
Threaded inserts.
Send the mating screw callout and a section through the metal housing. Identify whether the titanium requirement applies to the insert, the housing or both. We use these details to review a wire insert or a drawing-defined solid bushing for quotation.
Select the supply configuration
Use the drawing and the assembly configuration to identify the item to quote.
Free-running wire insert
For the quotation, identify sTI hole, drive feature, installed position.
- STI hole
- drive feature
- installed position
Dimensions and acceptance
Specify a titanium threaded insert by its own material, installed internal thread, parent-hole preparation, blind-hole clearance and inspection records.
| Order item | Include in your enquiry | Why it matters |
|---|---|---|
| Insert material | Grade and condition on approved part or drawing | Record separately from the housing and screw |
| Wire coil | Free-running or screw-locking, tanged or tangless | Name the system, exact part number and installation tool |
| Machined bushing | Internal and external thread, flange or other retention | Control both interfaces and installation datum |
| Example nominal length at 1D | 6 mm for a nominal M6 insert | Computed designation, not the length of a loose coil |
| Example nominal length at 1.5D | 9 mm for the same nominal M6 insert | Obtain actual installed geometry from the selected system |
| Example nominal length at 2D | 12 mm for the same nominal M6 insert | Check usable full threads and screw travel separately |
Your starting specification.
Send the mating screw callout and a section through the metal housing. Identify whether the titanium requirement applies to the insert, the housing or both. We use these details to review a wire insert or a drawing-defined solid bushing for quotation.
The table identifies the basis for the quotation. Confirm material, dimensions, inspection and delivery for the selected part before ordering.
Material and delivery condition
Identify the material on the approved drawing and confirm its product form and condition with the quotation.
Chinese designations and international names are reference routes, not automatic substitutes. Grade, product specification, condition and acceptance requirements must be agreed together.
Open grade cross reference ↗Purchasing situations
A first assembly, a replacement and a repeat order need different evidence.
Free-running wire insert
For the quotation, identify sTI hole, drive feature, installed position. For related supply options, see the parent product guide.
Screw-locking wire insert
For the quotation, identify locking feature, mating finish, cycle requirement.
Replaceable repair insert
For the quotation, identify original system, remaining wall, repair authorization.
Engineering and purchasing guide
Send the mating screw callout and a section through the metal housing. Identify whether the titanium requirement applies to the insert, the housing or both. We use these details to review a wire insert or a drawing-defined solid bushing for quotation.

Wire or solid?. Helical wire, Solid bushing.
Order geometry schematic; not a dimensional drawing.Identify the three materials in the joint
Imagine that a maintenance buyer asks for a titanium insert to restore a threaded mounting hole. The storekeeper finds an unopened packet labelled with the right screw size and the word titanium written on the bin. The work instruction calls the assembly a titanium housing. None of those clues identifies the metal in the packet. In a repair where the insert itself must be titanium, the first question is whether the applicable material requirement points to the insert on the bill of materials or to the surrounding housing.
Trace three items on a section of the joint. The insert receives the male screw. The housing retains the insert. The screw passes through the attached part and engages the internal thread. Write a material designation or controlled part number next to each item. Add finish or lubricant separately where these are specified. If the drawing calls for an existing commercial fastening system, ask which exact supplier reference carries the required material. The availability of titanium in a manufacturer’s material list does not establish that every size, length and locking combination is available in that metal.
A drawing-led solid bushing follows another document trail. A workshop may turn it from bar and machine both threads, while the raw-material producer supplies the bar certificate. Find the link from the batch of bushings back to that stock and from the finished dimensions forward to the assembly drawing. For a purchased wire insert the relevant evidence may instead be the manufacturer’s lot identification, the full catalogue reference and the accompanying certificate. These two routes yield different paperwork. Asking both shops for a generic titanium certificate can leave the critical identification unresolved.
A frequent ambiguity is the phrase “stainless insert for titanium”. That can be a perfectly deliberate design for a titanium housing. It is a different order from a titanium insert with a stainless mating screw. A photograph of a bright grey part settles neither question, and a demonstration with the actual screw proves little about material identity. If a replacement differs from the original bill of materials, mark the proposed change for the design owner’s review. Keep the old and proposed configurations side by side, including the revised external interface where relevant.
