Titanium tube bundle and horizontal shell-and-tube heat exchanger on a dark industrial surface

Titanium
heat exchangers

Titanium heat exchangers and replacement bundles for defined process duties. Bring both fluid sides, thermal requirements and mechanical interfaces into one project brief.

View specifications
20 years in titanium100+ Baoji factory connections
Two-sided duty. Wetted materials. Equipment acceptance.

Select the equipment scope

Start with the thermal duty and installation constraints. The selected structure, wetted materials and approval requirements are confirmed through project review.

Shell-and-tube exchangers

Shell-and-tube exchangers

Provide both fluid conditions, required duty, allowable pressure drop and the installation envelope. Identify which components require titanium and which have separate material requirements.

  • Both-side fluid and temperature data
  • Duty, flow rate and allowable pressure drop
  • Tube, tubesheet, shell and channel material callouts

Define your heat exchangers

Send the operating conditions and drawing requirements. Materials, feasibility, quantity, lead time and acceptance are confirmed through project review.

Order itemInclude in your enquiryWhy it matters
Thermal dutyRequired duty and inlet / outlet temperaturesDefines the heat-transfer objective
Both fluidsComposition, concentration, phases and flow ratesSupports thermal and material review
Pressure basisOperating / design pressure and temperature for each sideSeparates service from design requirements
Hydraulic limitsAllowable pressure drop and fouling assumptionsConstrains the selected arrangement
ConstructionType, area basis, envelope, nozzles and maintenance accessDefines fit and serviceability
Wetted materialsTubes / plates, tubesheets, joints, seals and other partsAvoids assuming every component is titanium
Code & approvalApplicable code, jurisdiction, certification and witnessesDefines the equipment acceptance route
Release scopeDrawings, test plan, documents, quantity and deliveryCoordinates project supply

Your starting specification.

Customer Feedback & RFQ Form (#6)

Include Both-side fluids, flow rates, inlet / outlet temperatures, duty, design pressure / temperature, allowable pressure drop, materials and equipment drawing.

Dimensions, availability and acceptance criteria are confirmed in the quotation and order documents. Product photographs illustrate the supply format.

Start with the grade

Explore a material guide, then tell us the exact designation required by your drawing or purchase specification.

Chinese designations and international names are reference routes, not automatic substitutes. Grade, product specification, condition and acceptance requirements must be agreed together.

Open grade cross reference ↗

Applications, with conditions

The process, operating environment and required outcome help define the structure, materials and acceptance scope.

Seawater cooling and desalination

Titanium heat-transfer surfaces can be considered for seawater duties, with material selection reviewed against temperature, chemistry, crevices and cleaning conditions. Define whether the order is a new exchanger or a replacement bundle for existing equipment.

What to sendSeawater conditions, other-side fluid, duty, flow and equipment interfaces.

Chemical process heating and cooling

Process chemistry can change during concentration, startup or cleaning. Include these conditions in the material review and identify allowable pressure drop, contamination restrictions and the required thermal performance basis.

What to sendFull fluid composition, concentration range, cleaning conditions and thermal datasheet.

Retrofits and maintenance bundles

Replacement projects must preserve the required mechanical interfaces while meeting the specified service and inspection requirements. Identify verified dimensions, undocumented changes and the planned shutdown window before manufacture.

What to sendExisting drawings, verified interfaces, failure history where available and required delivery window.

Agree the duty before the hardware

Thermal performance, mechanical design and material compatibility need one coordinated datasheet. The supplier scope and required approvals should be clear at quotation.

Tube-to-tubesheet fabrication illustration / joint and assembly requirements

TUBE SIDE · SHELL SIDE · NOZZLES · TUBESHEET · MAINTENANCE ENVELOPE

Order geometry schematic; not a dimensional product drawing.

Complete the process datasheet

Provide inlet and outlet targets, flow rates, phase changes, duty and pressure-drop limits for both sides. Agree the thermal design case and performance-verification basis, including the applicable fouling assumptions.

Review all wetted materials

Specify the titanium grade for each applicable component and the materials for gaskets, joints and other wetted parts. Material selection must account for the actual process and cleaning media, not just the word seawater or chemical.

Confirm fabrication and approval scope

Identify the required construction code, design review, welding qualifications, inspection hold points and certification route. ASME or other approval is project-specific and must be confirmed with the qualified manufacturing route.

Define separate acceptance checks

Agree dimensional inspection, joining records, required NDT and pressure / leak tests. Pressure testing establishes its specified acceptance scope; it does not by itself prove the required heat-transfer duty.

Inspection, agreed upfront

Specify the tests and documents that your receiving inspection needs. Scope, sampling and acceptance levels belong in the order.

Dimensional inspection illustration / agreed scope and acceptance
Order documentationTiHubs

Traceable from heat to shipment.

Material identificationGrade + specification
Batch identificationHeat / lot reference
Inspection scopeAgreed tests & results
Shipment identificationMarks + packing list
Illustrative document checklist. Not a certificate or test report.
01Material schedule

Link each wetted component to its approved material and records.

Component BOM + traceability
02Approved geometry

Check interfaces, nozzle orientation, envelope and maintenance access.

Approved drawings + dimensions
03Joining evidence

Define required procedures, qualifications and joint records.

Project code + fabrication scope
04Inspection & tightness

Agree NDT, pressure / leak test methods and acceptance.

Approved plan + witness points
05Thermal acceptance

State the performance basis and any required verification method.

Duty case + acceptance agreement
06Equipment release

Reconcile identification, documents, preservation and transport supports.

Equipment tag + release dossier

Titanium Heat Exchangers references

Reference documents for heat exchangers procurement. Confirm product scope, grade, delivery condition and the edition required by your order.

Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.

Explore all downloads ↗

Baoji.
One contact.

TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.

20 yearsTitanium industry experience
100+Baoji factory connections
  1. Clarify the requirement

    Confirm grade, dimensions, state, quantity and the purpose of the stock.

  2. Review the supply route

    Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.

  3. Agree the commercial scope

    Confirm the quotation, lead time, acceptance requirements and delivery terms.

  4. Coordinate inspection & delivery

    Follow the agreed checks, marking, packing and shipment documentation.

Before you order

Answers to the details that make your titanium heat exchangers enquiry easier to review.

TITANIUM HEAT EXCHANGERS · BAOJI SOURCING

Send your specification.

Titanium heat exchangers and replacement bundles for defined process duties. Bring both fluid sides, thermal requirements and mechanical interfaces into one project brief.

You do not need to finalize every detail before contacting us.

Start your RFQ

Required fields *

Customer Feedback & RFQ Form