Machined titanium circular, rectangular and rotary sputtering target materials

Titanium
targets

Titanium sputtering targets for specification-led thin-film projects. Start with purity and impurity limits, then define the target geometry, equipment interface and acceptance evidence.

View specifications
20 years in titanium100+ Baoji factory connections
Purity basis. Equipment fit. Lot evidence.

Match the target to the coating system

Planar and rotary targets have different mounting and cooling interfaces. Use the equipment drawing and material requirement as the starting point.

Circular planar targets

Circular planar targets

Specify the target diameter and thickness with tolerances, edge profile and any mounting details. Identify the sputtering face and the required surface condition separately from the rear interface.

  • Diameter, thickness, flatness and finish
  • Edge details and mounting arrangement
  • Purity basis and impurity limits

Define your sputtering targets

Send the operating conditions and drawing requirements. Materials, feasibility, quantity, lead time and acceptance are confirmed through project review.

Order itemInclude in your enquiryWhy it matters
Process contextCoating application, equipment and approved drawingConnects the target to its use
Purity definitionRequired purity, calculation basis and excluded elementsPrevents ambiguous purity claims
Impurity limitsMetallic impurities plus O, N, H and C where requiredDefines the actual chemistry limits
Target geometryShape, dimensions, tolerances and mounting detailsControls equipment fit
Structure & finishAgreed grain / structure checks, flatness and surfaceSets material and face acceptance
Backing assemblyBacking material, bond method and cooling interfaceDefines the included assembly scope
Lot inspectionAnalysis methods, detection limits, sampling and reportsMakes evidence comparable
Project deliveryTrial / production quantities, packing and destinationSupports a defined quotation

Your starting specification.

Customer Feedback & RFQ Form (#6)

Include Target drawing, equipment interface, purity basis, impurity limits, backing / bonding requirements, quantity and acceptance records.

Dimensions, availability and acceptance criteria are confirmed in the quotation and order documents. Product photographs illustrate the supply format.

Specify the material route

High-purity titanium targets are purchased against a target-specific chemistry and equipment requirement. Industrial grade names do not establish a high-purity level.

These are procurement routes, not interchangeable material grades or confirmed stock offers. The required purity, geometry and manufacturing route are confirmed by project.

Applications, with conditions

The process, operating environment and required outcome help define the structure, materials and acceptance scope.

Semiconductor thin-film projects

A high-purity target enquiry should name the impurity limits and qualification requirements that matter to the process. A purity shorthand alone does not establish film performance or equipment approval.

What to sendApproved material specification, impurity limits, target drawing and qualification scope.

Industrial coating systems

For protective or functional coating applications, define target chemistry, geometry and the operating system interface. Confirm whether the requirement is a loose target or a complete bonded assembly.

What to sendCoating process, equipment model, target drawing and backing arrangement.

Development and replacement targets

Small-lot trials can establish fit and process compatibility before a production order. Preserve the acceptance baseline when changing geometry, material source or backing construction.

What to sendExisting part reference, trial quantity, inspection requirements and approval criteria.

Turn purity into a purchase specification

Material chemistry, target geometry and backing construction need separate requirements. Agree the evidence for each before ordering.

Target and backing plate illustration / assembly scope to confirm

Target face · thickness · mounting envelope · backing interface · agreed flatness

Order geometry schematic; not a dimensional product drawing.

Specify the chemistry basis

Write the minimum purity and its calculation basis, including whether gas-forming and interstitial elements are included. List critical impurities separately with the required analysis and reporting limits.

Define structure and surface acceptance

Where process qualification requires structure, grain-size or uniformity checks, state the method, sampling and limits. Agree face finish, flatness, edge condition and cleanliness on the drawing.

Review the complete interface

Confirm the backing material, bonding route, bond acceptance and cooling / mounting arrangement when included. A target blank and a bonded assembly are different deliverables.

Approve a traceable trial

For a new source or geometry, agree trial-lot records and customer qualification criteria before repeat production. Maintain the approved drawing revision and material-lot link.

Inspection, agreed upfront

Specify the tests and documents that your receiving inspection needs. Scope, sampling and acceptance levels belong in the order.

Dimensional inspection illustration / agreed scope and acceptance
Order documentationTiHubs

Traceable from heat to shipment.

Material identificationGrade + specification
Batch identificationHeat / lot reference
Inspection scopeAgreed tests & results
Shipment identificationMarks + packing list
Illustrative document checklist. Not a certificate or test report.
01Purity basis

Record the stated purity and how it is calculated.

Specification + analysis basis
02Impurity evidence

Report agreed elements, methods and detection limits.

Lot analysis + reporting limits
03Geometry & finish

Check dimensions, flatness, runout and surface criteria.

Drawing + inspection report
04Structure checks

Include grain or uniformity evidence where specified.

Method + sampling + limits
05Backing / bond

Verify the included backing and agreed bond acceptance.

Assembly drawing + records
06Clean delivery

Preserve the target face, cleanliness and lot identity.

Protected pack + release file

Titanium Sputtering Targets references

Target-specific technical files are confirmed with the project. Use the existing download centre for general titanium references; these do not replace a target chemistry, bonding or equipment specification.

Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.

Explore all downloads ↗

Baoji.
One contact.

TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.

20 yearsTitanium industry experience
100+Baoji factory connections
  1. Clarify the requirement

    Confirm grade, dimensions, state, quantity and the purpose of the stock.

  2. Review the supply route

    Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.

  3. Agree the commercial scope

    Confirm the quotation, lead time, acceptance requirements and delivery terms.

  4. Coordinate inspection & delivery

    Follow the agreed checks, marking, packing and shipment documentation.

Before you order

Answers to the details that make your titanium sputtering targets enquiry easier to review.

TITANIUM SPUTTERING TARGETS · BAOJI SOURCING

Send your specification.

Titanium sputtering targets for specification-led thin-film projects. Start with purity and impurity limits, then define the target geometry, equipment interface and acceptance evidence.

You do not need to finalize every detail before contacting us.

Start your RFQ

Required fields *

Customer Feedback & RFQ Form