
Titanium thermowells.
Mark the process sealing plane and the temperature instrument connection separately. Send the sensor drawing, nozzle detail and service data so the responsible engineer can review the actual installation.
Select the supply configuration
Use the drawing and the assembly configuration to identify the item to quote.
Flanged thermowell
For the quotation, identify flange drawing, wetted face, sensor entry.
- Flange drawing
- wetted face
- sensor entry
Dimensions and acceptance
Quote a titanium thermowell from the process interface to the sensor connection. Compare wetted and flange materials, bore, insertion length, attachment and the scope of engineering verification.
| Order item | Include in your enquiry | Why it matters |
|---|---|---|
| WIKA TW10 drawing symbols | U insertion, H connection length, B bore diameter | Q root diameter and V tip diameter are separate dimensions in the selected drawing |
| Selected TW10 catalogue bore examples | 6.2, 6.6 and 7.0 mm | Examples from a product family, subject to model and instrument selection |
| Historical SI450F material example | Titanium Grade 2 wetted option, nonwetted 316L flange described | Confirm the material at the seal face and the removable cover-flange detail for that option |
| Illustrative nozzle projection | U 180 mm from a defined sealing plane, inner wall 55 mm from the same plane | Ideal tip projection 125 mm beyond the wall on the same axis. This is geometry only. |
| Illustrative sensor check | Bore 6.6 mm, sensor OD 6.0 mm, both nominal | 0.6 mm nominal diametral difference, subject to actual tolerances and instrument requirements |
| ASME PTC 19.3 TW | Defined scope for thermowells machined from bar stock | A weld along the shank or at the tip falls outside the cited standard’s stated scope |
Your starting specification.
Mark the process sealing plane and the temperature instrument connection separately. Send the sensor drawing, nozzle detail and service data so the responsible engineer can review the actual installation.
The table identifies the basis for the quotation. Confirm material, dimensions, inspection and delivery for the selected part before ordering.
Material and delivery condition
Identify the material on the approved drawing and confirm its product form and condition with the quotation.
Chinese designations and international names are reference routes, not automatic substitutes. Grade, product specification, condition and acceptance requirements must be agreed together.
Open grade cross reference ↗Purchasing situations
A first assembly, a replacement and a repeat order need different evidence.
Flanged thermowell
For the quotation, identify flange drawing, wetted face, sensor entry. For related supply options, see the parent product guide.
Threaded process connection
For the quotation, identify process thread, sealing method, installed projection.
Wetted-material assembly
For the quotation, identify stem material, seal face, external flange material.
Engineering and purchasing guide
Mark the process sealing plane and the temperature instrument connection separately. Send the sensor drawing, nozzle detail and service data so the responsible engineer can review the actual installation.

Name the two connections. Instrument entry, Process sealing plane.
Order geometry schematic; not a dimensional drawing.Identify the process boundary and the wetted metals
Start a thermowell enquiry with a section through the installed assembly. A thermowell separates the temperature sensor from the process through a closed metal end and surrounding wall. The assembly has a process connection and an instrument connection. They perform different jobs and can use different threads or entirely different types of attachment. Label the process side, the accessible instrument side and the sealing plane. If the buyer supplies a photograph of an existing installation, identify where the vessel or pipe wall lies behind the nozzle. A photograph of the connection above insulation can leave most of the immersed geometry invisible.
Mark the wetted perimeter on the section. It may extend along the stem, across a flange facing or onto a specified cover or seal detail. Identify the metals touching the process and give separate material requirements for the exterior flange, fasteners and instrument adapter. A supplier can accurately describe a titanium wetted assembly while using another metal outside the wetted boundary. In other installations the design may require a full titanium flange. Describe which construction the owner permits. Material certification must identify the component to which it applies. A certificate for the starting bar does not identify a separate flange or its contact face.
WIKA’s archived SI450F sheet gives a published example of this distinction. It lists an option for titanium Grade 2 wetted material, describes a nonwetted 316L flange and notes a removable cover-flange detail for the titanium option. Read that historical example as a construction illustration. It does not establish current availability or a pressure rating for a new titanium assembly. The TW10 family sheet separately identifies the dimensions used in a flanged thermowell drawing. The information from these two WIKA documents should stay attached to their respective models. Combining the best-looking material and dimensional values from different drawings would create an item that neither sheet actually specifies.
For a replacement, ask whether the order covers only the well or also the sensor, extension, connection head and mounting hardware. A repair crew may colloquially request a temperature probe when the failed item is the insert, or request a thermowell when it intends to replace a complete assembly. Include the equipment tag and identify the parts that remain in service. If the sensor will be reused, obtain its model and drawing. If the process nozzle will be retained, obtain its mating detail. The supplier needs both ends of the assembly to quote a part that the owner’s instrument technician can actually install.
