Precision titanium tubes with visible hollow ends stacked on a dark industrial surface

Titanium
tube

Titanium tube for heat-transfer equipment and fabricated systems. Start with outside diameter, wall thickness and manufacturing route, then agree the inspection and document package.

View specifications
20 years in titanium100+ Baoji factory connections
Tube route. Wall control. Inspection coordination.

Choose your tube route

Seamless, welded and heat-exchanger requirements are not interchangeable. State the product standard and service before choosing the supply route.

Seamless tube

Seamless tube

For a seamless-tube enquiry, provide OD, wall thickness and length with their tolerances. Identify whether wall acceptance is based on nominal or minimum wall and retain the specified material condition.

  • OD × wall × length and wall basis
  • Required grade, standard and manufacturing route
  • Straightness, end finish and inspection scope

Define your tube

Send the dimensions you need. Feasibility, minimum order and lead time are confirmed against the grade, size, condition and quantity.

Order itemInclude in your enquiryWhy it matters
Material & routeGrade, standard edition; seamless or weldedDefines the actual product requirement
DiameterOutside diameter and tolerance; ID if criticalControls fit and assembly
Wall thicknessNominal or minimum wall with tolerancesAvoids an ambiguous wall callout
Length & shapeLength, straightness and ovality limitsSupports handling and tube-sheet fit
Ends & surfacesEnd preparation, internal / external conditionSupports joining and cleanliness
InspectionNDT, leak test, sampling and acceptanceAligns checks with the product standard
DocumentationCertificates, heat / lot marks and releaseMakes the supplied lot traceable
DeliveryQuantity, packaging limits and destinationSupports bundle and shipment planning

Your starting specification.

Customer Feedback & RFQ Form (#6)

Include grade, od × wall × length, quantity, seamless / welded route, standard, service and inspection requirements.

Dimensions, availability and acceptance criteria are confirmed in the quotation and order documents. Product photographs illustrate the supply format.

Start with the grade

Explore a material guide, then tell us the exact designation required by your drawing or purchase specification.

Chinese designations and international names are reference routes, not automatic substitutes. Grade, product specification, condition and acceptance requirements must be agreed together.

Open grade cross reference ↗

Made for your next process

The intended component and operating environment help define the material, delivery condition and acceptance scope.

Condensers and heat exchangers

Tube orders for heat-transfer equipment need a clear product specification and tube-sheet interface. Include length, end condition, wall basis and cleanliness, plus any additional requirements of the equipment design. Operating conditions inform material selection but do not replace design review.

What to sendTubing standard, equipment duty, OD and wall, cut length and tube-end requirements.

Process and chemical systems

For fabricated systems, confirm whether the drawing calls for tube or pipe and retain the specified dimension basis. Share the medium, temperature, joining route and cleanliness requirements. Corrosion suitability must be assessed for the actual operating conditions.

What to sendPiping or equipment specification, service conditions, dimensions and joining details.

Precision tubular components

Tubular stock for sleeves, frames or other drawing-based parts needs controlled geometry and enough allowance for later work. Specify straightness, ovality, critical bore dimensions and any bend or machining requirement before choosing the incoming tube.

What to sendFinished drawing, critical ID / OD, allowances and downstream fabrication route.

From tube stock to assembly

Define incoming tube dimensions around the joining, bending, machining and inspection steps that follow.

Tube cutting and end preparation / length and edge control

OUTSIDE DIAMETER · WALL · LENGTH · STRAIGHTNESS

Order geometry schematic; not a dimensional product drawing.

OD, ID and wall

State which dimensions govern acceptance and whether wall thickness is nominal or minimum. If both OD and ID are critical, provide the drawing and tolerance scheme.

Straightness and bending

Include straightness, ovality and bend geometry when relevant. Agree the supplied condition and any trial before assuming a forming result.

Ends and cleanliness

Specify square cuts, burr removal or other end preparation. Identify internal cleanliness and end-cap requirements separately from external appearance.

Testing and release

Use the applicable product specification to define the required tests. Add project-specific methods, coverage, acceptance and documents expressly in the order.

Inspection, agreed upfront

Specify the tests and documents that your receiving inspection needs. Scope, sampling and acceptance levels belong in the order.

Dimensional inspection / agreed measurement and tolerance
Order documentationTiHubs

Traceable from heat to shipment.

Material identificationGrade + specification
Batch identificationHeat / lot reference
Inspection scopeAgreed tests & results
Shipment identificationMarks + packing list
Illustrative document checklist. Not a certificate or test report.
01Material & route

Verify grade, product specification, condition and seamless or welded route.

Callout + manufacturing route
02OD & wall

Inspect the agreed dimensional tolerances and wall-thickness basis.

Nominal or minimum wall
03Shape & ends

Confirm straightness, ovality, length and specified tube-end preparation.

Geometry + end condition
04NDT & leak tests

Agree the standard-required and additional tests, coverage and acceptance.

Method + acceptance + reports
05Surface & bore

Specify internal and external surface criteria and cleanliness requirements.

Bore + external condition
06Identity & protection

Link tubes or bundles to the heat / lot and protect the bore and ends.

Records + end caps + supports

Titanium Tube references

Reference documents for tube procurement. Confirm product scope, grade, delivery condition and the edition required by your order.

Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.

Explore all downloads ↗

Baoji.
One contact.

TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.

20 yearsTitanium industry experience
100+Baoji factory connections
  1. Clarify the requirement

    Confirm grade, dimensions, state, quantity and the purpose of the stock.

  2. Review the supply route

    Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.

  3. Agree the commercial scope

    Confirm the quotation, lead time, acceptance requirements and delivery terms.

  4. Coordinate inspection & delivery

    Follow the agreed checks, marking, packing and shipment documentation.

Before you order

Answers to the details that make a titanium tube enquiry easier to review.

TITANIUM TUBE · BAOJI SOURCING

Send your specification.

Titanium tube for heat-transfer equipment and fabricated systems. Start with outside diameter, wall thickness and manufacturing route, then agree the inspection and document package.

You do not need to finalize every detail before contacting us.

Start your RFQ

Required fields *

Customer Feedback & RFQ Form