TA16 / Ti-2Al-2.5Zr titanium products on a dark metallic background

TA16 / Ti-2Al-2.5Zr · Alpha titanium alloy

TA16 / Ti-2Al-2.5Zr. Seamless tubing starts with wall control.

Discuss TA16 tube and hollow-stock enquiries with rolling condition, wall uniformity, annealing, straightness and tube-end fabrication defined together.

Start with a specification, drawing or application. We’ll help identify the details still needed.

Material review. Supply coordination.
One contact in Baoji, China.

TA16 / Ti-2Al-2.5ZrTi-2Al-2.5Zr
Alpha titanium alloySeamless tube & controlled hollow stock
One contact20 years of founder experience · 100+ Baoji factories

01 / Product forms

Find your TA16 product.

Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TA16 seamless titanium tube — illustrative supply form
01 / 06

TA16 / Ti-2Al-2.5Zr

TA16 seamless titanium tube

Priority enquiry for precision fluid and equipment tubing with a confirmed grade-specific route.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Outside diameter, wall basis, length, straightness and end condition.
Manufacturing review
Specify final annealed or other approved condition and any subsequent bends.
Inspection priorities
Wall eccentricity, surface defects, dimensions and specified integrity tests.
TA16 tube shells and hollows — illustrative supply form
02 / 06

TA16 / Ti-2Al-2.5Zr

TA16 tube shells and hollows

Thick-wall intermediate stock for an agreed downstream rolling or machining process.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Outside and inside diameters, wall uniformity, length and surface allowance.
Manufacturing review
Define the intended reductions, internal surface preparation and thermal state.
Inspection priorities
Incoming wall distribution, internal cleanliness, structure and traceability.
TA16 bent-tube enquiries — illustrative supply form
03 / 06

TA16 / Ti-2Al-2.5Zr

TA16 bent-tube enquiries

Illustrative bends for an approved tube-fabrication drawing.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Bend radius, angle, tangent lengths, ovality and minimum wall.
Manufacturing review
Review material condition and intermediate processing for the actual geometry.
Inspection priorities
Wall thinning, wrinkles, cracks and post-bend integrity requirements.
TA16 titanium bar — illustrative supply form
04 / 06

TA16 / Ti-2Al-2.5Zr

TA16 titanium bar

Matching-grade stock for small machined details and approved conversion enquiries.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Diameter, length, straightness and machining allowance.
Manufacturing review
Define fittings or other end use and the required delivered condition.
Inspection priorities
Material analysis, dimensional checks and product-specific mechanical testing.
TA16 sheet enquiries — illustrative supply form
05 / 06

TA16 / Ti-2Al-2.5Zr

TA16 sheet enquiries

Flat stock for project-approved ancillary fabricated details, subject to thickness capability.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Thickness, outline, flatness and surface finish.
Manufacturing review
State the joining and forming needs separately from the tube order.
Inspection priorities
Surface quality, dimensions and the agreed sheet acceptance basis.
TA16 tube-end and sleeve blanks — illustrative supply form
06 / 06

TA16 / Ti-2Al-2.5Zr

TA16 tube-end and sleeve blanks

Tubular blanks prepared for a defined end connection or machining operation.

Specification
Approved grade-specific product specification, drawing revision and delivery condition; confirm supply feasibility.
Size & delivery
Bore, wall, end length, sealing allowance and concentricity.
Manufacturing review
Review cutting, end forming, cleaning and the joining interface.
Inspection priorities
End geometry, cleanliness and traceability to the parent tube or stock.

Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.

Define the shape. Share the service.

These details help turn a material enquiry into a comparable quotation.

01 / Drawing review

Precision seamless fluid lines

Finished seamless tube and cut lengths. Specify full-size dimensional checks and the required tube integrity examination.

Discuss your drawing

02 / Drawing review

Marine tubing project review

Straight tube and approved connection blanks. Agree the applicable tube and assembly tests, including any service-specific corrosion evaluation.

Discuss your drawing

03 / Drawing review

Tube-shell conversion supply

Thick-wall hollows and tube shells. Inspect inner and outer surfaces, wall eccentricity and structure before releasing conversion stock.

Discuss your drawing

02 / Material identity

What is TA16 / Ti-2Al-2.5Zr titanium?

TA16 is the Ti-2Al-2.5Zr alloy system. Its distinctive focus here is seamless tube manufacture and the dimensional and structural quality of cold-worked tubing. Recent primary research examines rolling and recrystallization in this alloy, reinforcing the need to specify the delivered state rather than rely only on nominal chemistry. Marine or industrial service remains subject to the approved design and tube specification.

Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.

