TC2 / Ti-4Al-1.5Mn titanium products on a dark metallic background

TC2 / Ti-4Al-1.5Mn · Alpha-beta titanium alloy

TC2 / Ti-4Al-1.5Mn. Structural sheet with direction and joints defined.

Discuss TC2 sheet, plate and stiffened-panel blanks around directional properties, structural geometry and the acceptance of formed and joined details.

Start with a specification, drawing or application. We’ll help identify the details still needed.

Material review. Supply coordination.
One contact in Baoji, China.

TC2 / Ti-4Al-1.5MnTi-4Al-1.5Mn
Alpha-beta titanium alloyStructural sheet & joined panel stock
One contact20 years of founder experience · 100+ Baoji factories

01 / Product forms

Find your TC2 product.

Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TC2 structural titanium sheet — illustrative supply form
01 / 06

TC2 / Ti-4Al-1.5Mn

TC2 structural titanium sheet

Flat stock for drawing-approved lightweight structural details.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Thickness, width, length, flatness and orientation marks.
Manufacturing review
Identify principal loads and the direction of bends or stiffeners.
Inspection priorities
Longitudinal and transverse tests as specified, surface quality and thickness variation.
TC2 titanium plate — illustrative supply form
02 / 06

TC2 / Ti-4Al-1.5Mn

TC2 titanium plate

Machining and structural flat stock with a defined section and condition.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Thickness, usable area, edge allowance and flatness.
Manufacturing review
Review load direction, pockets, holes and stock-removal distortion.
Inspection priorities
Section-representative properties and specified internal examination.
TC2 stiffened-panel enquiries — illustrative supply form
03 / 06

TC2 / Ti-4Al-1.5Mn

TC2 stiffened-panel enquiries

Illustrative ribbed panels for a qualified forming route.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Rib depth, spacing, radii, wall limits and trimmed envelope.
Manufacturing review
Review structural geometry, forming strain and joining access together.
Inspection priorities
Profile, thinning at rib roots and surface integrity after forming.
TC2 titanium bar — illustrative supply form
04 / 06

TC2 / Ti-4Al-1.5Mn

TC2 titanium bar

Round stock for matching structural fittings explicitly specified in TC2.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Diameter, cut length, straightness and surface finish.
Manufacturing review
Separate the bar acceptance basis from the sheet specification in the assembly.
Inspection priorities
Mechanical condition, dimensional results and heat traceability.
TC2 titanium strip — illustrative supply form
05 / 06

TC2 / Ti-4Al-1.5Mn

TC2 titanium strip

Narrow flat stock for approved stiffeners and formed attachment details.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Width, thickness, camber, edge condition and length.
Manufacturing review
Plan orientation, bends and joint interfaces before slitting.
Inspection priorities
Edge quality, dimensional consistency and the specified directional tests.
TC2 structural bracket blanks — illustrative supply form
06 / 06

TC2 / Ti-4Al-1.5Mn

TC2 structural bracket blanks

Drawing-based brackets and mounting plates for defined load paths.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Datums, bolt pattern, section changes and machining allowance.
Manufacturing review
Review fatigue-sensitive transitions and final processing stage.
Inspection priorities
Critical dimensions, surface integrity and acceptance linked to the material lot.

Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.

Define the shape. Share the service.

These details help turn a material enquiry into a comparable quotation.

01 / Drawing review

Load-carrying sheet details

Sheet and orientation-marked flat blanks. Specify representative test orientation and thickness, then inspect the finished geometry separately.

Discuss your drawing

02 / Drawing review

Stiffened lightweight panels

Sheet and drawing-controlled stiffened panels. Inspect local thinning, profile and cracks at rib transitions; define structural validation at component level.

Discuss your drawing

03 / Drawing review

Spot-welded structural joints

Sheet coupons, overlap blanks and strip stiffeners. Agree joint-strength, nugget and failure-mode criteria rather than relying only on parent-sheet tensile data.

Discuss your drawing

02 / Material identity

What is TC2 / Ti-4Al-1.5Mn titanium?

TC2 is the Ti-4Al-1.5Mn alloy system. Compared with the TC1 page emphasis on low-alloy sheet conversion, this page concentrates on structural flat products and the effect of rolling history, material direction and joining on a finished panel. Research describes TC2 using both near-alpha and alpha-beta terminology; product-specific mechanical and microstructural requirements remain the practical basis for procurement.

Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.

