
TB3 Titanium Alloy · Metastable beta titanium alloy
TB3 Titanium Alloy. Cold-heading stock. Controlled final strength.
Source TB3 wire, rod and fastener blanks with solution condition, heading route, ageing and defect acceptance specified as one manufacturing chain.
Start with a specification, drawing or application. We’ll help identify the details still needed.
Material review. Supply coordination.
One contact in Baoji, China.
01 / Product forms
Find your TB3 product.
Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TB3 Titanium Alloy
TB3 cold-heading wire
Primary stock for an approved heading route followed by the specified final treatment.
- Specification
- Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
- Size & delivery
- Diameter, ovality, coil mass, cast, helix and surface finish.
- Manufacturing review
- State heading geometry, starting condition and intermediate processing.
- Inspection priorities
- Surface defects, diameter consistency, ductility and lot-specific acceptance.

TB3 Titanium Alloy
TB3 precision bar
Machining stock for fasteners and small hardware where bar conversion is the approved route.
- Specification
- Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
- Size & delivery
- Diameter tolerance, straightness, length and surface preparation.
- Manufacturing review
- Coordinate rough machining, thread production and ageing.
- Inspection priorities
- Condition-specific properties and specified internal or surface examination.

TB3 Titanium Alloy
TB3 straight fastener rod
Straight feedstock and cut lengths for controlled production handling.
- Specification
- Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
- Size & delivery
- Diameter, usable length, end finish and bundle identification.
- Manufacturing review
- Define cutting, straightening and feeder requirements.
- Inspection priorities
- Straightness, end defects and consistent heat identity across lengths.

TB3 Titanium Alloy
TB3 headed fastener blanks
Illustrative headed blanks supplied only against a defined manufacturing and release scope.
- Specification
- Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
- Size & delivery
- Head profile, shank, grip length, transition radius and thread allowance.
- Manufacturing review
- Separate heading, threading, heat treatment and final qualification responsibilities.
- Inspection priorities
- Head integrity, transitions, dimensions and required tests after final processing.

TB3 Titanium Alloy
TB3 conversion stock
Small billet and conversion enquiries for a qualified downstream route.
- Specification
- Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
- Size & delivery
- Section, cut weight, surface removal and test allowance.
- Manufacturing review
- Review the deformation path and prevention of inherited or process-induced defects.
- Inspection priorities
- Macrostructure, internal examination and traceable processing records.

