
TA11 / Ti-811 · Near-alpha titanium alloy
TA11 / Ti-811. Forged stock for compressor components.
Source TA11 / Ti-811 forged bar, forgings and compressor-blade blanks. Define the engine-material specification, thermal condition, microstructure and inspection plan for the intended manufacturing stage.
Start with a specification, drawing or application. We’ll help identify the details still needed.
Material review. Supply coordination.
One contact in Baoji, China.
01 / Product forms
Find your TA11 product.
Choose a material form or application. Send the dimensions, service conditions and required records so we can match the manufacturing route to your order.

TA11 / Ti-811
TA11 forged bar
Forged round stock for compressor-blade preforms and machining programmes that specify Ti-811.
- Specification
- Approved TA11 bar or blade-stock specification; GB/T 3620.1 establishes chemistry only.
- Size & delivery
- Diameter, cut length, straightness, surface condition and forging allowance.
- Manufacturing review
- Specify intended blade conversion, delivered structure and thermal history.
- Inspection priorities
- Directional properties, macro/microstructure, surface preparation and required internal examination.

TA11 / Ti-811
TA11 forging blanks
Oversize forgings and preforms for drawing-approved engine-material applications.
- Specification
- GB/T 3620.1 chemistry plus the approved drawing and forging specification; agree revision and delivery condition.
- Size & delivery
- Blank envelope, largest section, datum faces, machining allowance and test stock.
- Manufacturing review
- Agree deformation route, thermal processing and any source or process qualification requirements.
- Inspection priorities
- Require heat and lot identity, chemical analysis, delivery condition, dimensional results and the agreed mechanical and metallographic tests. Define any NDT method, coverage and acceptance class in the order.

TA11 / Ti-811
Ti-811 compressor-blade blanks
Application illustration: blade preforms and rough-machined blanks for an approved compressor design.
- Specification
- Engine drawing, blade-material specification and controlled manufacturing plan.
- Size & delivery
- Airfoil envelope, root geometry, platform, stock allowance and marking location.
- Manufacturing review
- Review grain flow, root-to-airfoil transition, surface processing and final dimensional inspection.
- Inspection priorities
- Structure, surface integrity and drawing dimensions; finished-blade life and flight approval remain project-specific.

TA11 / Ti-811
Ti-811 disc & hub blanks
Application illustration: forged blanks for disc or hub designs explicitly specified in this alloy.
- Specification
- Approved disc drawing and material/process specification; chemistry alone is insufficient.
- Size & delivery
- Outer diameter, bore allowance, web and rim sections and specimen locations.
- Manufacturing review
- Define grain-flow objectives, thermal uniformity and rough-machining sequence.
- Inspection priorities
- Directional tests, ultrasonic coverage, structure and examination after relevant machining stages.

TA11 / Ti-811
TA11 annular forging enquiries
Drawing-based annular blanks, subject to the specified route and confirmed supply capability.
- Specification
- GB/T 3620.1 chemistry plus the approved drawing and forging specification; agree revision and delivery condition.
- Size & delivery
- Outer and inner diameter, height, wall, stock allowance and route restrictions.
- Manufacturing review
- Distinguish a forged annulus from a ring machined out of a disc; agree the permitted process.
- Inspection priorities
- Dimensional stock, directional properties, internal examination and traceability.

