TB3 Titanium Alloy titanium products on a dark metallic background

TB3 Titanium Alloy · Metastable beta titanium alloy

TB3 Titanium Alloy. Cold-heading stock. Controlled final strength.

Source TB3 wire, rod and fastener blanks with solution condition, heading route, ageing and defect acceptance specified as one manufacturing chain.

Start with a specification, drawing or application. We’ll help identify the details still needed.

Material review. Supply coordination.
One contact in Baoji, China.

TB3 Titanium AlloyTi-3.5Al-10Mo-8V-1Fe
Metastable beta titanium alloyCold-headed high-strength fasteners
One contact20 years of founder experience · 100+ Baoji factories

01 / Product forms

Find your TB3 product.

Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TB3 cold-heading wire — illustrative supply form
01 / 06

TB3 Titanium Alloy

TB3 cold-heading wire

Primary stock for an approved heading route followed by the specified final treatment.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Diameter, ovality, coil mass, cast, helix and surface finish.
Manufacturing review
State heading geometry, starting condition and intermediate processing.
Inspection priorities
Surface defects, diameter consistency, ductility and lot-specific acceptance.
TB3 precision bar — illustrative supply form
02 / 06

TB3 Titanium Alloy

TB3 precision bar

Machining stock for fasteners and small hardware where bar conversion is the approved route.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Diameter tolerance, straightness, length and surface preparation.
Manufacturing review
Coordinate rough machining, thread production and ageing.
Inspection priorities
Condition-specific properties and specified internal or surface examination.
TB3 straight fastener rod — illustrative supply form
03 / 06

TB3 Titanium Alloy

TB3 straight fastener rod

Straight feedstock and cut lengths for controlled production handling.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Diameter, usable length, end finish and bundle identification.
Manufacturing review
Define cutting, straightening and feeder requirements.
Inspection priorities
Straightness, end defects and consistent heat identity across lengths.
TB3 headed fastener blanks — illustrative supply form
04 / 06

TB3 Titanium Alloy

TB3 headed fastener blanks

Illustrative headed blanks supplied only against a defined manufacturing and release scope.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Head profile, shank, grip length, transition radius and thread allowance.
Manufacturing review
Separate heading, threading, heat treatment and final qualification responsibilities.
Inspection priorities
Head integrity, transitions, dimensions and required tests after final processing.
TB3 conversion stock — illustrative supply form
05 / 06

TB3 Titanium Alloy

TB3 conversion stock

Small billet and conversion enquiries for a qualified downstream route.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Section, cut weight, surface removal and test allowance.
Manufacturing review
Review the deformation path and prevention of inherited or process-induced defects.
Inspection priorities
Macrostructure, internal examination and traceable processing records.
TB3 pin and screw blanks — illustrative supply form
06 / 06

TB3 Titanium Alloy

TB3 pin and screw blanks

Drawing-controlled stepped and socket-head blank enquiries.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Critical diameters, socket geometry, datums and machining stock.
Manufacturing review
Identify finishing, surface treatment and assembly requirements.
Inspection priorities
Local surface integrity and the approved finished-hardware acceptance plan.

Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.

Define the shape. Share the service.

These details help turn a material enquiry into a comparable quotation.

01 / Drawing review

Cold-headed aerospace fasteners

Wire and straight rod for the approved heading process. Agree representative heading trials and inspection of the formed head before subsequent operations.

Discuss your drawing

02 / Drawing review

Solution-to-ageing process control

Solution-condition wire or rod and blanks at the agreed stage. Retain treatment records and test the final condition required by the drawing.

Discuss your drawing

03 / Drawing review

Head and transition integrity

Headed blanks and representative destructive-test samples. Examine local cracks and defects using the approved method and sampling plan.

Discuss your drawing

02 / Material identity

What is TB3 Titanium Alloy titanium?

TB3 is a metastable beta titanium alloy associated with high-strength aerospace fastener manufacture. Its useful distinction is the combination of formable starting stock and strengthening after the approved forming sequence. A high tensile result alone cannot demonstrate sound heads, threads or internal material. This page therefore connects wire and rod purchasing to head formation, thermal processing and finished-fastener quality.

Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.

Review itemOrder basisWhat to confirm
Cold-heading feedstockSolution-treated delivery conditionSpecify wire or rod dimensions, surface quality and deformation capability for the heading route.
Ageing responseApproved final thermal cycleConnect the final strength requirement to the same heading, machining and ageing sequence used for the part.
Head integrityCritical formed zonesDefine inspection for cracks or internal discontinuities around the head and shank transition.
Threads and shankDrawing-controlled geometryAgree thread manufacture, root condition, straightness and gauging after the final processing stage.
Fastener performanceComponent qualificationMaterial tensile results do not replace required fastener tests or application approval.
Selected element · wt %Reference composition
Aluminium · Al2.7–3.7
Molybdenum · Mo9.5–11.0
Vanadium · V7.5–8.5
Iron · Fe0.8–1.2
Oxygen · O0.15 max
Titanium · TiBalance

Selected composition limits, wt %, from GB/T 3620.1-2016. Use the complete ordered standard for all impurity, residual-element and analysis requirements.