Separate identification from joint approval. An insert can be the requested alloy and still be the wrong configuration, or it can fit an unthreaded trial coupon while behaving differently in the production housing. Set a responsible person against each open question. Materials control can reconcile certificates, machining can confirm the parent hole, and the assembly owner can agree the evidence for the joint. This defines what the enquiry must purchase before a promising cross-reference is turned into a production substitution.
Choose the insert architecture and installation method
A helical wire insert makes an internal thread from a coil of formed wire. The outside of the wire engages the prepared housing thread, while its inside presents a thread to the screw. A solid bushing has a continuous wall between its two interfaces. Its inner thread, outer retention and any flange are physical features that can be shown in section. A drawing of the finished screw thread alone leaves the supplier free to quote items with quite different housing and tooling requirements.
On a wire insert, distinguish the means of driving the insert from the way it engages the screw. Tanged and tangless describe installation features. Free-running and screw-locking describe the internal thread’s behaviour with its mating screw. Identify each choice independently. A tangless drive does not by itself establish that the screw will encounter a prevailing torque. A locking feature does not establish how the installation driver engages the part. The manufacturer’s exact series and part number resolve combinations that a short purchase description cannot.
Follow the driver through the installation with a sketch. Does the tool approach along the bore axis after the housing is assembled? Does it clear the adjacent boss? Is there a route to recover a broken-off tang if the drawing requires it to be removed? In a passage leading to a sealed enclosure, discovering an unaccounted-for fragment after closure may require dismantling other parts. A tangless system eliminates a separate break-off tang, but still needs suitable tooling and an appropriate check of the installed condition. Compare the actual process for each quotation.
A solid bushing calls for a different section. Mark the face against which the flange seats, the outer retention detail, the wall between the thread roots and any region the installation tool must engage. A seating face may be obscured by a nearby radius or coating buildup. If it cannot seat fully, the internal thread can end up at the wrong axial position even though its size is correct. Ask the shop how it will see or measure the seating condition once the bushing is in place.
For a repair, include intersecting holes and hidden passages in the housing drawing. A feature crossing the installation path can interrupt a thread or catch the leading end of a coil. Identify the interference and ask for an approved resolution suitable for the actual wall and duty. Adding a countersink or cutting away extra material by habit may change the parent geometry that the design depends upon. Keep the choice of architecture open until the workshop and owner have reviewed both the installation route and a realistic way to recover the housing if the first assembly fails.
Read the length designation against a blind-hole drawing
A blind hole puts four lengths on the same drawing. The drill reaches one depth, the tap produces fully formed housing threads to another, the insert occupies a defined position below the surface, and the screw projects a certain distance under the attached cover. Draw all four from their own reference faces. Buyers sometimes compare the screw length on one supplier’s offer directly with the insert length on another. Neither describes how much space will remain after the cover and its washer are seated.
The length of a wire insert is particularly easy to misread. Take a nominal M6 size purely as an illustration. The lengths called 1D, 1.5D and 2D are respectively 6, 9 and 12 mm on a nominal diameter basis. In its metric tanged table, Heli-Coil explains its calculated nominal length in relation to the actual assembled length plus half a pitch. A free coil changes its geometry as it enters the prepared thread. Measuring several loose coils with a calliper and sorting them according to loose length would discard the manufacturer’s identification convention. Identify the exact series before interpreting its dimensional table.
Consider a separate clearance calculation for an instrument cover. Relative to the face where the cover seats, its screw tip can project from 8.0 to 8.4 mm. The first physical obstruction lies from 9.1 to 9.3 mm below that same face. The smallest clearance is therefore 9.1 minus 8.4, or 0.7 mm. This calculation uses the deepest screw projection and the shallowest obstruction. It is an illustration of the assembly drawing, independent of the M6 length designations above. It establishes neither the full-thread length in contact nor the axial load that the fastening can carry.
If the cover assembly includes a compressible gasket, specify which condition defines the projection. Measuring the loose assembly on a bench can leave more gasket thickness under the screw head than the operating assembly will have. A change in washer thickness or a counterbore machined deeper on a revised cover may also change projection. Recheck the stack from the seating face whenever a relevant dimension changes. State explicitly whether the stated obstruction is the bottom of the hole, a retained drive feature, or the edge of another component.