TB3 Titanium Alloy
TB3 pin and screw blanks
Drawing-controlled stepped and socket-head blank enquiries.
- Specification
- Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
- Size & delivery
- Critical diameters, socket geometry, datums and machining stock.
- Manufacturing review
- Identify finishing, surface treatment and assembly requirements.
- Inspection priorities
- Local surface integrity and the approved finished-hardware acceptance plan.
Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.
Define the shape. Share the service.
These details help turn a material enquiry into a comparable quotation.
01 / Drawing review
Cold-headed aerospace fasteners
Wire and straight rod for the approved heading process. Agree representative heading trials and inspection of the formed head before subsequent operations.
Discuss your drawing02 / Drawing review
Solution-to-ageing process control
Solution-condition wire or rod and blanks at the agreed stage. Retain treatment records and test the final condition required by the drawing.
Discuss your drawing03 / Drawing review
Head and transition integrity
Headed blanks and representative destructive-test samples. Examine local cracks and defects using the approved method and sampling plan.
Discuss your drawing02 / Material identity
What is TB3 Titanium Alloy titanium?
TB3 is a metastable beta titanium alloy associated with high-strength aerospace fastener manufacture. Its useful distinction is the combination of formable starting stock and strengthening after the approved forming sequence. A high tensile result alone cannot demonstrate sound heads, threads or internal material. This page therefore connects wire and rod purchasing to head formation, thermal processing and finished-fastener quality.
Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.
| Review item | Order basis | What to confirm |
|---|---|---|
| Cold-heading feedstock | Solution-treated delivery condition | Specify wire or rod dimensions, surface quality and deformation capability for the heading route. |
| Ageing response | Approved final thermal cycle | Connect the final strength requirement to the same heading, machining and ageing sequence used for the part. |
| Head integrity | Critical formed zones | Define inspection for cracks or internal discontinuities around the head and shank transition. |
| Threads and shank | Drawing-controlled geometry | Agree thread manufacture, root condition, straightness and gauging after the final processing stage. |
| Fastener performance | Component qualification | Material tensile results do not replace required fastener tests or application approval. |
| Selected element · wt % | Reference composition |
|---|---|
| Aluminium · Al | 2.7–3.7 |
| Molybdenum · Mo | 9.5–11.0 |
| Vanadium · V | 7.5–8.5 |
| Iron · Fe | 0.8–1.2 |
| Oxygen · O | 0.15 max |
| Titanium · Ti | Balance |
Selected composition limits, wt %, from GB/T 3620.1-2016. Use the complete ordered standard for all impurity, residual-element and analysis requirements.
TB3 versus TB2
Both are beta-family alloys, but their alloying systems and qualified processing routes differ. A TB2 heading recipe is not a TB3 specification.
Solution condition versus aged condition
The stock state that supports heading differs from the final strength state. Name the condition at every handover.
TB3 versus TC16
Both appear in fastener material discussions. Compare the approved deformation route, thermal sequence and final fastener requirements rather than strength alone.
Strength versus internal quality
A finished fastener can contain harmful defects despite an acceptable bulk tensile result. Material soundness and local manufacturing integrity require separate controls.
03 / Application priorities
TB3 in application.
Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.
Application review / 01
Cold-headed aerospace fasteners
TB3 is used in fastener material development because a formable starting state can precede final strengthening. The head geometry and material state must be reviewed together.
Products & manufacturing
Wire and straight rod for the approved heading process.
Service & design review
Provide upset geometry, head-to-shank transition, number of forming stages and delivered stock condition.
Purchase & inspection priorities
Agree representative heading trials and inspection of the formed head before subsequent operations.
Application review / 02
Solution-to-ageing process control
A fastener route can fail if the incoming condition and final ageing requirement are confused. Each processing handover should identify the state being delivered.
Products & manufacturing
Solution-condition wire or rod and blanks at the agreed stage.
Service & design review
Specify the approved thermal process, section range, timing and ownership of each operation.
Purchase & inspection priorities
Retain treatment records and test the final condition required by the drawing.
Application review / 03
Head and transition integrity
The head-to-shank region carries concentrated stress and has experienced substantial deformation. Its quality cannot be inferred from a smooth bar coupon alone.
Products & manufacturing
Headed blanks and representative destructive-test samples.
Service & design review
Identify critical radii, permitted flow and defect criteria, plus the inspection stage before threading or coating.
Purchase & inspection priorities
Examine local cracks and defects using the approved method and sampling plan.
Application review / 04
Threaded screw manufacture
Thread production interacts with blank diameter, surface condition and the thermal sequence. The enquiry should state whether rolling or cutting is permitted.
Products & manufacturing
Wire-derived shanks, precision bar and screw blanks.
Service & design review
Provide thread form, root requirements, engagement, finishing and the stage of final ageing.
Purchase & inspection priorities
Inspect thread geometry and surface integrity; specify proof, torsion or fatigue testing when required.
Application review / 05
Assembly-sensitive hardware
Published TB3 failure analysis demonstrates why manufacturing defects deserve attention in assembly-loaded screws. A material grade name does not guarantee torque or installation performance.
Products & manufacturing
Traceable screw blanks and production-representative test pieces.
Service & design review
State installation method, lubrication, mating threads and the drawing-controlled acceptance tests.
Purchase & inspection priorities
Use the agreed finished-part mechanical and defect checks; do not infer the cause of a new failure from an unrelated study.
Application review / 06
Machined pins and precision shanks
For a machined TB3 pin, dimensional stability and the final thermal state matter alongside strength. Grinding and straightening responsibilities should be clear.
Products & manufacturing
Precision bar, straight rod and stepped pin blanks.
Service & design review
Provide fits, length-to-diameter ratio, surface finish and post-ageing machining allowances.
Purchase & inspection priorities
Check final straightness, size and critical surfaces after the last specified processing step.
Application review / 07
Internal-quality verification
The manufacturing route must control inherited defects and damage introduced during conversion. The chosen examination must suit small wire or rod as well as larger starting stock.
Products & manufacturing
Conversion stock, rod and retained representative samples.
Service & design review
Define required NDT or destructive methods, calibration, coverage and acceptance thresholds.
Purchase & inspection priorities
Link reports to the supplied lot and do not treat visual inspection as proof of internal soundness.
Application review / 08
First-article fastener sourcing
A new source should be evaluated with material and processing representative of the intended recurring order. Small successful samples alone do not release every size and geometry.
Products & manufacturing
Trial wire or rod and a controlled blank lot.
Service & design review
Fix drawing revision, diameter, condition, forming route and approval authority before sampling.
Purchase & inspection priorities
Compile raw-stock, process and finished-fastener evidence and define changes requiring renewed review.
TB3 procurement checklist
Connect the application to the material order.
A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.
Define the application
Provide upset geometry, head-to-shank transition, number of forming stages and delivered stock condition.
Define the supplied stage
Wire and straight rod for the approved heading process. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.
Define the acceptance evidence
Agree representative heading trials and inspection of the formed head before subsequent operations.
Example: a useful TB3 material enquiry
TB3 cold-heading wire; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.
Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.
Discuss your material requirement ↗04 / Standards & documentation
Match the standard
to the product.
Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.
| Product / review | International / project route | Chinese reference | Clarify before quotation |
|---|---|---|---|
| Identity & chemistry | Approved product and project specification | GB/T 3620.1-2016View PDF ↗ | Review the complete chemical limits and product requirements; nominal alloy names do not establish automatic interchangeability. |
| TB3 screw fracture investigation | TB3 screw fracture investigationPublisher reference ↗ | Compare the complete ordered Chinese requirements | Primary study of a specific screw failure; supports attention to process-induced defects, not a universal failure diagnosis. |
| Drawing-based blanks & parts | Approved drawing and controlled manufacturing plan | Agreed product / project specification | Define the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification. |
The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.
Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.
05 / Order coordination
Know the scope
before ordering.
Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

