A purchasing guide for in-tank immersion coils: survey the installation, define the duty and connect the replacement drawing to acceptance.

INSTALLATION FITCOOLING DUTY
Illustration of a titanium immersion cooling coil with four helical turns and two upright connections.
FitBody, risers and removal clearance
PerformanceProcess load and available coolant
AI illustration; not a production or inspection record.

Quick answer

A titanium cooling coil replacement needs both a verified installation drawing and a defined cooling duty. Record the coil body, tube dimensions, riser locations, connections, supports and removal path. Supply tank level, process fluid, required temperature change, ongoing heat load and coolant conditions. Matching the old outside dimensions or tube length alone does not prove equivalent cooling. Agree the material, fabrication, inspection and performance responsibilities before placing the order.

Decide whether you are replacing a coil or changing the duty

An immersion coil sits inside a tank while a separate heating or cooling fluid travels through its tube circuit. For a replacement purchase, the visible coil is only part of the requirement. The tank, liquid level, circulation, utility supply, connections and access determine whether the new item can be installed and perform its intended task. Start by identifying what has changed since the original coil was selected.

Separate an identical spare from a revised design

A spare against a controlled drawing is different from a redesigned coil intended to cool faster, fit a smaller opening or use a different coolant. State which task you need. If the original coil performed adequately, preserve the relevant drawing and operating baseline. If it did not, explain the problem with data where possible: slow cooling near the target temperature, excessive coolant pressure drop, fouling, leakage, interference or difficult cleaning. Copying a failed configuration without understanding the cause can reproduce the same problem.

Do not use the phrase “same as sample” to conceal unresolved requirements. A used sample may be distorted, repaired or covered with deposits. Its present dimensions may differ from the approved original, and its wall may no longer represent the supplied thickness. Separate original records from observations of the removed item. Identify which dimensions can be trusted and which need a reviewed replacement drawing.

Describe the complete service on both sides

Provide the tank fluid and the coolant separately. Include composition, concentration range, relevant contaminants, operating temperatures and cleaning exposure. Titanium is not a universal answer to every chemical environment, and a suitable tube body does not automatically qualify the fittings, supports or seals. The material selection should be confirmed for the actual service rather than inferred from the generic phrase “corrosion resistant.”

Clarify whether the coil provides cooling only or also operates in a heating mode. A water-cooling circuit and a steam-heating circuit have different operating considerations. Do not assume that an existing arrangement can change utility without review. If a single coil must serve more than one mode, identify each condition and assign the associated thermal, hydraulic and mechanical assessment to the responsible party.

TITAN’s immersion-coil literature describes several configurations and installation orientations, illustrating why a coil is a dimensioned equipment item rather than simply a length of tube. Those examples do not define TiHubs capacity or the correct design for your tank. The titanium coils product page introduces the supply form; this guide concentrates on the information needed to purchase an in-tank replacement with a clear acceptance boundary.

Measure the body, connections and removal path

Create a survey drawing with plan, elevation and the views needed to locate both connections. Distinguish overall coil width, depth and height from tube outside diameter, turn diameter and riser spacing. State whether a quoted coil diameter refers to the tube centerline or the outside envelope. For a helical coil, pitch and number of turns help describe the body, but neither replaces the overall dimensions that determine fit.

Check tolerances against the available opening

Suppose a hypothetical tank opening is 450 mm wide and the installation plan requires 15 mm clearance on each side. That leaves a maximum coil envelope of 420 mm. If the proposed coil is ordered as 420 mm with a tolerance of ±3 mm, its permitted maximum is 423 mm. With the assumed clearances, it would need 453 mm. The nominal dimensions appear to fit, but the tolerance combination does not.

This example is a clearance calculation, not a recommended installation margin. The actual allowance must account for the removal method, survey uncertainty, tank shape and obstructions. If the opening itself has a tolerance or deformation, use the relevant minimum available dimension. A coil that fits after being forced or bent is not necessarily an acceptable installation. Resolve the envelope before fabrication rather than treating field adjustment as an unpriced contingency.