Draw the insertion, extension and sensor dimensions
Use a single axial drawing to separate the relevant lengths. In WIKA’s TW10 notation, U denotes insertion length and H denotes connection length. Its drawings also identify instrument connection N, bore diameter B, root diameter Q and tip diameter V. These letters are useful for reading that data sheet. Another drawing may use a different convention or reference plane. Show physical endpoints on the purchase drawing rather than asking the supplier to match a letter whose meaning has not been established. Record whether a raised sealing face, thread gauge plane or another surface is the origin of the dimension.
A geometrical example illustrates why insertion length and projection into the flowing passage can differ. Suppose the tip is 180 millimetres from a defined sealing plane and the inner process wall is 55 millimetres from the same plane along the same axis. The ideal tip projection past that wall is 125 millimetres. This example assumes the indicated surfaces and direction. It gives no design instruction about the required projection. For an angled connection or complex nozzle, provide the actual installation section. A drawing can then show which distance follows the stem and which refers to the pipe or vessel geometry. The engineer can review the immersed shape using the correct reference.
The sensor enters from the other end and has its own seating surface. It sees the internal bore depth, the instrument connection and the closed end of the well. Its effective insertion length cannot be determined from U alone. A threaded head, adapter or spring-loaded insert can change the reference used to establish the final sensor position. Request the manufacturer’s dimensions for the instrument to be paired. Keep the bore bottom and the outside tip as separate features. Treating them as the same point would neglect the closed tip material. A sensor that threads into the top correctly can still sit at an unintended position inside the bore.
Use diameter examples to check the conversation without declaring a universal sensor fit. The TW10 sheet lists, among other nominal bores, 6.2, 6.6 and 7.0 millimetres. Pairing a nominal 6.6 millimetre bore with an assumed nominal 6.0 millimetre sensor yields a nominal diametral difference of 0.6 millimetre. Real clearance requires actual tolerances, straightness over useful length and the manufacturer’s intended installation. This arithmetic neither selects an instrument nor predicts its response time. Where the instrument must be removable, show the clear space required outside the well to extract its length. A sensor can fit inside the bore and still be impossible to withdraw past an obstruction above the connection head.
For a second dimensional review, imagine the actual sensor outside limits are 5.97 to 6.02 mm and the bore limits are 6.55 to 6.65 mm. The smallest diameter difference in those hypothetical limits is 6.55 minus 6.02, or 0.53 mm. The largest is 6.65 minus 5.97, or 0.68 mm. Record the results as differences on diameter. Dividing them by two describes one-sided spacing only in ideal concentric sections. The example illustrates why subtracting the two nominal dimensions and reporting a single figure can hide the narrowest case. It does not establish the required fit, centring, response time or operating capability of a real instrument. Consult the instrument drawing and the approved well construction for those decisions.
A useful tender attachment shows the complete removal envelope outside the process. Mark the point from which an insert clears its thread or retainer and the free distance to the first fixed obstruction. Add space for any instrument head that must move with the sensor. This lets the plant technician identify a maintenance conflict on the drawing before a technically compatible sensor and well are purchased.
Compare mountings and the shank construction
Describe the process mounting independently from the instrument attachment. A flanged process connection requires the mating standard, nominal size, selected class or designation, facing and orientation where relevant. A threaded connection needs the thread family, nominal size, sealing arrangement and installation reference. A welded connection requires the approved attachment drawing, parent material and the defined responsibility for installation work. A half-inch instrument thread at the top cannot identify a process flange at the bottom. Put these features in separate fields on both the request and the supplier’s acknowledgement to prevent a correct instrument connection being offered on an incompatible process connection.
Distinguish a bar-stock thermowell from a fabricated protection tube. The outside of the two may look similar in a photograph. The former can be machined with a blind bore, while a fabricated construction may involve different starting material and joints. The exact manufacturing route matters to which technical verification can apply. ASME describes PTC 19.3 TW as applying to defined thermowells machined from bar stock and includes certain flange or attachment constructions. Its stated scope excludes thermowells with specified fabrication welds along the shank or at the tip. A generic note saying calculated to ASME requires confirmation that the particular construction falls within the relevant scope.
Compare stem form on the drawing. Straight, tapered and stepped forms can differ in their external profile, root dimensions, tip geometry and relationship to the mounting. WIKA illustrates these form families. A designer may select a form for reasons involving geometry, process behaviour and sensor response. Matching only the outside tip diameter or the nominal process connection leaves the rest of the construction open. Show the full profile, the relevant transitions and the dimensions controlled by the purchase order. If a bidder proposes a different form to simplify machining, require a marked drawing and review by the party responsible for the installation.