Review itemOrder basisWhat to confirm
Structural sheet propertiesOrdered thickness and conditionDefine strength and ductility requirements with rolling direction and section sampling.
Texture and anisotropyBlank orientationReview longitudinal and transverse behavior when forming stiffeners and loaded panels.
Stiffened-panel geometryForming sequenceAgree flange angles, corner radii and springback allowance for the intended reinforcement layout.
Joint strengthActual connection geometryQualify weld or mechanical joints for the gauge, overlap and load direction involved.
Surface and edgesFatigue-sensitive locationsDefine edge finishing, allowable scratches and inspection after forming and joining.
Selected element · wt %Reference composition
Aluminium · Al3.5–5.0
Manganese · Mn0.8–2.0
Iron · Fe0.30 max
Oxygen · O0.15 max
Hydrogen · H0.012 max
Titanium · TiBalance

Selected composition limits, wt %, from GB/T 3620.1-2016. Use the complete ordered standard for all impurity, residual-element and analysis requirements.

TC2 versus TC1

TC2 has a higher aluminium range. Compare actual directional properties and forming requirements before substituting one for the other.

Longitudinal versus transverse results

Rolled-sheet behaviour can depend on direction. A single tensile result is not necessarily representative of every orientation in the component.

Sheet versus stiffened panel

The finished structural response also depends on thickness distribution, ribs, attachment geometry and joints. Raw-sheet strength is only one input.

Research condition versus supplied stock

Rolling and heat-treatment studies explain trends but do not establish guaranteed properties for another thickness, heat or supplier route.

03 / Application priorities

TC2 in application.

Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.

Application review / 01

Load-carrying sheet details

A TC2 structural sheet order should state how the sheet carries load. Directional property requirements become especially useful when bends or cut-outs change the local stress path.

Products & manufacturing

Sheet and orientation-marked flat blanks.

Service & design review

Provide principal loads, rolling direction, cut-outs and the required material condition.

Purchase & inspection priorities

Specify representative test orientation and thickness, then inspect the finished geometry separately.

Send your application details

Application review / 02

Stiffened lightweight panels

Ribs and channels can change panel behaviour without simply increasing stock thickness. The forming route must preserve the minimum wall and the intended structural profile.

Products & manufacturing

Sheet and drawing-controlled stiffened panels.

Service & design review

Supply rib spacing, depth, radii, attachment details and design-approved wall limits.

Purchase & inspection priorities

Inspect local thinning, profile and cracks at rib transitions; define structural validation at component level.

Send your application details

Application review / 03

Spot-welded structural joints

Ti-4Al-1.5Mn spot-weld research highlights the importance of joint variables. For a production assembly, acceptance should address the actual joint and load mode.

Products & manufacturing

Sheet coupons, overlap blanks and strip stiffeners.

Service & design review

Define stack thickness, spacing, edge distance, equipment and surface preparation within the qualified procedure.

Purchase & inspection priorities

Agree joint-strength, nugget and failure-mode criteria rather than relying only on parent-sheet tensile data.

Send your application details

Application review / 04

Directional-property control

Rolling history and texture can influence how TC2 sheet deforms and fractures. Buyers should make any required directional consistency visible in the purchase specification.

Products & manufacturing

Rolled sheet or plate with retained orientation and test material.

Service & design review

Specify sampling positions, longitudinal/transverse directions and any microstructure requirement.

Purchase & inspection priorities

Compare results against the ordered condition and thickness; avoid treating one research value as a universal limit.

Send your application details

Application review / 05

Machined mounting details

A flat TC2 blank for a fitting must retain enough material for datums and critical holes after machining. Local section changes deserve attention in the inspection plan.

Products & manufacturing

Plate, bar and rough structural brackets.

Service & design review

Provide net geometry, load directions, fillets, fit tolerances and finishing sequence.

Purchase & inspection priorities

Check dimensions and surface condition at load-transfer features, with NDT where the drawing requires.

Send your application details

Application review / 06

Thermal and mechanical condition review

The same nominal alloy may arrive with different processing histories. A structural purchase needs the condition that supports the approved design properties and fabrication route.

Products & manufacturing

Sheet, plate and bar as separately specified items.

Service & design review

Identify required annealing or other approved processing, downstream operations and final test stage.

Purchase & inspection priorities

Tie mechanical and microstructural reports to the delivered state and document any subsequent thermal processing.

Send your application details

Application review / 07

Transition from TC1 designs

A move to TC2 may be motivated by a different strength requirement, but it can change forming and joining behaviour. Treat it as a coordinated design and process review.

Products & manufacturing

Matched-thickness trial stock and representative structural blanks.

Service & design review

Provide the existing TC1 specification, target properties, tooling constraints and approval responsibility.

Purchase & inspection priorities

Evaluate forming, joints and component dimensions alongside the material-property comparison.

Send your application details

Application review / 08

Panel production lot consistency

Repeated structural panels benefit from controlled stock direction and a consistent material condition. Material substitution or unrecorded processing changes can undermine a previously accepted route.

Products & manufacturing

Scheduled sheet and strip lots against fixed revisions.

Service & design review

Record stock source requirements, orientation, condition and changes requiring review.

Purchase & inspection priorities

Reconcile certificates, cut-part markings and final panel inspection with the approved production lot.