Include the path into the tank

Record lids, beams, pipework, lifting access and any restriction above the opening. A coil can fit within the tank and still be impossible to insert through the available path. Show whether it will be lowered vertically, tilted or installed during another assembly stage. Identify the approved lifting and handling provisions without assuming the tube connections can carry the equipment weight. The plant and installer should confirm the handling plan.

Locate each riser and terminal connection in the same reference system. Include height above the tank rim, spacing, direction and any offset. Photograph the connections with labels that match the drawing. A mirrored arrangement may look similar in an isolated image yet place the inlet and outlet on opposite sides of the installed pipework. Mark the viewing direction and any orientation that must remain fixed.

Show support points, hangers and interfaces with the tank. Identify which supports are included in the supply and which remain on site. Clearance to agitators, racks, moving workpieces and drains may be more important than clearance to the wall alone. The agreed drawing should also preserve access needed for future cleaning and inspection. A successful replacement fits the operating and maintenance envelope, not merely the empty tank at the moment of installation.

Use one coordinate sheet for both connections

A practical survey can label the connections A and B and record each one from the same three reference planes. State which plane represents the tank rim, which represents the side wall and which fixes the longitudinal position. Record the connection axis direction in addition to its location. A height measured to the top of a threaded nipple is not the same as a height to a sealing face or tube centerline. Put the measurement endpoint on the sketch so fabrication and receiving inspection use the same interpretation.

If the existing pipework can move, identify its approved adjustment range separately from the coil tolerance. Do not add an assumed flexibility allowance to make an unresolved dimension appear acceptable. Record any permitted adjustment and who is responsible for making it. This keeps the replacement drawing useful even when the old coil is no longer available for comparison.

Clearance calculation comparing a 450 mm tank opening with nominal and maximum coil envelopes.
Industrial buying guide / 02Check the maximum coil, not just its nominal width

Hypothetical opening: 450 mm minus two assumed 15 mm clearances leaves 420 mm. A 420 ±3 mm coil can require 453 mm including those clearances.

Define the heat to remove and the conditions available

A cooling requirement needs more than a target temperature. State the quantity of process liquid, its thermal properties where known, initial temperature, final temperature and allowed cooling time. Describe any continuous or changing heat input from the process. Include tank and immersed-equipment effects where they are part of the design calculation. The supplier should know whether the task is initial cooldown, maintaining a steady temperature or both.

An average load is a starting point, not a coil rating

Consider a hypothetical batch containing 1,000 kg of water-like liquid. Assume a constant specific heat of 4.18 kJ/(kg·K), cooling from 40°C to 25°C in one hour, and ignore the tank, heat gains and every other load. The energy removal is 1,000 × 4.18 × 15 = 62,700 kJ. Dividing by 3,600 seconds gives an average duty of approximately 17.4 kW. The assumptions are intentionally simplified and do not describe a real process guarantee.

If the same hypothetical process also adds a constant 8 kW throughout that hour, the corresponding average removal requirement becomes about 25.4 kW before other effects are considered. This does not mean that any coil labelled 25.4 kW will meet the cooldown time. Heat-transfer capability changes with the temperature difference between the bath and coolant, and the final part of the cooling period may be the controlling condition.

Specify the coolant at the coil, not only at the chiller

Provide coolant type and concentration, supply temperature range, available flow, return conditions and allowable pressure drop at the coil connections. A chiller nameplate capacity does not establish the conditions delivered after distribution piping, valves and other users. If flow or supply temperature varies, describe the range rather than quoting only the best observed condition. Identify whether the utility can maintain the assumed conditions throughout the required operating cycle.

Tank-side circulation also matters. Record agitation, recirculation, likely stagnant regions and the minimum operating liquid level. A coil partly above the liquid cannot be credited as though its entire tube surface were immersed under the same conditions. Deposits can also alter the effective heat-transfer behaviour. Spirax Sarco’s heat-transfer discussion explains the dependence of overall performance on fluid and circulation conditions; its steam-heating examples should not be copied as universal coefficients for a titanium cooling application.