Define the weld boundary without assuming that all welds have the same status. A flange attachment permitted for a particular bar-stock design differs from a weld that closes a fabricated tip. Identify where joints occur, the materials joined, the required records and who is qualified to accept them. The owner may require separate documentation for a fabrication shop weld and a field attachment. State whether a loose flange, a finished welded unit or a complete tested assembly is being quoted. These options can look nearly identical in a purchasing photograph while leaving very different work and engineering responsibility with the buyer.
Prepare the operating cases for engineering review
Collect the process conditions as operating cases. Include the medium and composition relevant to materials, pressure, temperature, flow information, pipe or vessel geometry and nozzle detail. Identify normal operation, credible operating extremes and any startup or cleaning conditions the responsible engineer asks to review. Keep values that occur together on the same line. Combining an isolated maximum temperature and an unrelated maximum flow without identifying their relationship can obscure the actual cases. Conversely, listing only the normal case may hide the condition that controls engineering review. Ask the owner to identify which cases and units are to be used in its approved design assessment.
Record how flow is specified. A volumetric rate for a pipe and a local velocity past an immersed stem are different inputs. A value given at reference conditions can differ from the volume flowing at process conditions. Supply the pipe inside geometry, process state and basis of the data so a qualified engineer can determine the applicable quantities. Where fluid properties vary with conditions, identify the source and the case to which they belong. Avoid filling a blank field with a convenient value copied from a different line. An honest unknown alerts the engineer to a missing input while there is still time to resolve it.
A mechanical review can consider effects associated with flow excitation, configuration and loading within the scope of the selected method. The buyer should receive a statement identifying the drawing, material, support condition, process cases and applicable edition behind the calculation. An existing report for another insertion or flange arrangement may be useful historical context but should not silently be carried over to a changed installation. If the proposed geometry falls outside the scope of the chosen standard, ask the responsible engineering authority to define the appropriate basis. A purchased flange designation or a Grade 2 certificate alone does not establish allowable operating conditions for the completed thermowell.
Keep material selection tied to the actual environment. Commercially pure titanium can be attractive in selected chemical services, yet the material name alone cannot establish suitability for every composition, temperature or cleaning fluid. Identify changes between operating and cleaning conditions, the materials of adjacent parts and the faces that can come into contact with the process. If the buyer has documented service history for the same construction, make the reference and its limits visible. If it is changing fluid, nozzle, flow or metal, highlight the changes. A purchasing request should give the materials specialist enough information to approve the selection without inventing a service envelope from generic merchandise descriptions.
Separate physical fit, verification and response
Arrange verification into separate questions. Does the part fit the process connection and accept the intended sensor? Does the construction meet the specified material and fabrication requirements? Has the mechanical service assessment been made for the installed arrangement? Does the temperature measurement system respond adequately for the process objective? Each question has a different type of evidence. A dimensional report can address relevant geometries. A material certificate can address a designated piece of metal. A calculation can address cases inside its defined scope. A thermal response requirement concerns the instrument and installation as a system. Making these boundaries explicit improves both tender comparison and commissioning records.
For the sensor fit, check the bore size and effective depth from the actual instrument seating point. Give the tip shape and any manufacturer-specific seating or retention requirement. Include any removable extension or adapter in the configuration being checked. When two similar sensor models differ in sheath length, the one that threads into the head may still be the wrong version for the well. Ask the instrument supplier to confirm the model and reference length. If a dummy gauge is used for shop acceptance, describe what feature the gauge verifies. A gauge passing through the bore cannot on its own verify thermal response or service suitability.
A thermowell can be supplied with a component inspection, fabrication records, tests or a calculation in various combinations. Ask explicitly what is included in the quoted price. If a pressure or leak test is required, the responsible parties should specify the method, boundary, medium, acceptance and record for the actual construction. A flange data sheet and a dimensional inspection cannot substitute for an agreed test record. A completed test likewise does not establish every aspect of dynamic service. Connect the result to the individual unit or defined lot and identify any accessories or closures used during the test. This allows the customer to judge exactly what the report represents.
For temperature response, identify what the process owner is trying to observe and under what conditions. A slow-changing storage vessel and a transient measurement can have different priorities. Sensor construction, its position within the well, contact condition, the stem and the surrounding process all influence the installed measurement. The nominal diametral difference in the worked example provides only geometry. If a response time is contractually important, define the test configuration and the measured criterion with the instrument specialist. An unqualified number from a different sensor, fluid or installation can create a false acceptance target and a dispute that no dimensional report can settle.