TB3 versus TB2

Both are beta-family alloys, but their alloying systems and qualified processing routes differ. A TB2 heading recipe is not a TB3 specification.

Solution condition versus aged condition

The stock state that supports heading differs from the final strength state. Name the condition at every handover.

TB3 versus TC16

Both appear in fastener material discussions. Compare the approved deformation route, thermal sequence and final fastener requirements rather than strength alone.

Strength versus internal quality

A finished fastener can contain harmful defects despite an acceptable bulk tensile result. Material soundness and local manufacturing integrity require separate controls.

03 / Application priorities

TB3 in application.

Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.

Application review / 01

Cold-headed aerospace fasteners

TB3 is used in fastener material development because a formable starting state can precede final strengthening. The head geometry and material state must be reviewed together.

Products & manufacturing

Wire and straight rod for the approved heading process.

Service & design review

Provide upset geometry, head-to-shank transition, number of forming stages and delivered stock condition.

Purchase & inspection priorities

Agree representative heading trials and inspection of the formed head before subsequent operations.

Send your application details

Application review / 02

Solution-to-ageing process control

A fastener route can fail if the incoming condition and final ageing requirement are confused. Each processing handover should identify the state being delivered.

Products & manufacturing

Solution-condition wire or rod and blanks at the agreed stage.

Service & design review

Specify the approved thermal process, section range, timing and ownership of each operation.

Purchase & inspection priorities

Retain treatment records and test the final condition required by the drawing.

Send your application details

Application review / 03

Head and transition integrity

The head-to-shank region carries concentrated stress and has experienced substantial deformation. Its quality cannot be inferred from a smooth bar coupon alone.

Products & manufacturing

Headed blanks and representative destructive-test samples.

Service & design review

Identify critical radii, permitted flow and defect criteria, plus the inspection stage before threading or coating.

Purchase & inspection priorities

Examine local cracks and defects using the approved method and sampling plan.

Send your application details

Application review / 04

Threaded screw manufacture

Thread production interacts with blank diameter, surface condition and the thermal sequence. The enquiry should state whether rolling or cutting is permitted.

Products & manufacturing

Wire-derived shanks, precision bar and screw blanks.

Service & design review

Provide thread form, root requirements, engagement, finishing and the stage of final ageing.

Purchase & inspection priorities

Inspect thread geometry and surface integrity; specify proof, torsion or fatigue testing when required.

Send your application details

Application review / 05

Assembly-sensitive hardware

Published TB3 failure analysis demonstrates why manufacturing defects deserve attention in assembly-loaded screws. A material grade name does not guarantee torque or installation performance.

Products & manufacturing

Traceable screw blanks and production-representative test pieces.

Service & design review

State installation method, lubrication, mating threads and the drawing-controlled acceptance tests.

Purchase & inspection priorities

Use the agreed finished-part mechanical and defect checks; do not infer the cause of a new failure from an unrelated study.

Send your application details

Application review / 06

Machined pins and precision shanks

For a machined TB3 pin, dimensional stability and the final thermal state matter alongside strength. Grinding and straightening responsibilities should be clear.

Products & manufacturing

Precision bar, straight rod and stepped pin blanks.

Service & design review

Provide fits, length-to-diameter ratio, surface finish and post-ageing machining allowances.

Purchase & inspection priorities

Check final straightness, size and critical surfaces after the last specified processing step.

Send your application details

Application review / 07

Internal-quality verification

The manufacturing route must control inherited defects and damage introduced during conversion. The chosen examination must suit small wire or rod as well as larger starting stock.

Products & manufacturing

Conversion stock, rod and retained representative samples.

Service & design review

Define required NDT or destructive methods, calibration, coverage and acceptance thresholds.

Purchase & inspection priorities

Link reports to the supplied lot and do not treat visual inspection as proof of internal soundness.

Send your application details

Application review / 08

First-article fastener sourcing

A new source should be evaluated with material and processing representative of the intended recurring order. Small successful samples alone do not release every size and geometry.

Products & manufacturing

Trial wire or rod and a controlled blank lot.

Service & design review

Fix drawing revision, diameter, condition, forming route and approval authority before sampling.

Purchase & inspection priorities

Compile raw-stock, process and finished-fastener evidence and define changes requiring renewed review.