Request the basis of any proposed thermal rating. It should identify the operating conditions, area definition, assumptions and responsibilities for performance verification. If the supplier offers fabrication only to an approved drawing, make that boundary explicit and retain thermal design responsibility elsewhere. If performance is included in the scope, agree the conditions under which it will be demonstrated before comparing the quoted capacity with another offer.

Cooling energy and average-duty calculation for a hypothetical water-like batch.
Industrial buying guide / 03An average duty is only the starting point

Hypothetical 1,000 kg batch with assumed specific heat 4.18 kJ/(kg·K), cooled by 15 K in one hour: about 17.4 kW average, before other loads.

Keep tube dimensions, immersed area and flow path connected

Tube length is useful, but it does not by itself define the coil’s active area or hydraulic behaviour. State tube outside diameter, wall requirement, material specification, construction and any restrictions on joints. Distinguish total developed tube length from the portion immersed during operation. Risers, external connections and other nonimmersed sections should not silently be counted as equivalent active tank-side area.

Calculate the area on a declared basis

For a hypothetical round tube of 25 mm outside diameter with 20 m of immersed length, the outside lateral area is π × 0.025 × 20, approximately 1.571 m². If only 19 m is immersed at the minimum operating level, the corresponding area is about 1.492 m². These calculations exclude tube ends and use ideal geometry. They do not establish a heat-transfer coefficient, allowable pressure or cooling capacity.

The distinction is useful when two offers quote the same total length but include different riser lengths or layouts. Ask for the active-area calculation and the liquid level to which it applies. A larger overall coil can contain less effective immersed surface than expected if substantial length lies outside the bath. Conversely, a compact arrangement may provide more surface while changing circulation and cleaning access. Evaluate the complete installation rather than rewarding area alone.

Do not change the flow circuit unnoticed

A single continuous circuit and several parallel branches can have different flow distribution and pressure-loss behaviour even when their total tube length is similar. Identify the proposed flow path and any manifolds. Ask the designer to confirm how the available coolant flow is distributed and how the arrangement affects the thermal duty. A change made to simplify fabrication may alter the operating basis if it is not reviewed.

Wall thickness affects the internal passage as well as the material requirement. The buyer should retain the approved wall basis and end dimensions instead of accepting an alternate tube solely because its outside diameter matches. If the original equipment used a specific tube specification or inspection package, carry that requirement into the coil enquiry and clarify which checks occur before and after forming. A straight-tube certificate does not prove the geometry or integrity of the finished coil.

The titanium tube wall-thickness guide helps distinguish nominal and minimum-wall requirements. For the replacement coil, connect those requirements to the actual bent and joined component. Record bend geometry, permitted ovality or other drawing requirements where applicable, and identify how the finished condition will be accepted. The purpose is to preserve a consistent design basis through procurement, forming, inspection and installation.

Comparison of active tube length and calculated outside area for 20 metre and 19 metre immersed lengths.
Industrial buying guide / 04Count the length that is immersed

Ideal outside lateral area for 25 mm tube: 20 m gives about 1.571 m²; 19 m gives about 1.492 m². Neither value establishes cooling capacity.

Define what must be proved before dispatch

The purchase order should identify the supplied assembly and its acceptance evidence. Include the approved drawing revision, material requirements, joints, terminal preparation, support details and inspection scope. Where the project invokes a design code or fabrication specification, state the applicable edition and responsibilities. Do not infer compliance from a generic product photograph or from another manufacturer’s published test pressure.

Inspect the installation interfaces directly

Ask for actual results for the dimensions that govern fit: maximum body envelope, riser coordinates, terminal orientation and support locations. Identify the measurement references and whether dimensions apply in the free state or under a defined support condition. If the assembly is flexible, an unrecorded fixture can change what is measured. A dimension report should describe the approved condition rather than merely state that the coil matches the drawing.