Quote, inspect and replace a traceable assembly
Create a purchase schedule with one row for each equipment tag and a field for each independent interface. Include the process connection, instrument connection, insertion dimension and reference plane, bore and depth, material of each wetted part, external flange and required documentation. Identify the quantity and whether the sensor itself is included. Where several tags use the same flange and different insertion lengths, keep them on separate rows. A storekeeper checking only flange size can otherwise issue a spare that bolts on correctly but puts the sensor in the wrong position. Tag identification should survive transport and remain linked to the inspection records.
On receipt, inspect protection of the connection faces, instrument opening and stem. Check material and inspection records against the ordered tag. Verify the approved drawing revision and the meaning of the insertion and bore dimensions before comparing readings. Confirm any included adapter or removable flange has remained with its intended assembly. If a verification document refers to a different drawing revision, ask what changed before accepting it for the item received. A change to an external marking location may have little effect on engineering review, while a change to support or insertion can be significant. The design authority should decide which evidence remains transferable.
A replacement enquiry often begins after an instrument fault. Separate the symptom from the identified component. A slow reading could involve the sensor, its seating condition, the process or the thermowell installation. A mismatched connection could be at the instrument end while the process boundary remains suitable. Have the owner identify the item to replace and document the existing installation before ordering. If dimensions must be obtained from a removed part, distinguish measured features from assumptions about the original design. Retain the equipment tag and historical process information when requesting a replacement. Reproducing the metal shape alone cannot confirm that a changed process case is still suitable.
For an effective quotation, send the assembly drawing, nozzle section, instrument data and approved process cases together. Identify any missing case or material decision and ask which parts of the price depend on it. One bidder may price a finished drawing-based component while another includes engineering, documentation and a matched instrument. Compare costs using the end condition actually needed for installation. Record the signed drawing and documents alongside the final order so that the next replacement can be reviewed in context. This provides a practical buying route for titanium thermowells without converting a catalogue part description into an unsupported design approval.
A final check is to hand the purchase schedule to an instrument technician who has not seen the tender. Ask the technician to identify the sealing face, sensor seating point, required extraction space and equipment tag directly from the documents. If one location can be interpreted in two ways, annotate the drawing before fabrication. Ask the process reviewer to identify the operating case and calculation revision that apply to the same tag. The two checks address different disciplines and cost little compared with remaking a pressure-boundary component after delivery. Where the supplier is delivering only bare metal to an approved drawing, retain the engineering review with the organisation that owns it.
Inspection points
Agree the acceptance evidence before the first part is released.
Traceable from heat to shipment.
Q root diameter and V tip diameter are separate dimensions in the selected drawing
U insertion, H connection length, B bore diameterExamples from a product family, subject to model and instrument selection
6.2, 6.6 and 7.0 mmConfirm the material at the seal face and the removable cover-flange detail for that option
Titanium Grade 2 wetted option, nonwetted 316L flange describedIdeal tip projection 125 mm beyond the wall on the same axis. This is geometry only.
U 180 mm from a defined sealing plane, inner wall 55 mm from the same plane0.6 mm nominal diametral difference, subject to actual tolerances and instrument requirements
Bore 6.6 mm, sensor OD 6.0 mm, both nominalA weld along the shank or at the tip falls outside the cited standard’s stated scope
Defined scope for thermowells machined from bar stockSource documents
Check the applicable series, revision and scope against the purchase drawing.
Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.
Explore all downloads ↗Technical sources
- WIKA — TW10, data sheet TW 95.10 — Product drawing, dimension symbols, named bore examples and process versus thermometer connections.
- WIKA — archived SI450F, TW 90.80 — Historical reference for an exotic wetted-material construction and Grade 2 option. Confirm any current supply separately.
- ASME — PTC 19.3 TW — Publisher’s scope for bar-stock thermowells and stated exclusions for shank and tip construction.
Baoji.
One contact.
TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.
Clarify the requirement
Confirm grade, dimensions, state, quantity and the purpose of the stock.
Review the supply route
Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.
Agree the commercial scope
Confirm the quotation, lead time, acceptance requirements and delivery terms.
Coordinate inspection & delivery
Follow the agreed checks, marking, packing and shipment documentation.
Before you order
Quote a titanium thermowell from the process interface to the sensor connection. Compare wetted and flange materials, bore, insertion length, attachment and the scope of engineering verification.

TITANIUM THERMOWELLS · BAOJI SOURCING
Send your specification.
Mark the process sealing plane and the temperature instrument connection separately. Send the sensor drawing, nozzle detail and service data so the responsible engineer can review the actual installation.