A quotation you can evaluate
Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.
- Identify whether inspection, samples and tooling are included.
- Confirm packaging, transport and delivery terms.
- Record items that still need technical confirmation.
Acceptance agreed before supply
Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.
Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.
Delivery with clear milestones
Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.
Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.
One contact when an issue arises
Contact TiHubs with the order reference, affected items and supporting photos or inspection records.
We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.
Material records
Grade, standard, test results and heat or batch identity matched to the supplied items.
Inspection records
Dimensional and testing records for the agreed scope, including critical drawing requirements.
Dispatch records
Item identification, packing list, protective packaging and required shipment documents.
06 / Questions before sourcing
Before you specify
TB3 Titanium Alloy.
A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.
A useful first enquiry
- Product and specificationProduct form, standard edition, dimensions and material condition.
- Order and deliveryQuantity, destination and any required delivery date.
- Acceptance requirementsDrawing revision, inspection, certificates and packaging.
Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.
What happens next: requirement review, technical clarification, then a supply proposal and quotation.
What is TB3 titanium mainly purchased for?
High-strength fastener manufacturing is the primary focus, especially wire and rod supporting an approved cold-heading and subsequent ageing route.
What is the nominal TB3 composition?
Ti-3.5Al-10Mo-8V-1Fe. Use the complete ordered chemistry standard for limits and residual elements.
Should heading wire arrive fully aged?
The correct starting state comes from the qualified process. A route designed around formable solution-condition stock should not receive a different condition without approval.
Can a TB2 or TC16 process be copied?
No. Similar applications do not establish identical chemistry, forming response or heat-treatment requirements.
Does tensile strength prove fastener quality?
No. Head integrity, threads, internal defects, dimensions and the specified finished-part tests also matter.
Are the shown fasteners stocked finished products?
The images illustrate potential supply forms. Blank or finished-part capability, drawing requirements and release scope must be confirmed for the enquiry.
What should be specified for wire surface quality?
Define permitted defects, finish, diameter variation and the inspection method in relation to the heading route.
Can TiHubs qualify a fastener for flight?
Material sourcing and coordination do not replace the responsible design and approval authority or the required aerospace qualification.
What belongs in a TB3 fastener-stock RFQ?
Include wire or rod size, quantity, starting condition, head geometry, thread route, final treatment, defect acceptance and finished-fastener test requirements.
07 / Your next step
Start with the
requirement you have.
Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.
- Requirement review
- Technical clarification
- Supply proposal and quotation
Combine materials and parts in one enquiry.
Send one list of TB3 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.
Share the service and acceptance priorities.
Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.
Baoji, China · info@tihubs.com
Start your TB3 Titanium Alloy enquiry
Send your material form, drawing or process conditions. We will help clarify the remaining requirements.