Where joints are present, agree the required fabrication procedures, personnel qualifications and examinations under the applicable project scope. Specify any restrictions on joint location, especially where access will be lost after installation. Material traceability should remain connected to the assembly and its constituent tube or fittings as required. If a marking method is unsuitable for a wetted surface, agree an alternative identification method without losing the document link.

Separate leak testing from performance acceptance

A leak or pressure test addresses the boundary under its stated conditions; it does not demonstrate cooling capacity. Define the required test medium, pressure, duration, temperature, acceptance criterion and reporting basis through the responsible engineering process. The supplier’s standard test may be acceptable, may need modification or may not address the project requirement. Resolve that before manufacture rather than adopting a convenient number from an unrelated catalogue.

Cleaning, drying and preservation belong in the release scope. State what residues are unacceptable and how open connections will be protected. If the process has specific cleanliness requirements, define them rather than requesting an undefined “clean coil.” Agree packaging that supports the assembly and protects risers, bends and connection surfaces during transport. A coil that passed inspection before dispatch can still become unsuitable if the packaging allows it to distort or rub against hard supports.

Review deviations before shipment. A changed riser length, substituted fitting or relocated support can affect installation even if the thermal surface remains unchanged. Keep the supplier’s proposal, the technical approval and the revised drawing together. A clear release pack should allow the receiving team to identify the item, check the critical interfaces and see which tests were completed without reconstructing decisions from scattered emails.

Make the quotation and site check use the same assumptions

Organize the enquiry around three connected items: the installation drawing, the operating duty and the delivery evidence. Send the existing records and identify what needs review. State whether you require an identical spare, fabrication to an approved design or a proposed replacement with a defined performance scope. This prevents suppliers from pricing different responsibilities under the same product description.

Compare the full delivery scope

Separate coil body, connections, supports, inspection, cleaning, packaging and documents in the comparison. Ask whether the quoted lead time includes drawing approval and material procurement. If a shutdown date is fixed, identify the required delivery and review milestones without treating a tentative manufacturing estimate as a confirmed installation plan. Alternatives should show their dimensional and operating consequences alongside any price or timing benefit.

Agree the site acceptance conditions before the coil arrives. Mechanical fit can be checked against the installation drawing. Operating performance requires the agreed fluid quantity, temperatures, circulation and utility conditions, together with suitable measurement points. If those conditions are not available during commissioning, record the difference rather than declaring the coil satisfactory or defective from an incomparable trial.

Preserve a baseline after installation: approved drawing, identification, utility flow and temperatures, bath response, operating level and relevant observations. This information makes the next replacement easier and helps distinguish deterioration from a changed process. If performance falls later, examine operating and fouling conditions as well as the coil itself before assuming that the original design must be enlarged.

Use the enquiry tool below to submit the tank sketch, coil drawing and duty. TiHubs can review the proposed titanium coil supply and the information needed for quotation. Availability, fabrication capability, delivery, design responsibility and performance acceptance must be agreed for the actual order. The examples in this guide are procurement illustrations and do not authorize a pressure design, chemical service or installation method.

Track each unresolved condition separately

If available coolant flow is unknown, do not replace it with a nominal pump value without verification. If bath composition is missing, do not rely only on the general process name. Assign an owner and a resolution date to each input that affects the offer. A supplier can prepare a preliminary proposal with identified assumptions, but those assumptions must be reviewed before fabrication or performance is approved. This prevents a commercial estimate from accidentally becoming the technical basis for the replacement.

Prepare a trial record that supports a decision

A hypothetical example shows why measurement points must be defined. Suppose acceptance requires cooling from 40°C to 25°C in sixty minutes under agreed circulation conditions. At the end, a sensor near the coil reads 25°C while another farther away reads 29°C. Choosing the more favourable reading is insufficient. Check whether the locations and circulation match the approved method and whether the requirement concerns a representative bath temperature or limits at specified locations. These values illustrate an interpretation problem, not a universal acceptance criterion.