Send your application details
Material references and applicable product standards are listed below. Select the delivery condition and acceptance plan for the specific product and approved application.

TB3 procurement checklist

Connect the application to the material order.

A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.

01

Define the application

Provide upset geometry, head-to-shank transition, number of forming stages and delivered stock condition.

02

Define the supplied stage

Wire and straight rod for the approved heading process. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.

03

Define the acceptance evidence

Agree representative heading trials and inspection of the formed head before subsequent operations.

Example: a useful TB3 material enquiry

TB3 cold-heading wire; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.

Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.

Discuss your material requirement ↗

04 / Standards & documentation

Match the standard
to the product.

Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.

Hosted PDFs retain their stated editions. Publisher references open separately when no distributable PDF is provided.
Product / reviewInternational / project routeChinese referenceClarify before quotation
Identity & chemistryApproved product and project specificationGB/T 3620.1-2016View PDF ↗Review the complete chemical limits and product requirements; nominal alloy names do not establish automatic interchangeability.
TB3 screw fracture investigationTB3 screw fracture investigationPublisher reference ↗Compare the complete ordered Chinese requirementsPrimary study of a specific screw failure; supports attention to process-induced defects, not a universal failure diagnosis.
Drawing-based blanks & partsApproved drawing and controlled manufacturing planAgreed product / project specificationDefine the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification.
Agree the order basis.

The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.

Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.

05 / Order coordination

Know the scope
before ordering.

Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

TB3 pin and screw blanks — application illustration
Component application illustration. Actual material records, inspection and performance tests are defined for the order.
A quotation you can evaluate

Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.

  • Identify whether inspection, samples and tooling are included.
  • Confirm packaging, transport and delivery terms.
  • Record items that still need technical confirmation.
Acceptance agreed before supply

Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.

Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.

Delivery with clear milestones

Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.

Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.

One contact when an issue arises

Contact TiHubs with the order reference, affected items and supporting photos or inspection records.

We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.

01 / Material identity

Material records

Grade, standard, test results and heat or batch identity matched to the supplied items.

  • Material certificate
  • Heat / batch ID
  • Test results
02 / Agreed acceptance

Inspection records

Dimensional and testing records for the agreed scope, including critical drawing requirements.

  • Dimensions
  • Agreed testing
  • Acceptance criteria
03 / Ready for dispatch

Dispatch records

Item identification, packing list, protective packaging and required shipment documents.

  • Packing list
  • Item labels
  • Shipping documents

06 / Questions before sourcing

Before you specify
TB3 Titanium Alloy.

A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.

A useful first enquiry

  • Product and specificationProduct form, standard edition, dimensions and material condition.
  • Order and deliveryQuantity, destination and any required delivery date.
  • Acceptance requirementsDrawing revision, inspection, certificates and packaging.

Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.

Discuss your requirement

What happens next: requirement review, technical clarification, then a supply proposal and quotation.

What is TB3 titanium mainly purchased for?

High-strength fastener manufacturing is the primary focus, especially wire and rod supporting an approved cold-heading and subsequent ageing route.

What is the nominal TB3 composition?

Ti-3.5Al-10Mo-8V-1Fe. Use the complete ordered chemistry standard for limits and residual elements.

Should heading wire arrive fully aged?

The correct starting state comes from the qualified process. A route designed around formable solution-condition stock should not receive a different condition without approval.

Can a TB2 or TC16 process be copied?

No. Similar applications do not establish identical chemistry, forming response or heat-treatment requirements.

Does tensile strength prove fastener quality?

No. Head integrity, threads, internal defects, dimensions and the specified finished-part tests also matter.

Are the shown fasteners stocked finished products?

The images illustrate potential supply forms. Blank or finished-part capability, drawing requirements and release scope must be confirmed for the enquiry.

What should be specified for wire surface quality?

Define permitted defects, finish, diameter variation and the inspection method in relation to the heading route.

Can TiHubs qualify a fastener for flight?

Material sourcing and coordination do not replace the responsible design and approval authority or the required aerospace qualification.

What belongs in a TB3 fastener-stock RFQ?

Include wire or rod size, quantity, starting condition, head geometry, thread route, final treatment, defect acceptance and finished-fastener test requirements.

07 / Your next step

Start with the
requirement you have.

Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.

  1. Requirement review
  2. Technical clarification
  3. Supply proposal and quotation

Combine materials and parts in one enquiry.

Send one list of TB3 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.

Share the service and acceptance priorities.

Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.

Baoji, China · info@tihubs.com

Start your TB3 Titanium Alloy enquiry

Send your material form, drawing or process conditions. We will help clarify the remaining requirements.

Customer Feedback & RFQ Form (#6)