Review itemOrder basisWhat to confirm
Tube-wall consistencyMinimum wall and eccentricitySpecify measurement coverage and limits along the finished seamless tube.
Cold-worked conditionReduction and annealing routeLink mechanical acceptance to the ordered final thermal condition and process history.
Internal surfaceBore inspection requirementDefine cleanliness, surface discontinuity limits and any special endoscopic examination.
Bend and connection geometryAssembly drawingControl ovality, wall thinning, bend radius and end dimensions at the finished supply stage.
Tube examinationProject test specificationAgree NDT, leak or pressure testing, sample frequency and documentation before production.
Selected element · wt %Reference composition
Aluminium · Al1.8–2.5
Zirconium · Zr2.0–3.0
Iron · Fe0.25 max
Oxygen · O0.15 max
Hydrogen · H0.006 max
Titanium · TiBalance

Selected composition limits, wt %, from GB/T 3620.1-2016. Use the complete ordered standard for all impurity, residual-element and analysis requirements.

TA16 versus ASTM Grade 16

TA16 is an aluminium-zirconium alloy. ASTM Grade 16 is a palladium-bearing commercially pure grade; these are unrelated purchasing identities.

TA16 versus TA18

TA18 uses the Ti-3Al-2.5V system. Do not assume its tube specification, forming window or properties apply to TA16.

Tube shell versus finished tube

A thick-wall hollow for further rolling is an intermediate product. Finished tube needs its own dimensions, condition and integrity acceptance.

Cold-worked versus annealed state

Work history and recrystallization influence tube behaviour. State whether the supplied tube is an intermediate or final-condition product.

03 / Application priorities

TA16 in application.

Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.

Application review / 01

Precision seamless fluid lines

A small-bore TA16 line needs a controlled flow passage and minimum wall. Those dimensional requirements should be stated before the manufacturing route is selected.

Products & manufacturing

Finished seamless tube and cut lengths.

Service & design review

Provide fluid, pressure, temperature, internal finish, allowable wall variation and end interfaces.

Purchase & inspection priorities

Specify full-size dimensional checks and the required tube integrity examination.

Send your application details

Application review / 02

Marine tubing project review

Where a marine design specifies TA16, the material enquiry should include the actual seawater exposure and installation conditions. The alloy name does not determine an allowable pressure.

Products & manufacturing

Straight tube and approved connection blanks.

Service & design review

Describe fluid chemistry, temperature, fouling, crevices, mating materials and support arrangement.

Purchase & inspection priorities

Agree the applicable tube and assembly tests, including any service-specific corrosion evaluation.

Send your application details

Application review / 03

Tube-shell conversion supply

A tube shell is purchased for what it can become. Its wall distribution, surface condition and thermal history need to match the downstream reduction plan.

Products & manufacturing

Thick-wall hollows and tube shells.

Service & design review

Supply starting and target dimensions, planned conversion route and required intermediate condition.

Purchase & inspection priorities

Inspect inner and outer surfaces, wall eccentricity and structure before releasing conversion stock.

Send your application details

Application review / 04

Cold-rolled tube condition

Primary research on TA16 shows that rolling and annealing affect structure and properties. A buyer should identify the final state required, without adopting research parameters as a production recipe.

Products & manufacturing

Cold-worked intermediate or final-condition tube as explicitly ordered.

Service & design review

State downstream forming, mechanical requirements and whether recrystallized material is required.

Purchase & inspection priorities

Link hardness, tensile or structural tests to the actual delivered tube condition.

Send your application details

Application review / 05

Small-diameter wall uniformity

Local wall variation can affect forming and integrity even when average dimensions appear acceptable. Specify the measurement basis and critical locations.

Products & manufacturing

Small-diameter straight tube and representative test lengths.

Service & design review

Define minimum wall, eccentricity, internal diameter and acceptable local surface features.

Purchase & inspection priorities

Agree inspection method and sampling capable of resolving the required size and wall tolerance.

Send your application details

Application review / 06

Bent equipment pipework

A bent TA16 tube must retain a usable bore and wall at the bend. The forming drawing should set the limits that the incoming tube and process must support.

Products & manufacturing

Straight tube and simple bent-length enquiries.

Service & design review

Provide radii, bend sequence, pressure cycles and any end forming after bending.

Purchase & inspection priorities

Check ovality, thinning, wrinkles and final integrity at the specified fabrication stage.

Send your application details

Application review / 07

Tube-end joining and sleeves

The end region may be expanded, machined or joined, changing its local condition. A tube certificate does not alone qualify the connection.

Products & manufacturing

Tube-end blanks, sleeves and matching bar-derived details.

Service & design review

Identify the joint procedure, fit, sealing finish and permitted dimensional change.

Purchase & inspection priorities

Inspect end concentricity and surface quality, then apply the approved joint and assembly tests.

Send your application details

Application review / 08

Clean bore and packing requirements

For precision tubing, debris and handling damage can make otherwise acceptable material unusable. Packaging requirements should reflect the cleanliness expected at assembly.

Products & manufacturing

Cleaned cut tubes and capped lengths where agreed.

Service & design review

Specify cleanliness criteria, permitted residues, drying and end-protection requirements.

Purchase & inspection priorities

Verify bore condition and packaging against the order; retain markings without contaminating critical surfaces.