The record should also show coolant inlet temperature and flow during the trial. If the supply became warmer or the flow decreased, document that deviation because it may explain part of the result. If conditions match the agreement, review the design and its execution. Keeping observations, deviations and interpretation separate supports a defensible technical decision and avoids arguing about a final number without knowing how it was obtained.

Build a titanium cooling coil replacement enquiry

Connect the tank envelope and connection coordinates with the required thermal duty. Identify which drawing is approved, which dimensions are field measurements and which assumptions the supplier must review before quotation.

Information to include

  • Tank opening, operating level, coil envelope and removal path.
  • Tube dimensions, active length, riser coordinates and connections.
  • Process fluid, batch quantity, temperatures, cooling time and heat inputs.
  • Coolant composition, temperatures, flow and available pressure drop.
  • Supports, inspection, test basis, cleaning, quantity and delivery date.

Build your RFQ checklist

Choose the product and add the information you have. Copy the resulting brief or send your requirements to TiHubs. Submitting an enquiry does not place an order.

TiHubs — EN — Titanium Cooling Coil Replacement: Tank Dimensions and RFQ Guide

Add your details, then copy the checklist or send your requirements to TiHubs.

We use these details to respond to your enquiry. Privacy Policy.

Questions buyers ask

Can I copy the old coil’s dimensions and expect the same cooling?

Only if the relevant design and operating conditions remain equivalent and the replacement is accepted against the approved scope. Tube dimensions, active immersion, circuit arrangement, circulation and utility conditions all matter. If the original performance was inadequate, investigate the cause before copying the geometry.

Is total tube length the same as active cooling length?

No. Risers and external sections may not be immersed in the process liquid. State the active length and area at the relevant operating level. The ideal lateral-area calculation helps compare geometry, but area alone does not establish heat-transfer performance.

Does the coil need to fit through the tank opening?

The complete installation path must be reviewed. A coil may fit inside the tank but not pass through the opening or available overhead space. Include orientation, supports, obstructions and the approved handling method. Do not assume that field bending is an acceptable way to correct a dimensional mismatch.

Can a pressure test prove the cooling capacity?

No. A pressure or leak test and a thermal performance check answer different questions. Define the required conditions and acceptance for each. A sound pressure boundary can still provide insufficient cooling if the thermal design or operating conditions do not meet the duty.

What coolant information should I provide?

Give composition, supply temperature range, available flow, return conditions and allowable pressure drop at the coil connections. Include variation during the operating cycle. A chiller nameplate or nominal pump flow alone does not establish the conditions available at the installed coil.

Can TiHubs quote from a photograph?

A photograph can start the discussion, but a dependable replacement quotation needs dimensions, material and operating requirements. Label unknown information and provide a survey or drawing where possible. The proposed supply scope and any design responsibility should be agreed before manufacture.

Keep the purchase requirements connected.

  1. Separate identical replacement from a change in cooling duty.
  2. Check the maximum coil envelope against minimum installation clearance.
  3. Define process load and coolant conditions at the actual connections.
  4. Distinguish total tube length from immersed active area.
  5. Agree mechanical, pressure-boundary and performance acceptance separately.

Sources and data scope

References reviewed November 14, 2026. Public source summaries support the discussion; the controlled specification, agreed edition and approved project requirements govern acceptance.

  1. TITAN Metal Fabricators — Immersion coils — Examples of coil configurations and mounting scope; not TiHubs product specifications.
  2. TITAN — Immersion coils quick reference guide — Illustrates dimensional and enquiry inputs. Historical catalogue values do not establish project acceptance.
  3. Spirax Sarco — Heating with coils and jackets — Heat-transfer context; steam-heating coefficients must not be transferred directly to the cooling duty.
  4. Delta Hydronics — Immersion coil specification sheet — Example of separate body, riser, surface-area and flow information for a commercial coil.