TA11 / Ti-811
TA11 custom machining blanks
Application illustration: rough-machined shapes for controlled engine-material and development programmes.
- Specification
- Drawing revision, material specification and clearly defined delivered stage.
- Size & delivery
- Datums, critical sections, minimum remaining stock and first-article quantity.
- Manufacturing review
- Review roughing, stabilization, finishing and surface protection.
- Inspection priorities
- Agreed dimensional reports, material and process records, and examination of critical surfaces.
Images illustrate material forms and application possibilities. Reference markings identify specification options; they do not establish dual certification, stock availability or approval of finished equipment.
Define the shape. Share the service.
These details help turn a material enquiry into a comparable quotation.
01 / Drawing review
Drawing-controlled blanks
Provide rough and finished drawings, datum positions, critical sections, machining allowance and the intended conversion route.
Discuss your drawing02 / Drawing review
Heat treatment & process sequence
Identify the required delivery condition and subsequent manufacturing steps. Agree process records, sampling stages and dimensional checks after thermal processing.
Discuss your drawing03 / Drawing review
Component inspection planning
Specify surface integrity, microstructure, NDT, dimensional acceptance and traceability. Identify which tests apply to raw material and which apply to the finished component.
Discuss your drawing02 / Material identity
What is TA11 / Ti-811 titanium?
TA11 is associated with Ti-8Al-1Mo-1V, commonly called Ti-811. This near-alpha titanium alloy is known for compressor blade and disc applications where elevated-temperature behaviour matters. The procurement focus is forged bar and drawing-controlled blanks with an explicitly defined process history; a general alloy description does not establish an engine operating limit or component qualification.
Specify the exact standard edition, form and delivery condition. Nominal chemistry is only one part of an order; strength, microstructure, dimensional acceptance and traceability also need to be defined.
| Review item | Order basis | What to confirm |
|---|---|---|
| Material condition | Define the ordered heat-treatment state | Tie test results to the same conversion and thermal history as the supplied product. |
| Strength and ductility | Product- and section-dependent | Specify tensile, proof strength, elongation, sampling location and test direction in the purchase requirement. |
| Microstructure | Agree acceptance limits | Review grain structure, alpha morphology, surface alpha case and metallographic sampling for the manufacturing route. |
| Fatigue and fracture | Application-specific validation | A material tensile certificate does not establish component life. Specify any fatigue, toughness or crack-growth evaluation separately. |
| Non-destructive examination | Drawing / product specification | Define method, calibration, coverage, acceptance class and reporting before production. |
| Selected element · wt % | Reference composition |
|---|---|
| Aluminium · Al | 8 nominal |
| Molybdenum · Mo | 1 nominal |
| Vanadium · V | 1 nominal |
| Titanium · Ti | Balance |
Nominal Ti-8Al-1Mo-1V alloying composition, wt %. These identity values are not acceptance ranges. Apply the complete TA11 / Ti-811 chemistry limits and product requirements from the ordered specification.
TA11 and Ti-811
Ti-811 is the international short name for the Ti-8Al-1Mo-1V family. Compare the full ordered Chinese and international requirements before approving equivalence or dual certification.
Compressor material selection
Blade and disc stock have different geometry, sampling and inspection needs. Select the product route from the approved engine drawing and material specification.
Temperature is a design condition
Datasheet descriptions of elevated-temperature capability are reference information. Actual allowable stress, exposure, creep, fatigue and life must come from the responsible design authority.
Compared with TC11 or TA15
These are different Chinese titanium grades with different compositions and processing requirements. A similar aerospace application is not a basis for substituting one for another.
03 / Application priorities
TA11 in application.
Review each main use through its service conditions, material choice, manufacturing route and acceptance plan. These are sourcing discussions; approved drawings and qualification requirements govern the final component.
Application review / 01
Compressor blades
Compressor blades are the principal application focus for TA11 / Ti-811. The blank must support the approved airfoil and root geometry while preserving the material structure and surface quality required by the engine programme.
Products & manufacturing
Forged bar, blade preforms and rough-machined compressor-blade blanks.
Service & design review
Provide the blade drawing, root form, section transitions, service temperature and fatigue requirements. Identify the approved forging and heat-treatment route and the stages included in delivery.
Purchase & inspection priorities
Specify structure, grain-flow review where required, surface examination and critical dimensions. Finished-blade performance and engine approval require their own qualification evidence.
Application review / 02
Blade-stock forged bar
A bar intended for blade manufacture is purchased to support further deformation or machining. Its surface preparation, structure and traceability should match the conversion process rather than a generic commercial-bar description.
Products & manufacturing
TA11 forged rounds, cut lengths and blade-stock preforms.
Service & design review
State the required bar specification, diameter, length, condition, intended deformation and cropping allowance. Identify sampling positions and any approval of the starting-stock source.
Purchase & inspection priorities
Agree macro/microstructure, mechanical tests, surface criteria and ultrasonic requirements. Retain identity through cutting and downstream blade conversion.
Application review / 03
Compressor discs & hubs
Ti-811 has documented compressor-disc applications, but a disc enquiry needs more than an alloy name. The bore, web and rim can have different sections and inspection access, making the forging route and sampling plan central to purchasing.
Products & manufacturing
Forged discs, hubs and rough-machined blanks to an approved drawing.
Service & design review
Provide principal load directions, bore and rim geometry, thermal condition, test prolongations and any requirements for location-dependent properties.
Purchase & inspection priorities
Agree ultrasonic coverage, structure and directional tests. Include inspection after machining where new critical surfaces become accessible.
Application review / 04
Elevated-temperature material review
