TA23 / Ti70 titanium products on a dark metallic background

TA23 / Ti70 · Near-alpha titanium alloy

TA23 / Ti70. Plate for complex marine shapes.

Enquire about TA23 / Ti70 plate and forming blanks for acoustic covers, sonar fairings and complex marine shells, with thickness, contour and post-forming acceptance defined together.

Start with a specification, drawing or application. We’ll help identify the details still needed.

Material review. Supply coordination.
One contact in Baoji, China.

TA23 / Ti70Ti-2.5Al-2Zr-1Fe · nominal wt %
Near-alpha titanium alloyAcoustic covers & complex formed marine shells
One contact20 years of founder experience · 100+ Baoji factories

01 / Product forms

Find your TA23 product.

Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TA23 titanium plate — illustrative supply form
01 / 06

TA23 / Ti70

TA23 titanium plate

Plate feedstock for Ti70 marine shell and acoustic-cover projects under a defined material specification.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Thickness basis, width, length, flatness, rolling direction and usable edge margin.
Manufacturing review
Connect the starting thickness to the final shell and any forming or weld preparation losses.
Inspection priorities
Thickness variation, surface quality, specified directional properties and plate identity.
TA23 forming sheet — illustrative supply form
02 / 06

TA23 / Ti70

TA23 forming sheet

Sheet enquiries for thinner curved parts where the supplied condition must suit the planned forming route.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Nominal or minimum thickness, blank size, surface finish and orientation.
Manufacturing review
Provide curvature, local strain areas, forming sequence and the required final condition.
Inspection priorities
Representative forming behavior, local thinning and surface integrity after the agreed trial.
TA23 contour-cut blanks — illustrative supply form
03 / 06

TA23 / Ti70

TA23 contour-cut blanks

Flat blanks cut to a developed layout for complex curved-shell manufacture.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Contour file, trim allowance, orientation marks, quantity and edge tolerance.
Manufacturing review
Agree nesting, cut-edge preparation and identification before the blanks enter forming.
Inspection priorities
Contour dimensions, edge condition and linkage to the parent plate.
TA23 curved-blank enquiries — illustrative supply form
04 / 06

TA23 / Ti70

TA23 curved-blank enquiries

Drawing-based requests for an intermediate formed shape, subject to confirmed forming and inspection capability.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Surface model, datum scheme, trim line and minimum final wall.
Manufacturing review
State the supplied stage and the approved forming route, including any later welding or heat treatment.
Inspection priorities
Contour mapping, thickness survey and the ordered material tests at the specified stage.
TA23 shell-joint strips — illustrative supply form
05 / 06

TA23 / Ti70

TA23 shell-joint strips

Plate-derived strips and joint-development material for the shell fabricator’s approved design.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Width, length, thickness, rolling direction and edge preparation.
Manufacturing review
Define their structural role and joining sequence; do not treat matching chemistry as joint qualification.
Inspection priorities
Fit-up dimensions, surface cleanliness and traceable material for joint evaluation.
TA23 qualification coupons — illustrative supply form
06 / 06

TA23 / Ti70

TA23 qualification coupons

Representative plate for forming, weld, impact or acoustic-assembly development under a project test plan.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Production thickness and condition, specimen orientation and reserved test allowance.
Manufacturing review
Define the test purpose, fabrication history and responsible acceptance authority.
Inspection priorities
Keep heat, plate position and processing records with each specimen set.

Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.

Define the shape. Share the service.

These details help turn a material enquiry into a comparable quotation.

01 / Drawing review

Acoustic-cover plate selection

TA23 plate and sheet in the thickness and condition specified by the design. Agree thickness and surface controls for incoming plate, then apply the designer’s acoustic and structural verification to the completed assembly.

Discuss your drawing

02 / Drawing review

Complex curved-shell forming

Contour-cut blanks and production-intent forming sheet. Inspect a representative first article for contour, minimum wall and surface damage under the agreed forming plan.