Send your application details
Material references and applicable product standards are listed below. Select the delivery condition and acceptance plan for the specific product and approved application.

TC2 procurement checklist

Connect the application to the material order.

A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.

01

Define the application

Provide principal loads, rolling direction, cut-outs and the required material condition.

02

Define the supplied stage

Sheet and orientation-marked flat blanks. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.

03

Define the acceptance evidence

Specify representative test orientation and thickness, then inspect the finished geometry separately.

Example: a useful TC2 material enquiry

TC2 structural titanium sheet; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.

Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.

Discuss your material requirement ↗

04 / Standards & documentation

Match the standard
to the product.

Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.

Hosted PDFs retain their stated editions. Publisher references open separately when no distributable PDF is provided.
Product / reviewInternational / project routeChinese referenceClarify before quotation
Identity & chemistryApproved product and project specificationGB/T 3620.1-2016View PDF ↗Review the complete chemical limits and product requirements; nominal alloy names do not establish automatic interchangeability.
TC2 rolling, texture and properties studyTC2 rolling, texture and properties studyPublisher reference ↗Compare the complete ordered Chinese requirementsPrimary research on processing-dependent sheet properties; it is not a supply specification.
Ti-4Al-1.5Mn spot-weld studyTi-4Al-1.5Mn spot-weld studyPublisher reference ↗Compare the complete ordered Chinese requirementsPrimary research on joint microstructure and mechanical response; qualify the production joint separately.
Drawing-based blanks & partsApproved drawing and controlled manufacturing planAgreed product / project specificationDefine the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification.
Agree the order basis.

The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.

Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.

05 / Order coordination

Know the scope
before ordering.

Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

TC2 structural bracket blanks — application illustration
Component application illustration. Actual material records, inspection and performance tests are defined for the order.
A quotation you can evaluate

Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.

  • Identify whether inspection, samples and tooling are included.
  • Confirm packaging, transport and delivery terms.
  • Record items that still need technical confirmation.
Acceptance agreed before supply

Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.

Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.

Delivery with clear milestones

Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.

Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.

One contact when an issue arises

Contact TiHubs with the order reference, affected items and supporting photos or inspection records.

We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.

01 / Material identity

Material records

Grade, standard, test results and heat or batch identity matched to the supplied items.

  • Material certificate
  • Heat / batch ID
  • Test results
02 / Agreed acceptance

Inspection records

Dimensional and testing records for the agreed scope, including critical drawing requirements.

  • Dimensions
  • Agreed testing
  • Acceptance criteria
03 / Ready for dispatch

Dispatch records

Item identification, packing list, protective packaging and required shipment documents.

  • Packing list
  • Item labels
  • Shipping documents

06 / Questions before sourcing

Before you specify
TC2 / Ti-4Al-1.5Mn.

A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.

A useful first enquiry

  • Product and specificationProduct form, standard edition, dimensions and material condition.
  • Order and deliveryQuantity, destination and any required delivery date.
  • Acceptance requirementsDrawing revision, inspection, certificates and packaging.

Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.

Discuss your requirement

What happens next: requirement review, technical clarification, then a supply proposal and quotation.

How does TC2 differ from TC1?

TC2 has a higher aluminium range and its own product requirements. It should be reviewed for the intended structural and fabrication duty rather than treated as interchangeable.

Is TC2 the same as ASTM Grade 2?

No. Grade 2 is commercially pure titanium; TC2 is Ti-4Al-1.5Mn.

Why are directional properties emphasized?

Rolled-sheet behaviour can vary with direction. Specify test orientation and preserve rolling-direction marks on blanks where the design requires them.

Are research tensile values guaranteed for supplied sheet?

No. Processing, thickness and condition differ. Acceptance values must come from the ordered product specification or agreed requirements.

Can a stiffened panel be quoted from sheet thickness alone?

No. Rib geometry, radii, minimum wall, trim envelope and inspection targets are needed.

Does parent-sheet strength establish spot-weld strength?

No. The actual joint configuration and qualified welding procedure need their own acceptance evidence.

Can TC2 use the same forming process as TC1?

Only after review or qualification for the actual thickness, condition and geometry.

Which products should I request first?

Sheet and plate are the main focus; strip, bar and structural blanks support drawing-specific enquiries.

What should a TC2 structural RFQ include?

Include loading direction, form and dimensions, material condition, drawing revision, joining route, directional tests and final component inspection.

07 / Your next step

Start with the
requirement you have.

Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.

  1. Requirement review
  2. Technical clarification
  3. Supply proposal and quotation

Combine materials and parts in one enquiry.

Send one list of TC2 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.

Share the service and acceptance priorities.

Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.

Baoji, China · info@tihubs.com

Start your TC2 / Ti-4Al-1.5Mn enquiry

Send your material form, drawing or process conditions. We will help clarify the remaining requirements.

Customer Feedback & RFQ Form (#6)