TA11 enquiries often involve heat-resistant forged stock. Temperature, exposure time and loading must be stated together: a datasheet temperature reference does not define allowable stress, creep life or fatigue capability for a new component.
Products & manufacturing
Representative bar and forging stock matching the production section and material condition.
Service & design review
Supply the approved service envelope and material test specification. Identify any required elevated-temperature tensile, creep or other project-specific evaluations.
Purchase & inspection priorities
Tie test specimens to the correct heat, section and thermal history. Use results within the approved design and qualification framework.
Application review / 05
Annular engine blanks
An annular blank can be produced through different conversion routes. For TA11, the buyer should identify the qualified route and inspection needs before comparing a forged ring with a machined annulus.
Products & manufacturing
Forged annular blanks or drawing-approved annuli machined from disc stock.
Service & design review
Define dimensions, load orientation, route restrictions, stock allowance, specimen positions and whether repairs or welds are permitted.
Purchase & inspection priorities
Agree dimensional acceptance, directional properties and NDT. Any route change must follow the project approval process.
Application review / 06
Rough machining & thin sections
Airfoils, webs and other thin sections can expose distortion or surface-quality issues during machining. TA11 stock should be ordered with adequate allowance and a sequence that leaves the required final geometry and inspection access.
Products & manufacturing
Forged bar, preforms and rough-machined blade or structural shapes.
Service & design review
Provide CAD and drawing revisions, datums, minimum remaining stock, workholding surfaces and any stabilization treatment. Define which dimensions are accepted at the rough stage.
Purchase & inspection priorities
Inspect usable dimensions and critical surfaces after the agreed operations. Keep the blank linked to its material and process records.
Application review / 07
Engine-source qualification
A new TA11 source or conversion route may require representative first articles and a controlled evidence package. Qualification should reflect the intended section, thermal condition and finished manufacturing route.
Products & manufacturing
Trial bar lots, blade preforms, disc blanks and retained test material.
Service & design review
Agree source approval, manufacturing variables, specimen location, process records and inspection hold points before production. Identify the authority that accepts the results.
Purchase & inspection priorities
Compile the agreed chemistry, structure, mechanical, NDT and dimensional evidence. Do not extend a project-specific approval to unrelated parts or conditions.
Application review / 08
Repeat engine-material orders
Stable revision control helps recurring TA11 supply remain comparable from lot to lot. Buyers should distinguish the raw stock, forging and rough-machined delivery stages in the bill of materials.
Products & manufacturing
Scheduled forged bar, blade blanks and other approved forging configurations.
Service & design review
List specification and drawing revisions, condition, marking, certificate fields, lot segregation and delivery sequence. Establish notification requirements for source or process changes.
Purchase & inspection priorities
Review the document pack and physical identification together before dispatch. TiHubs coordinates sourcing against the agreed project requirements.
TA11 procurement checklist
Connect the application to the material order.
A useful specification connects the intended component, the supplied stock and the acceptance evidence. Share the drawing and known requirements first.
Define the application
Provide the blade drawing, root form, section transitions, service temperature and fatigue requirements. Identify the approved forging and heat-treatment route and the stages included in delivery.
Define the supplied stage
Forged bar, blade preforms and rough-machined compressor-blade blanks. Distinguish raw stock, converted blanks and finished parts. Define who controls subsequent processing.
Define the acceptance evidence
Specify structure, grain-flow review where required, surface examination and critical dimensions. Finished-blade performance and engine approval require their own qualification evidence.
Example: a useful TA11 material enquiry
TA11 forged bar; required dimensions and quantity; standard and drawing revision; delivery condition; intended downstream process; mechanical, structural and dimensional acceptance; traceability, destination and required date.
Identify the approved product specification and any project-specific qualification. The grade designation and chemistry standard alone do not define component acceptance.
Discuss your material requirement ↗04 / Standards & documentation
Match the standard
to the product.
Choose the specification by product form, material condition and application. Identify the required edition on the order; a chemistry standard alone does not define a finished forging or component.
| Product / review | International / project route | Chinese reference | Clarify before quotation |
|---|---|---|---|
| Identity & chemistry | Approved customer / OEM material and process specification | GB/T 3620.1-2016View PDF ↗ | Verify the full composition and ordered product requirements. A Chinese grade name alone does not establish international or dual certification. |
| Forged bar & conversion stock | Approved bar / forging-stock specification | GB/T 2965-2023View PDF ↗ | Confirm the grade, section, delivery condition, sampling and additional aerospace requirements before selecting a release basis. |
| Ti-811 application reference | TIMET TIMETAL 8-1-1 datasheetView PDF ↗ | TA11 project requirements remain separately defined | TIMET identifies compressor blade and disc applications. The datasheet does not replace the approved engine drawing or material acceptance specification. |
| Drawing-based blanks & parts | Approved drawing and controlled manufacturing plan | Agreed product / project specification | Define the supply stage, conversion route, heat treatment, structure, NDT, dimensions and traceability. Material certification is separate from finished component qualification. |
The purchase order must identify the required revision, grade, product form, condition and inspection. Reference documents do not replace design approval, manufacturing qualification or application-specific acceptance.
Request the controlled specification revision for your order. Any substitution, equivalence or dual-certification claim requires a documented comparison and agreement.
05 / Order coordination
Know the scope
before ordering.
Our founder’s 20 years in titanium inform the questions we ask before quotation and the supply options we review with you.

