send the complete drawing and model, titanium grade and condition, quantity, critical features and surface-integrity requirements. State whether wire EDM is permitted, restricted or proposed as an alternative. Include the final inspection package and destination. Manufacturing route, capability and delivery are confirmed in the quotation; design changes and application approval remain with the responsible engineering authority.
A useful first-article decision records why the selected route is acceptable: it can reach the feature, produce the required geometry, deliver the specified surface and provide the evidence needed for release. If one of those remains uncertain, resolve it before the production balance. This gives the buyer a repeatable purchasing basis instead of a generic claim that wire EDM or milling is always superior for titanium.
Keep exceptions specific. If the supplier requests a larger radius, another datum setup or a different surface examination, list each change with its effect and approving function. Do not hide several technical deviations inside a single note saying subject to manufacturability. A clear exception list lets the buyer compare the original drawing with the proposed alternative and approve only the changes that preserve the intended function.
07 / Build your RFQ
Request a feature-specific titanium machining review
Send the complete geometry and identify critical surfaces so the proposed route includes final finishing and inspection.
Information to include
- Titanium grade, condition, drawing and model revisions
- Through or blind features, depth, radii and datums
- Permission or restrictions for electrical-discharge machining
- Final dimensions, texture and surface-integrity acceptance
- Quantity, first article, records, destination and date
Build your RFQ checklist
Choose the product and add the information you have. Copy the resulting brief or send your requirements to TiHubs. Submitting an enquiry does not place an order.
08 / FAQs
Questions buyers ask
Can wire EDM make a blind pocket?
Conventional through-wire cutting needs a path through the workpiece and is not the normal route for a pocket with a retained floor. Milling or another suitable process may be considered. Sinker EDM is a different method and should be evaluated separately rather than included silently in a wire EDM quotation.
Does wire EDM make perfectly sharp internal corners?
No. Wire radius, discharge gap and actual process accuracy matter. Ask for the achievable final radius on the specified titanium geometry. Do not turn a wire diameter or machine brochure into a guaranteed corner tolerance without a route-specific capability review and appropriate inspection.
Is a smooth EDM surface free of recast material?
Not necessarily. Roughness and altered-layer condition are different characteristics. A low Ra value or attractive appearance does not replace required surface-integrity evidence. Specify the relevant examination and acceptance basis, including the final state after any finishing operation.
Does every titanium part need the same removal allowance?
No. The process, geometry and required endpoint differ. Establish the finishing route and allowance using relevant evidence and the governing specification. A depth copied from a paper is not a universal purchasing rule and may conflict with the final feature tolerance.
Can milling and wire EDM be combined?
Yes, when the drawing permits the route and the handover is controlled. Milling may create general geometry while wire EDM creates a particular through feature. Keep datums, intermediate allowance, finishing and inspection connected so the complete part meets its final requirements.
What should be included in the RFQ?
Provide the drawing and model, grade, condition, quantity, critical radii and access details. State EDM restrictions and final surface-integrity requirements. Include first-article evidence and documentation so offers can be compared as complete accepted components rather than isolated machine operations.
09 / Key takeaways
Keep the purchase requirements connected.
- Separate through features from pockets with floors.
- Specify the real internal radius and datums.
- Treat surface integrity separately from dimensions.
- Plan finishing access and allowance before cutting.
- Compare complete routes to the same final acceptance.
Technical references
Sources and data scope
References reviewed November 15, 2026. Public source summaries support the discussion; the controlled specification, agreed edition and approved project requirements govern acceptance.
- Deakin University — Wire EDM facility — Primary facility description of through-thickness wire cutting.
- CHMER — Wire EDM technical FAQ — Manufacturer explanation of wire radius, discharge gap and corner geometry; no machine capability table adopted.
- Sandvik Coromant — Titanium component milling — Manufacturer discussion of pockets, thin walls and corner machining.
- Sandvik Coromant — Groove and slot milling — Tool access and slot-milling principles, not a universal titanium tolerance.
- Basak et al. — Micro-mechanical behaviour of titanium recast layer — 2022 primary study; removal methods were outside its experimental scope.
- Basak et al. — Milling and wire EDM comparison — 2026 primary study including Ti-6Al-4V; specimen-specific results are not production guarantees.