Discuss your drawing

03 / Drawing review

Sonar-fairing material enquiries

Plate, developed blanks and trial material for the approved fairing design. Require traceable stock and the agreed post-fabrication tests; no sonar performance or service rating is implied by a material quotation.

Discuss your drawing

02 / Material identity

What is TA23 / Ti70 titanium?

TA23, commonly called Ti70, is a near-alpha titanium alloy associated with formed marine structures and acoustic-cover applications. This page centers on plate that must become a controlled curved shell: starting thickness, orientation, forming history, welded seams and the final inspection stage all matter. Acoustic performance belongs to the designed and tested assembly; it is not guaranteed by the alloy name or a raw-plate certificate.

Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.

Review itemOrder basisWhat to confirm
Final shell thicknessMinimum wall after formingMap critical regions and define how local thinning will be measured and reported.
Complex contourDrawing datums and inspection modelAgree surface-profile tolerance, trim allowance and the inspection stage after forming and joining.
Acoustic requirementComplete assembly verificationLet the approved design and test plan define performance; raw plate chemistry is not an acoustic guarantee.
Impact acceptanceMethod, orientation and conditionSpecify specimen basis, temperature and whether results apply before or after fabrication.
Process traceabilityPlate-to-panel material mapRetain heat, plate position, cut, forming, joining and specimen records throughout conversion.
Selected element · wt %Reference composition
Aluminium · Al2.5 nominal
Zirconium · Zr2 nominal
Iron · Fe1 nominal
Titanium · TiBalance

Nominal Ti70 composition, wt %, is shown for identification. Obtain the complete ordered TA23 chemistry and product requirements, including impurity and analysis limits, for acceptance.

TA23 and Ti70

Ti70 is the commonly used name associated with TA23. Record both on the enquiry, together with the exact product specification and condition.

TA23 and TA24 / Ti75

These are different alloy systems and purchasing routes. A common marine application does not make their chemistry, processing or acceptance interchangeable.

Acoustic material and acoustic assembly

Raw plate can be specified for an acoustic-cover design, but transmission performance depends on the complete geometry, thickness, joints and test conditions.

Incoming plate and formed shell

Forming and welding can change local thickness, shape and material condition. Define which properties and dimensions must be accepted after fabrication.

03 / Application priorities

TA23 in application.

Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.

Application review / 01

Acoustic-cover plate selection

Ti70 is associated with marine acoustic-cover applications. Material selection should start from the cover design and its verification plan, rather than assigning an acoustic transmission value to stock plate.

Products & manufacturing

TA23 plate and sheet in the thickness and condition specified by the design.

Service & design review

Identify shell geometry, interfaces and required assembly testing. Keep acoustic acceptance separate from ordinary material release.

Purchase & inspection priorities

Agree thickness and surface controls for incoming plate, then apply the designer’s acoustic and structural verification to the completed assembly.

Send your application details

Application review / 02

Complex curved-shell forming

A doubly curved part needs more than a flat-plate size on an order. Local strain and trimming can make the useful starting blank substantially different from the finished outline.

Products & manufacturing

Contour-cut blanks and production-intent forming sheet.

Service & design review

Provide the surface model, developed blank, trim margin, forming stages and areas where thinning is critical.

Purchase & inspection priorities

Inspect a representative first article for contour, minimum wall and surface damage under the agreed forming plan.

Send your application details

Application review / 03

Sonar-fairing material enquiries

For a sonar fairing, Ti70 stock is one element of an engineered shell. The supplier enquiry should define material and fabrication scope while leaving system performance to the qualified design and test process.

Products & manufacturing

Plate, developed blanks and trial material for the approved fairing design.

Service & design review

Specify the required material condition, shell thickness, joint locations and component-level inspection documents.

Purchase & inspection priorities

Require traceable stock and the agreed post-fabrication tests; no sonar performance or service rating is implied by a material quotation.

Send your application details

Application review / 04

Post-forming thickness control

The original plate thickness is not necessarily the minimum wall in a formed component. A clear inspection map helps connect starting stock to the most demanding regions of the final shell.