A quotation you can evaluate
Agree the grade, standard edition, dimensions, tolerance, condition and quantity before comparing prices.
- Identify whether inspection, samples and tooling are included.
- Confirm packaging, transport and delivery terms.
- Record items that still need technical confirmation.
Acceptance agreed before supply
Confirm material identity, delivery condition, heat-to-piece traceability, dimensional checks and required testing before production. For converted parts, define inspection after forging, heat treatment and machining, including the specified microstructure and NDT scope.
Independent inspection can be discussed with its scope, timing, acceptance criteria and cost agreed for the order.
Delivery with clear milestones
Review the proposed lead time, approvals, production sequence and dispatch requirements. For several product forms, coordinate document and packing readiness together.
Material substitutions and technical changes require written approval. A schedule deviation should identify the impact, decisions needed and next steps.
One contact when an issue arises
Contact TiHubs with the order reference, affected items and supporting photos or inspection records.
We record the issue, review it against the agreed requirements and coordinate the next steps with the relevant manufacturing parties.
Material records
Grade, standard, test results and heat or batch identity matched to the supplied items.
Inspection records
Dimensional and testing records for the agreed scope, including critical drawing requirements.
Dispatch records
Item identification, packing list, protective packaging and required shipment documents.
06 / Questions before sourcing
Before you specify
TA11 / Ti-811.
A clear material designation is the beginning. Product form, specification revision, material condition and acceptance complete the requirement.
A useful first enquiry
- Product and specificationProduct form, standard edition, dimensions and material condition.
- Order and deliveryQuantity, destination and any required delivery date.
- Acceptance requirementsDrawing revision, inspection, certificates and packaging.
Not every detail is finalized? Send the information you have. We can help identify the questions to resolve before quotation.
What happens next: requirement review, technical clarification, then a supply proposal and quotation.
What is TA11 / Ti-811?
TA11 is associated with Ti-8Al-1Mo-1V, commonly called Ti-811. It is a near-alpha titanium alloy with documented compressor blade and disc applications.
Which products are the main focus?
Forged bar, drawing-controlled forgings and compressor-blade blanks are the priority enquiries. Disc, annular and custom machining blanks require confirmation of the approved route and actual supply scope.
Is TA11 the same as TC11?
No. TA11 / Ti-8Al-1Mo-1V and TC11 are different alloys. Their compositions, material specifications and process qualifications must not be interchanged because their names look similar.
What standard should I use for a TA11 blade blank?
Use the engine drawing and approved blade-material and process specifications. GB/T 3620.1 provides designation and chemistry, but it does not define complete blade-blank acceptance.
Can I use a datasheet temperature as the operating limit?
No. The approved design must establish allowable loading, exposure, creep, fatigue and life for the actual material condition and geometry. Datasheet descriptions are reference information.
Can TiHubs coordinate forged bar for blade production?
Send the bar size, required specification, condition, intended conversion route and inspection plan. We review these with the supply partners before confirming the order scope.
Are disc and ring blanks accepted in the same way?
Not automatically. Geometry, load direction, conversion route, sampling and NDT coverage differ. Specify the drawing and acceptance plan for each product form.
What inspection is important for TA11 forgings?
Define material identity, condition, macro/microstructure, directional mechanical tests, surface quality and required ultrasonic examination. Specify the method, coverage and acceptance criteria.
What should a TA11 RFQ contain?
Include form, size, quantity, drawing revision, material and process specifications, condition, inspection, qualification requirements and destination. State whether you need stock, a forging or a rough-machined blank.
07 / Your next step
Start with the
requirement you have.
Send the product details, drawing or operating conditions you already know. We will identify missing information and discuss a suitable supply route before quotation.
- Requirement review
- Technical clarification
- Supply proposal and quotation
Combine materials and parts in one enquiry.
Send one list of TA11 forms, sizes and quantities. Include drawing revisions, material conditions and items that must be supplied or dispatched together.
Share the service and acceptance priorities.
Include load and temperature conditions, critical sections, required material records, process qualification, inspection, destination and timing.
Baoji, China · info@tihubs.com
Start your TA11 / Ti-811 enquiry
Send your material form, drawing or process conditions. We will help clarify the remaining requirements.