Send your application details
Material references and applicable product standards are listed below. Select the delivery condition and acceptance plan for the specific product and approved application.

TA16 procurement checklist

Connect the application to the material order.

A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.

01

Define the application

Provide fluid, pressure, temperature, internal finish, allowable wall variation and end interfaces.

02

Define the supplied stage

Finished seamless tube and cut lengths. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.

03

Define the acceptance evidence

Specify full-size dimensional checks and the required tube integrity examination.

Example: a useful TA16 material enquiry

TA16 seamless titanium tube; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.

Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.

Discuss your material requirement ↗

04 / Standards & documentation

Match the standard
to the product.

Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.

Hosted PDFs retain their stated editions. Publisher references open separately when no distributable PDF is provided.
Product / reviewInternational / project routeChinese referenceClarify before quotation
Identity & chemistryApproved product and project specificationGB/T 3620.1-2016View PDF ↗Review the complete chemical limits and product requirements; nominal alloy names do not establish automatic interchangeability.
TA16 multi-pass tube rolling researchTA16 multi-pass tube rolling researchPublisher reference ↗Compare the complete ordered Chinese requirementsPrimary study of Ti-2Al-2.5Zr tube processing; experimental dimensions are not a stock-size commitment.
TA16 tube recrystallization researchTA16 tube recrystallization researchPublisher reference ↗Compare the complete ordered Chinese requirementsPrimary study of annealing response; specify the actual supplied condition and acceptance independently.
Drawing-based blanks & partsApproved drawing and controlled manufacturing planAgreed product / project specificationDefine the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification.
Agree the order basis.

The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.

Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.

05 / Order coordination

Know the scope
before ordering.

Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

TA16 tube-end and sleeve blanks — application illustration
Component application illustration. Actual material records, inspection and performance tests are defined for the order.
A quotation you can evaluate

Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.

  • Identify whether inspection, samples and tooling are included.
  • Confirm packaging, transport and delivery terms.
  • Record items that still need technical confirmation.
Acceptance agreed before supply

Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.

Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.

Delivery with clear milestones

Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.

Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.

One contact when an issue arises

Contact TiHubs with the order reference, affected items and supporting photos or inspection records.

We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.

01 / Material identity

Material records

Grade, standard, test results and heat or batch identity matched to the supplied items.

  • Material certificate
  • Heat / batch ID
  • Test results
02 / Agreed acceptance

Inspection records

Dimensional and testing records for the agreed scope, including critical drawing requirements.

  • Dimensions
  • Agreed testing
  • Acceptance criteria
03 / Ready for dispatch

Dispatch records

Item identification, packing list, protective packaging and required shipment documents.

  • Packing list
  • Item labels
  • Shipping documents

06 / Questions before sourcing

Before you specify
TA16 / Ti-2Al-2.5Zr.

A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.

A useful first enquiry

  • Product and specificationProduct form, standard edition, dimensions and material condition.
  • Order and deliveryQuantity, destination and any required delivery date.
  • Acceptance requirementsDrawing revision, inspection, certificates and packaging.

Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.

Discuss your requirement

What happens next: requirement review, technical clarification, then a supply proposal and quotation.

Is TA16 the same as ASTM Grade 16?

No. TA16 is Ti-2Al-2.5Zr. ASTM Grade 16 is a different palladium-bearing commercially pure titanium grade.

Why is seamless tubing the main focus?

TA16 has an established research and manufacturing context in rolled alloy tubing. This page emphasizes the tube geometry, condition and inspection needed for a useful purchase.

What is a tube shell?

It is hollow intermediate stock intended for further conversion. It should not be accepted as finished tube without the required final processing and tests.

Should I specify cold-worked or annealed tube?

State the condition required by the approved design and downstream process. The two conditions are not interchangeable descriptions.

Can I use TA18 tube requirements for TA16?

Not automatically. The alloy systems differ; use a specification that explicitly covers the intended TA16 product or an approved project requirement.

How should wall tolerance be expressed?

Specify nominal or minimum wall, allowable eccentricity and measurement requirements, including the wall after any bending.

Does tube inspection cover a welded connection?

No. The joining procedure and final assembly need separate acceptance where required.

Can research annealing parameters be used for my order?

They are reference information. Production parameters and acceptance must be qualified for the actual tube size and condition.

What should a TA16 tube enquiry contain?

Include outside diameter, wall basis, length, condition, surface and bore requirements, bends, end connections, tests and quantity.

07 / Your next step

Start with the
requirement you have.

Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.

  1. Requirement review
  2. Technical clarification
  3. Supply proposal and quotation

Combine materials and parts in one enquiry.

Send one list of TA16 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.

Share the service and acceptance priorities.

Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.

Baoji, China · info@tihubs.com

Start your TA16 / Ti-2Al-2.5Zr enquiry

Send your material form, drawing or process conditions. We will help clarify the remaining requirements.

Customer Feedback & RFQ Form (#6)