Give the supplier an opportunity to mark the smallest usable envelope on the drawing. The drill point, incomplete threads at the end of the tap, any remaining tang and entry setback consume different portions of that envelope. If a proposed tool needs access beyond it, the shop should identify the conflict before the housing is cut. An alternative architecture or a revised package may be possible. Changing the drill depth on an expensive housing without checking the section behind it can introduce an entirely different problem.
Specify the housing and the tools as separate deliverables
A box of inserts and a drawing of the final screw thread leave a manufacturing question open. What must the receiving workshop produce in the housing? For a wire system the insert occupies space between the screw and the parent. The supplier’s STI tap produces the specified oversize housing thread for that system. A standard tap selected simply because its marking matches the final screw size prepares a different feature. Ask for the housing detail belonging to the proposed insert, including the relevant tolerance class, entry and usable depth.
If the design uses a turned bushing, start again from its external retention detail. A bushing may have a separate external thread, a seating flange or a feature intended to prevent rotation. A drawing for a helical wire system does not describe any of these features. Even where two inserts accept the same screw, enlarging a previously prepared hole to accept a bushing changes how much metal remains between that hole and an adjacent passage. Obtain a section of the actual housing and mark the boundaries the repair must respect.
Specify who provides the tap, installation driver, gauges and any removal tool. This matters for a small prototype run followed by production in another workshop. An offer might cover installation in the supplier’s fixtures while leaving the owner without a driver for future replacements. Conversely the customer might already own tooling, but for a different drive feature or length range. Have both parties record the series, size, compatibility and ownership of the tooling. Confirm which access must remain available after adjacent parts are installed.
Before a wire insert goes in, the workshop can inspect the prepared parent thread with the STI gauges specified for that system. A gauge checks a defined geometric condition. It does not establish the integrity of every small part of the casting. KATO describes installation problems where local porosity interrupts a thread and the usual gauging does not reveal the missing material. A shop encountering a snag at the same angular position in a series of cast housings should preserve the suspect part and inspect that area. Driving harder or exchanging inserts until one goes in removes information about the fault.
For a first installation, consider witnessing the handover between machining and assembly. Record the housing serial or batch, gauge identity and outcome, tool series and the reference face used for placement. Keep unusual behaviour with the individual part record. If the first assembly has to be removed, document the condition of the parent thread before attempting another installation. The decision then concerns a known hole with a history. A replacement insert should not silently turn that housing into the equivalent of an untouched new part on the release paperwork.
Accept the installed condition and the evidence of retention
Receiving a bag of loose inserts and accepting a housing with an insert already installed are two different inspection events. For loose parts the inspector can check the order reference, material and finish declaration, identification of the lot, packaging and quantity. Once the device is installed, some features disappear from view. Specify the checks that must occur before installation and what record will travel with the assembled housing. A certificate for the loose part alone cannot show how far below the housing face that part was installed.
Describe how the finished internal thread will be checked. Identify the feature, the method appropriate to the selected type, the datum and the stage of manufacture. For a wire insert, confirm the manufacturer’s gauging instructions before trying to run an ordinary plug through a locking feature. For a solid flanged insert, an inspector may also need to check seating, the flange projection and the agreed retention operation. If a tanged installation requires removal and recovery of the tang, the inspection plan should state how the shop confirms recovery in a closed or otherwise inaccessible passage.
A request for a torque certificate needs more detail. Installation torque concerns driving an insert into its housing. Prevailing torque concerns turning the mating screw through a locking feature. Final tightening torque is applied to the assembled joint and depends on the fastener, lubrication and specified procedure. A pull-out test is a different test with an axial load and a defined fixture. An acceptable result from one of these operations does not establish a value for any other. State which component turns, which component is restrained, and which event counts as a pass.
Suppose a production screw turns freely for its first few threads and then stops. Preserve the assembly instead of assuming that the resistance is a normal locking action. Identify the screw size, finish and condition. Confirm whether the specified insert was actually a screw-locking model, and where the locking feature is located. Compare the stop position with the drawing of the blind hole. Check for contact at the screw tip, displaced coils, trapped debris or an installation-depth error using methods that avoid damaging the evidence. With a replacement screw, record whether the observation follows the screw or remains with the housing.
For a specified assembly retention test, ask the design owner to define the fixture, representative housing material, engagement, direction of loading and acceptance criterion. Record the failure mode as well as any numerical result. Movement of the insert in the housing, damage to the male thread and failure of the surrounding parent metal point to different actions. If a test is destructive, separate tested pieces from production and agree the quantity to include in the order. The price of the component is only comparable once the parties agree which pieces will be delivered as usable parts.