Products & manufacturing

Plate and sheet with an agreed thickness basis and forming allowance.

Service & design review

Identify thinning-sensitive areas, measurement access and the stage at which minimum wall must be demonstrated.

Purchase & inspection priorities

Agree measurement method, locations and reporting for incoming stock and the formed part separately.

Send your application details

Application review / 05

Welded curved-panel joints

A curved shell assembled from several panels needs controlled edges and joint alignment. Material identity alone does not determine the behavior of the seam or the distortion after welding.

Products & manufacturing

Cut plate panels, joint strips and representative weld coupons.

Service & design review

Provide joint preparation, panel fit-up limits, welding sequence and the controlled joining procedure.

Purchase & inspection priorities

Inspect material and edge condition before welding, then apply the specified joint examination and final contour checks.

Send your application details

Application review / 06

Impact and toughness requirements

An impact requirement needs a defined specimen, direction, temperature and material stage. Published research results should not be copied into an order without considering the actual product thickness and processing.

Products & manufacturing

Representative plate and specimens associated with the supplied or fabricated condition.

Service & design review

State the applicable test standard, sample orientation, test temperature and whether results are required after forming or welding.

Purchase & inspection priorities

Agree acceptance criteria and sampling with the responsible engineer, retaining traceability to the evaluated plate and process history.

Send your application details

Application review / 07

Forming-route qualification

A new shell geometry or changed material route can require a forming trial. The trial is useful only if it reproduces the stock condition and critical features that matter in production.

Products & manufacturing

Matched blanks and coupons from the proposed material source and route.

Service & design review

Define the trial part, process sequence, inspection points and approval milestones before purchasing a large plate lot.

Purchase & inspection priorities

Compare dimensional, surface and required mechanical results after the full trial sequence, then document the accepted production basis.

Send your application details

Application review / 08

Marine shell material records

Complex fabrication divides and combines plate through cutting, forming and joining. A consistent identification plan helps connect final panels and test pieces back to their original material.

Products & manufacturing

Identified plates, nested blanks, joint strips and reserved specimens.

Service & design review

Specify the material map, marking method, protected surfaces and record transfers at each processing stage.

Purchase & inspection priorities

Reconcile plate certificates, cut records, forming lots and weld or test reports before assembly release.

Send your application details
Material references and applicable product standards are listed below. Select the delivery condition and acceptance plan for the specific product and approved application.

TA23 procurement checklist

Connect the application to the material order.

A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.

01

Define the application

Identify shell geometry, interfaces and required assembly testing. Keep acoustic acceptance separate from ordinary material release.

02

Define the supplied stage

TA23 plate and sheet in the thickness and condition specified by the design. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.

03

Define the acceptance evidence

Agree thickness and surface controls for incoming plate, then apply the designer’s acoustic and structural verification to the completed assembly.

Example: a useful TA23 material enquiry

TA23 titanium plate; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.

Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.

Discuss your material requirement ↗

04 / Standards & documentation

Match the standard
to the product.

Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.

Hosted PDFs retain their stated editions. Publisher references open separately when no distributable PDF is provided.
Product / reviewInternational / project routeChinese referenceClarify before quotation
Identity & chemistryApproved product and project specificationGB/T 3620.1-2016View PDF ↗Review the complete chemical limits and product requirements; nominal alloy names do not establish automatic interchangeability.
Ti70 forming and impact research · CN109504877BTi70 forming and impact research · CN109504877BPublisher reference ↗Compare the complete ordered Chinese requirementsSunrui patent publication, 2020. Technical background for Ti70 plate processing and impact evaluation, not a procurement standard.
Marine titanium alloy review · Metal World 2021Marine titanium alloy review · Metal World 2021Publisher reference ↗Compare the complete ordered Chinese requirementsBaoti-authored review identifies TA23 / Ti70 and marine plate applications. Published examples do not establish a supplied-lot guarantee.
CN109504877B · English translationProject and product requirements remain separately definedCN109504877B · English translationView PDF ↗High-impact-toughness and high-ductility TA23 alloy plate. Original publication: 2020-04-14. Near-alpha Ti-2.5Al-2Zr-1Fe plate; forming, welding, impact performance and sonar-fairing material research. English reference translation; original Chinese publication controls. Not a purchase specification.
Drawing-based blanks & partsApproved drawing and controlled manufacturing planAgreed product / project specificationDefine the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification.
Agree the order basis.

