Titanium stepped shaft forging, forged block and shaped preform on a dark surface

Titanium
forgings

Titanium forgings for drawing-based components and equipment parts. Align the blank shape, machining allowance, heat treatment and inspection plan before production.

View specifications
20 years in titanium100+ Baoji factory connections
Drawing review. Forging route. Inspection coordination.

Choose your forging route

The right blank starts with the finished component. Compare the shape, quantity and acceptance requirements before selecting a forging and finishing route.

Open-die forgings

Open-die forgings

Blocks and simple sections can provide a practical machining envelope for project quantities. Specify the finished-part outline and the required delivered blank; agree the stock left on each critical surface.

  • Blank envelope, finished drawing and quantity
  • Material condition and machining stock by surface
  • Required reference faces and inspection stage

Define your forgings

Send the dimensions you need. Feasibility, minimum order and lead time are confirmed against the grade, size, condition and quantity.

Order itemInclude in your enquiryWhy it matters
Material calloutGrade, product standard, edition and conditionDefines the acceptance basis
Blank geometryBlank drawing plus finished-part drawingSeparates supply size from final geometry
Machining stockAllowance on each face and critical featurePreserves the cleanup envelope
Forging routeRequired process or permitted alternativesAligns geometry and production planning
Heat treatmentRequired delivery state and evidenceLinks properties to the supplied condition
Test specimensLocation, direction and test-piece allowanceReserves representative test material
NDT & surfaceMethod, coverage, level and inspection stageMakes defect acceptance explicit
Quantity & deliveryPieces, identification, packing and destinationSupports release and handling

Your starting specification.

Customer Feedback & RFQ Form (#6)

Include grade, blank and finished drawings, quantity, machining allowance, heat treatment and ndt requirements.

Dimensions, availability and acceptance criteria are confirmed in the quotation and order documents. Product photographs illustrate the supply format.

Start with the grade

Explore a material guide, then tell us the exact designation required by your drawing or purchase specification.

Chinese designations and international names are reference routes, not automatic substitutes. Grade, product specification, condition and acceptance requirements must be agreed together.

Open grade cross reference ↗

Made for your next process

The intended component and operating environment help define the material, delivery condition and acceptance scope.

Pump and valve component blanks

Drawing-based bodies, shafts and other process-equipment parts need enough stock for the final flow passages, sealing faces and connections. Include service conditions with the engineering material callout and agree what machining is included in the delivered forging.

What to sendBlank and component drawings, critical sealing areas, service conditions and inspection specification.

Structural machining preforms

Where a customer drawing calls for a forging, the material route, heat treatment and test plan form part of the procurement requirement. Discuss test orientation and critical sections before selecting the blank shape. Supply to an aerospace or other qualified program requires its own approvals.

What to sendCustomer material specification, critical sections, test direction and approval requirements.

Custom equipment and project parts

Low-volume custom parts benefit from a clear division between forging, rough machining and final machining. Define the accepted blank envelope and who releases each stage, particularly when additional tests or witness points could affect the schedule.

What to sendQuantity, delivered machining stage, datum scheme, witness points and target delivery.

Plan the blank before the cut

Forging and machining should share one drawing-based plan: usable stock, material condition, test material and inspection access.

Forging route illustration / shape and subsequent machining scope

BLANK ENVELOPE · MACHINING STOCK · DATUMS · TEST MATERIAL

Order geometry schematic; not a dimensional product drawing.

Blank and final drawings

Identify the drawing revision and the delivered state. Agree allowances at bores, shoulders, faces and transitions rather than applying one generic allowance everywhere.

Heat-treatment sequence

State the required delivery condition and any approved sequence. Confirm when heat treatment, rough machining and acceptance tests occur; avoid assuming that every alloy follows the same cycle.

Test material and direction

Reserve test stock and identify specimen locations and orientation before cutting or machining removes it. Use the applicable specification to define lot and sampling requirements.

Inspection access

Agree the surface preparation and geometry needed for the chosen NDT method. Define acceptance levels and reporting at the stage where the inspection is performed.

Inspection, agreed upfront

Specify the tests and documents that your receiving inspection needs. Scope, sampling and acceptance levels belong in the order.

Ultrasonic inspection illustration / agreed scope and acceptance
Order documentationTiHubs

Traceable from heat to shipment.

Material identificationGrade + specification
Batch identificationHeat / lot reference
Inspection scopeAgreed tests & results
Shipment identificationMarks + packing list
Illustrative document checklist. Not a certificate or test report.
01Grade & traceability

Retain the original material callout and connect every forging to its heat and lot.

Specification + piece identity
02Blank dimensions

Inspect the delivered envelope, reference faces and stated allowance requirements.

Blank drawing + datums
03Heat-treatment state

Confirm the ordered condition and any required processing records.

Condition + agreed records
04Mechanical & structure tests

Specify test locations, direction and any required metallographic acceptance.

Sampling + orientation + limits
05Ultrasonic / surface inspection

Agree the method, coverage, surface preparation and acceptance level.

NDT procedure + stage
06Release & packaging

Complete the document package and protect inspection or locating surfaces.

Reports + marking + supports

Titanium Forgings references

Reference documents for forgings procurement. Confirm product scope, grade, delivery condition and the edition required by your order.

Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.

Explore all downloads ↗

Baoji.
One contact.

TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.

20 yearsTitanium industry experience
100+Baoji factory connections
  1. Clarify the requirement

    Confirm grade, dimensions, state, quantity and the purpose of the stock.

  2. Review the supply route

    Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.

  3. Agree the commercial scope

    Confirm the quotation, lead time, acceptance requirements and delivery terms.

  4. Coordinate inspection & delivery

    Follow the agreed checks, marking, packing and shipment documentation.

Before you order

Answers to the details that make your titanium forgings enquiry easier to review.

TITANIUM FORGINGS · BAOJI SOURCING

Send your specification.

Titanium forgings for drawing-based components and equipment parts. Align the blank shape, machining allowance, heat treatment and inspection plan before production.

You do not need to finalize every detail before contacting us.

Start your RFQ

Required fields *

Customer Feedback & RFQ Form