Compare quotations and keep replacement parts identifiable
Consider an order for a first-off housing followed, after approval, by a batch of maintenance kits. A supplier quoting the first-off with an installed insert may include hole preparation, installation and a drawing-marked inspection record. Another quotation may cover loose inserts in a bag with a material certificate. Both can show the same nominal screw size and the second price can be far lower. Put the deliverables in separate columns. The buyer then sees which costs will move back to the plant if the simpler offer is selected.
For the prototype, list the number of housings to machine and the number to retain for review, dismantling or a qualification test. Decide whether purchasing needs the loose insert certificate, a traceable allocation to each housing, a dimensional record of the parent thread or an installation report. A serial number for every insert is not always practicable. A controlled lot allocation may provide the required traceability with much less handling. If the plant requires a particular level of identification, make it part of the enquiry before anyone promises a price.
Plan the production kit from the technician’s point of view. A single drawer may hold two nominal lengths with the same screw size, both available in free-running and screw-locking versions. Similar-looking bags and worn colour marks make them difficult to separate. Use an unambiguous part number, description, nominal length convention, locking style and lot reference on the smallest package that the plant intends to keep. If a driver is included in the kit, identify its series and any consumable or replaceable component needed for it to work. Individual packaging must be practical enough to survive the first opening.
The drawing revision that approved the prototype should accompany the repeat order. A proposed change to wire material, bushing wall, lubricant, locking style or drive feature needs to be visible to the person who approved that first assembly. A substitute with the same final screw thread can still require a different hole or tool. Request the reason for the substitution and its effect on the retained sample, inspection method and maintenance procedure. Keep the approved alternate reference alongside the original if both will remain in service.
To obtain a comparable quotation, send the drawing and revision, installation side, screw callout and actual housing material. Specify the insert material, construction, finish, required quantity and whether delivery is loose, installed or in a service kit. Attach an assembly section for blind holes or restricted access. Identify who will supply tooling, who may authorize changes and which inspection documents are due before dispatch. State delivery destination and the split between first-off and series quantities. A supplier can then identify a specific unresolved feature in its offer instead of silently choosing a trade name or a hole size for you.
Inspection points
Agree the acceptance evidence before the first part is released.
Traceable from heat to shipment.
Record separately from the housing and screw
Grade and condition on approved part or drawingName the system, exact part number and installation tool
Free-running or screw-locking, tanged or tanglessControl both interfaces and installation datum
Internal and external thread, flange or other retentionComputed designation, not the length of a loose coil
6 mm for a nominal M6 insertObtain actual installed geometry from the selected system
9 mm for the same nominal M6 insertCheck usable full threads and screw travel separately
12 mm for the same nominal M6 insertSource documents
Check the applicable series, revision and scope against the purchase drawing.
Library PDFs may be earlier editions. Check the document cover and your contractual revision. A reference file does not certify a supplied product.
Explore all downloads ↗Technical sources
- KATO CoilThread inserts — Manufacturer’s material options and wire insert construction.
- KATO installation guide — Prepared STI holes, tools and the installation sequence for the specified system.
- Heli-Coil catalogue HC2000 — Metric tanged table and its definition of nominal length. Material options depend on the series.
- KATO STI gages — Purpose of the working plug gauges for the parent threads.
- KATO casting application note — Local casting defects can remain relevant after thread gauging.
Baoji.
One contact.
TiHubs coordinates titanium sourcing through a local manufacturer network. Your specification guides the supplier review, technical discussion and delivery requirements.
Clarify the requirement
Confirm grade, dimensions, state, quantity and the purpose of the stock.
Review the supply route
Discuss manufacturing, finishing, inspection and documentation with the relevant supplier.
Agree the commercial scope
Confirm the quotation, lead time, acceptance requirements and delivery terms.
Coordinate inspection & delivery
Follow the agreed checks, marking, packing and shipment documentation.
Before you order
Specify a titanium threaded insert by its own material, installed internal thread, parent-hole preparation, blind-hole clearance and inspection records.

TITANIUM THREADED INSERTS · BAOJI SOURCING
Send your specification.
Send the mating screw callout and a section through the metal housing. Identify whether the titanium requirement applies to the insert, the housing or both. We use these details to review a wire insert or a drawing-defined solid bushing for quotation.