The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.

Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.

05 / Order coordination

Know the scope
before ordering.

Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

TA23 qualification coupons — application illustration
Component application illustration. Actual material records, inspection and performance tests are defined for the order.
A quotation you can evaluate

Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.

  • Identify whether inspection, samples and tooling are included.
  • Confirm packaging, transport and delivery terms.
  • Record items that still need technical confirmation.
Acceptance agreed before supply

Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.

Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.

Delivery with clear milestones

Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.

Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.

One contact when an issue arises

Contact TiHubs with the order reference, affected items and supporting photos or inspection records.

We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.

01 / Material identity

Material records

Grade, standard, test results and heat or batch identity matched to the supplied items.

  • Material certificate
  • Heat / batch ID
  • Test results
02 / Agreed acceptance

Inspection records

Dimensional and testing records for the agreed scope, including critical drawing requirements.

  • Dimensions
  • Agreed testing
  • Acceptance criteria
03 / Ready for dispatch

Dispatch records

Item identification, packing list, protective packaging and required shipment documents.

  • Packing list
  • Item labels
  • Shipping documents

06 / Questions before sourcing

Before you specify
TA23 / Ti70.

A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.

A useful first enquiry

  • Product and specificationProduct form, standard edition, dimensions and material condition.
  • Order and deliveryQuantity, destination and any required delivery date.
  • Acceptance requirementsDrawing revision, inspection, certificates and packaging.

Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.

Discuss your requirement

What happens next: requirement review, technical clarification, then a supply proposal and quotation.

Are TA23 and Ti70 the same naming route?

Ti70 is the common alloy name associated with TA23. Use both names together with the exact product specification and supplied condition.

What is this page’s main product focus?

Plate, sheet and developed forming blanks for acoustic covers and complex marine shells. Converted shapes are project enquiries subject to confirmed capability.

Does TA23 plate guarantee acoustic transparency?

No. Acoustic performance must be defined and verified for the complete assembly, including geometry, wall thickness, joints and test conditions.

Why state minimum wall after forming?

Curved-shell forming can produce local thinning. The initial nominal plate thickness alone does not demonstrate the required finished wall.

Can complex curved blanks be quoted?

They can be reviewed from a surface model, datums, trim line, thickness limits and approved forming route. Clarify whether you need flat stock or an intermediate formed shape.

Is TA23 interchangeable with TA24 / Ti75?

No automatic substitution is claimed. They have different alloy chemistries and need a complete material, processing and acceptance comparison.

How should impact requirements be specified?

Identify the method, specimen and orientation, test temperature, sampling and material stage. Agree criteria appropriate to the product and intended fabrication.

Should weld trials use the actual plate thickness?

Use representative production material as required by the qualification plan, including thickness, condition, orientation and the intended joining sequence.

What information is needed for a TA23 quotation?

Send the application, plate or blank dimensions, surface model where relevant, condition, forming and welding stages, standard editions, inspection plan, quantity and delivery requirements.

07 / Your next step

Start with the
requirement you have.

Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.

  1. Requirement review
  2. Technical clarification
  3. Supply proposal and quotation

Combine materials and parts in one enquiry.

Send one list of TA23 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.

Share the service and acceptance priorities.

Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.

Baoji, China · info@tihubs.com

Start your TA23 / Ti70 enquiry

Send your material form, drawing or process conditions. We will help clarify the remaining requirements.

Customer Feedback & RFQ Form (#6)